| 1 | 1 | Dismantling R.C.C.works,carefully clearing away the debris as directed during execution. | BI01010001010000000000000515BI0100001112 | 45 | M3 |
|---|
| 2 | 2 | Plastering with cement mortar 1:3 (1cement and 3 Crushed Stone Sand (Commercially called M Sand) 20mm thick including curing, etc., complete. | BI01010001010000000000000515BI0100001113 | 8 | M2 |
|---|
| 3 | 3 | Supplying and fabricating STEEL rods including cutting, bending hooks, cranking, fabricating, assembling and laying in exact position,typing with soft steel wire 16 gauge ,etc., complete conforming to BIS std. | BI01010001010000000000000515BI0100001114 | 2820 | Kgs |
|---|
| 4 | 4 | Supplying and erecting centering for sides and soffits including supports and structting upto 3m high for plane surfaces such asRCC coloumns,top and bottom slabs of boxing. sill labs,sun shades,etc.,with necessary facia using mild steel sheets ofsize 90x60cm and 10 gauge stiffened with welded mild steel angles of size 25x25x3mm for boarding laid over silverOak (country wood) joists of size 10x6.5cm spaced at about 90cmcentre to centre and supported by casuarina props of 10 to 13cm dia spaced at 75cm centre to centre etc.,complete | BI01010001010000000000000515BI0100001115 | 220 | M2 |
|---|
| 5 | 5 | Supplying and placing of Ready Mix M25Graded of Concrete confirming to IS 456/2000 for Reinforcement Cement Concrete Structural elements under controlled water cement ratio using 20mm and down graded machine broken granite stone jelly including transportation and pumping excluding cost of centering and shuttering and reinforcement but including curing,finishing etc as directed by departmental officers. | BI01010001010000000000000515BI0100001116 | 50 | M3 |
|---|
| 6 | 6 | Plastering with cement mortar 1:3 (1 cement and 3 Crushed Stone Sand (Commercially called M-Sand))12mm thick including curing ,etc., complete. | BI01010001010000000000000515BI0100001117 | 180 | M2 |
|---|
| 7 | 7 | Painting the new plastered walls with two coats of Exterior emulsion paint (weather proof ) first class quality and of approved colour over a priming coat including thorough scrapping,clean removal of dirt,etc.,complete and including necessary plaster paris,putty etc., wherever required.as per (ISI STD) (It must provide excellent resistance against the growth of algae and fungi on the walls. And it must offer excellent protection against alkali and UV degradation and the durability period should be 5 years. | BI01010001010000000000000515BI0100001118 | 180 | M2 |
|---|
| 8 | 8 | Earth work excavation for foundation in all kinds of soils invarying depths including dismantling any masonry or roots met within foundation, shoring with planks and baling water if necessary, clearing, levelling the site etc.,complete with initial lead of 10 metre and lift of 2 metre for wide trenches,such as septic tank, effluent tank, etc., | BI01010001010000000000000515BI0100001119 | 145 | M3 |
|---|
| 9 | 9 | Refilling Or Filling With Ex.Earth In Regular Layers Of 150Mm Thick Including Watering And Consolidation By Power Roller. Etc. Complete. | BI01010001010000000000000515BI0100001120 | 100 | M3 |
|---|
| 10 | 10 | Providing Laying Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam Specification Including Premixing The Material (0.396 Cu.M Of 45-22.4Mm Metal 0.528 Cu.M Of 22.4- 2.36Mm Metal 0.396 Cu.M Of 2.36 Mm Size & Below) With Water At Omc In Mechanical Mix Plant Carriage And Transporting The Mixed Material By Tipper To Site Laying In Uniform Layers With Pavers In Sub Base/Base Course On Well Prepared Surface And CUM 2333.6 2172.25 1985.55 Compacting With Vibratory Roller To Achieve The Desired Density Etc. Complete As Per Clause 406 Of Mort & H Specifications.(Compaction By Vibro Max Roller Is A Must) | BI01010001010000000000000515BI0100001121 | 15 | M3 |
|---|
| 11 | 11 | Plain Cement concrete work 1:4:8 (1 cement, 4 Crushed Stone Sand (Commercially called M-Sand) and 8 blue granite broken stone jelly 40mm gauge) including consolidation curing, | BI01010001010000000000000515BI0100001122 | 9 | M3 |
|---|
| 12 | 12 | Brick work with fly ash bricks of size cu.m. 6748.00 6624.00 6627.00 449A 230mm x110mm x70mm inC.M.1:3 (1 cement and 3 Crushed Stone Sand (Commercially called M-Sand)) including curing,etc.,complete for 23cm thick walls upto basement.(upto 1m high above G.L.) | BI01010001010000000000000515BI0100001123 | 43 | M3 |
|---|
| 13 | 13 | Painting the Old plastered walls with two coats of Exterior emulsion paint (weather proof ) first class quality and of approved colour over a priming coat including thorough scrapping,clean removal of dirt,etc.,complete and including necessary plaster paris,putty etc., wherever required.as per (ISI STD) (It must provide excellent resistance against the growth of algae and fungi on the walls. And it must sq.m. 213.04 213.04 213.04 offer excellent protection against alkali and UV degradation and the durability period should be 5 years. | BI01010001010000000000000515BI0100001124 | 400 | M2 |
|---|
| 14 | 14 | Paving the flooring with CEMENT CONCRETE TILES hydraulic pressed Antiskid tiles as perpattern design 20mm thick in cm 1:3 including pointing with colour cement etc., complete.(ISI)\n | BI01010001010000000000000515BI0100001125 | 200 | M2 |
|---|
| 15 | 15 | Extra lift charges for brickworks those in ground floor(i.e. 1m above ground level.\n | BI01010001010000000000000515BI0100001126 | 41 | M3 |
|---|
| 16 | 16 | ROLLING SHUTTERS (WITH ISI MONOGRAM) Supplying and erecting pull and push type rolling shutter with I.S.I make of approved size and section using 18 G.I sheet. The shutter shall be painted with one coat of red oxide primer and the rate is inclusive of Hood covers, transportation charges etc(Manually operated up to 8 sq.m. area) | BI01010001010000000000000515BI0100001127 | 30 | M2 |
|---|
| 17 | 17 | Supplying and Applying the Anticorrosive coating using Fosroc its equivalent over the exposed steel surface at the Deck slab /Pier/Abutment and Girder portion of the Bridge/Flyover/Subway after removing the loose concrete carefully including scaffolding charges. | BI01010001010000000000000515BI0100001128 | 4 | m² |
|---|
| 18 | 18 | Repair a concrete surface using NITOBOND or its equivalent with cement mortar 1:3(1cement and 3riversand) and other incidental charges. | BI01010001010000000000000515BI0100001129 | 4 | m² |
|---|