Municipal Corporation-MC has published Construction Of Cc Culvert Between Paddy Field Of Bhima Behera And Paresh Deo At Ward No . 11 Of Nac Athmallik. Submission Date for this Tender is 07-07-2021. Culvert Tenders in ATHMALLIK Odisha. Bidders can get complete Tender details and download the document.
Name of Work: Construction of CC culvert between Paddy field of Bhima Behera and Paresh Deo at ward no.11 of NAC Athmallik | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Earth work in hard soil or gravelly soil within 50m initial lead and 1.50m initial lift including rough dressing and bracking clods to maximum 5vm to 7 cm and laying in layers to not exceeding 0.30m in depth and as per direction of the departmental 05 | BI01010001010000000000000515BI0100001112 | 19.06 | cum |
2 | 2 | Earth work in hard soil or gravelly soil within 50m initial lead and 1.50m initial lift including rough dressing and bracking clods to maximum 5vm to 7 cm and laying in layers to not exceeding 0.30m in depth and as per direction of the departmental 05 | BI01010001010000000000000515BI0100001112 | 21.6 | cum |
3 | 3 | Filling in foundation and plinth with sand watered and rammed as OPWD specification including all cost of materials labour conveyance royalty cess tools and plants etc all complete required for the work to finished item | BI01010001010000000000000515BI0100001113 | 44.92 | cum |
4 | 4 | Cement concrete in (I:4:8) with 40mm size hand broken hard granite metal including all cost of materials labour conveyance royalty cess tools and plants water for curing etc all complete as per OPWD specification required for the work to finished item | BI01010001010000000000000515BI0100001114 | 1.95 | cum |
5 | 5 | Cement concrete in (I:3:6) with 40mm size hand broken hard granite metal including all cost of materials labour conveyance royalty cess tools and plants water for curing etc all complete as per OPWD specification required for the work to finished item | BI01010001010000000000000515BI0100001114 | 8.2 | cum |
6 | 6 | Cement concrete in (I:2:4) with 12mm size crusher broken hard granite chips including all cost of materials labour conveyance royalty cess tools and plants water for curing etc all complete as per OPWD specification required for the work to finished item | BI01010001010000000000000515BI0100001115 | 0.14 | cum |
7 | 7 | Cement concrete in (I:3:6) with 12mm size crusher broken hard granite chips including all cost of materials labour conveyance royalty cess tools and plants water for curing etc all complete as per OPWD specification required for the work to finished item | BI01010001010000000000000515BI0100001115 | 1.5 | cum |
8 | 8 | Cement concrete work of M20 grade with 20mm and down grade crusher broken hard granite chips including hosting and laying all cost of materials labour conveyance royalty cess tools and plants water for curing etc all complete as per OPWD specification required for work to finished items | BI01010001010000000000000515BI0100001115 | 27.17 | cum |
9 | 9 | Requirement of HYSD MS rod and labour for cutting bending binding straighting and layingthe grills and placing in position including cost of rod and binding weir 18 to 20gauge | BI01010001010000000000000515BI0100001115 | 6.27 | Qtl |
10 | 10 | Rigid and smooth centering and shuttering for CC RCC works in foundation plinth band and footing bases of columns mass concrete precast slabs etc including false work and dismentaling then after casting including cost of materials cess complete in ground floor | BI01010001010000000000000515BI0100001115 | 22.89 | sqm |
11 | 11 | 6mm thick cement plaster in cement mortar (1:4) including cement purning and all cost of materials etc complete | BI01010001010000000000000515BI0100001115 | 8.06 | sqm |
12 | 12 | Laying and fixing in position RCC spun pipes with collars jointed with cement mortar (1:3) complete excluding cost of spun pipes and collars | BI01010001010000000000000515BI0100001115 | 9.6 | Mtr |
13 | 13 | Requirement and cost of Themo cool 10mm thick for expansion joint 5mtr interval 304 | BI01010001010000000000000515BI0100001115 | 2.66 | sqm |
14 | 14 | Requirement of cost of Humes pipe | BI01010001010000000000000515BI0100001119 | 9.6 | Mtr |
15 | 15 | Cost of Display board paint and letter writing over display board | BI01010001010000000000000515BI0100001119 | 1 | Nos |