Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
BKPL Barauni Pump Station → Bihar
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Maintenance And Servicing Of Fire Fighting Equipments And Systems In Bkpl , Group A Bkpl Barauni Pump Station , Checking , Inspection , Servicing And Maintenance Of Fire Fighting System , Equipments Hydrants , Extinguishers Of All Type ( Dcp/Co2/Clean Agent ) , Water Monitor Up To The Mark As Per Oisd/Isi Standards To Provide & Best Functioning Of The Equipments Always In Best Healthy Condition Inclusive Of Periodically Cleaning , Checking /Inspection/Oiling/ Greasing Of Assemblies Such As Coupling , Nozzles , Valves , Hydrants , Extinguishers , Hose Pipes , Water Monitor , Compounds Drums , Nozzles Foam Bunch , Hose Boxes , Sand Buckets Etc , Updating The Data & Identification Tags , Recording The Status Of Checking In History Register Etc . As Directed By The Engineers In Charge With All Labors , Carriages , Materials Etc . Complete Inclusive Of All Taxes . ( Inspection And Servicing Of The Equipment/Fire Fighting Facilities Is To Be Done Periodically As Mentioned Against Each ) :- , Fire Hydrants ( Double Headed ) On Monthly Basis , Fire Extinguishers Of All Types & Capacities On Monthly Basis , Hose Boxes - Monthly Basis , Valves Of Fire Line Of All Sizes Including Contractor Supplied Grease Of Suitable Quality On Monthly Basis . , Foam /Water Monitors On Monthly Basis/Mefg , Sand Buckets With Stands With All Bucket On Monthly Basis , Taking Delivery And Refilling The Extinguishers Of Various Sizes /Capabilities Including Supply Of Dry Chemical Powder , Co2 Gas Etc Updating The Data & Identification Tags , Recording The Status Of Checking In History Register Etc As Per Isi Standard And Replacing The Same As Directed By Engineer-In-Charge . ( The Co2 Cylinder May To Be Taken Out And Delivered Back Within 10 Days After Re-Filling /Repairing . However Fire Extinguishers Co2 Are To Be Supplied /Kept Temporary In Place Of Each Fire Extinguisher For Which Taking Out For Re-Filling /Repairing Is Required ) . , Dry Chemical Powder , 0 . 2 Kg Dcp Cartridge , 2 Kg Co2 Cylinder , 6 . 8 Kg Co2 Cylinder , 2Kg Clean Agent Cylinder , Supply And Replacing The Spares /Assembles Etc Of The Fire Fighting Equipments System For All Sizes / Capacities As Per Isi Standard And Approved Make With All Labours , Materials , Carriages , Inclusive Of All Taxes Etc . Complete , Supply And Installation Of Clear Pvc , Spiral Wound Hose ( Pick-Up Tube ) Of Length 3 M Length And Dia 40 Mm With Ss Jublee Clamp For Tightningsuitable For Existing Connectors Of 750 Gpm Monitor , Hydrants Sheet Washer/Rubber Including Fitting At Site . , Hydrants Coupling Washer , Rubber Washer For Extinguisher , Co2 Safety Valves 155Kgf/Cm2 , Co2 Safety Pins , Isi Marked Discharge Pipe With Horn For 2Kg , 3 . 2Kg , 4 . 5Kg Co2extinguishers , Isi Marked Discharge Pipe With Horn For 6 . 5 Kg And 6 . 8Kg Co2 Exitinguishers . , Rubber Gasket Of Dcp Main Cap , Hose Plunger Set & Nut . , Hose Spring & Nut , Dcp Main Cap ( Gun Metal ) Cp , Dcp Plunger Pin With Spring , Dcp Plunger Top , Squeezing Grip ( Plastic ) Nozzle , Replacement Of Fire Hose Box Glass ( Front ) , Dcp Cylinder Discharge Pipe Of Sufficient Length For 10 Kg Capacity Fire Extinguisher , Dcp Cylinder Discharge Pipe Of Sufficient Length For 75 Kg Capacity Fire Extinguisher , Supply And Fitting Of Plastic Blank Cap ( As Per Is 5290 , Red Colourwith Gi Chain ) Suitable For 63 Mm Hydrant Outlet As Per Direction Of Eic , Supply And Painting With Two Coats Synthetic Enamel Paint ( Asian/Burger ) Fire Paint Including Scrapping , Cleaning , Applying One Coat Of Red Oxide Primer Cost Of All Labours , Materials , Carriage , Taxes , Letter/Number Writing , Identification Marks Etc . Complete In All Respect . , Brush Painting Of Fire Hose Boxes ( Inside And Out Side ) Including Stand With Two Coat Of Paint Including Letter/Number Writing ( Colour To Be Specified By Eic ) , Spray/Brush Painting Of Fire Bucket Stand With Its Buckets ( 4-6 Bucket Set ) Including Letter/Number Writing . , Spray Painiting Of Fire Extinguishers Of All Sizes Including Letter/Number Writing . , Spray/ Brush Painting Of Foam/Water Monitors/Double Hydrant Valves Along With Its Stand Post Including Letter/Number Writing . , Fire Siren Including Letter / Number Writing . , Others , Ppe Maintenance / Up-Keeping / Cleaning On Monthly Basis Of Various Items Like Helmets , Breathing Apparatus , Water Jel Blanket , Asbestos Blanket , Hand Gloves ( Rubber / Asbestos ) , First-Aid Box , Stretcher , Resuscicator , Safety Belt , Ear-Muffs , Fire Proximity Suits , Safety Torch , Safety Goggles Including The Cost Of Labour , Material Etc . Complete As Per Instruction Of Engineer-In-Charge . , Cleaning & Stacking Properly The Foam Containers , Updating Stock , Date Of Expiry , Date Of Manufacturing On Board And In Register , Placing Foam Containers At The Foam Monitors And Water Hydrants . , Taking Hose Pipe For Hydrotesting And Keeping It Back In Positionafter Drying /Rolling Inclusive Of All Taxes . , Air Filling In Cylinders Of Breathing Apparatus Inclusive Of All Cost With Transportation . , Hydraulic Testing Of Co2 Cylinders Inclusive Of All Taxes ( 2 To 4 . 5 Kg/Cm2 ) , Hydraulic Testing Of Co2 Cylinders Inclusive Of All Taxes ( 6 . 8 Kg/Cm2 ) , Hydraulic Testing Of Dcp Cylinders Of All Sizes Inclusive Of All Taxes , Hydraulic Testing Of Breathing Appratus Set , Supply & Pasting Of Slips On The Extinguishers Showing How To Use The Extinguishers & Date Wise Maintenance Records Of Fire Extingusher . The Good Quality Of Adehsive To Be Used On Slips For Sticking On The Extinguishers Inclusive Of All Taxes As Per Direction Of Engineer-In-Charge . , Supply And Fixing Of Wind Socks On The Position Including All Labour , Tolls And Tackels As Per Direction Of Engineer-In-Charge Inclusive Of All . , Patch Work Welding On The Firefighting/Foam Line In Case Of Leakage Including All Manpower & Materials With Tools And Tackels With Materials Required As Per Satisfaction Of The Engieer-In-Charge Upto 12X12 Size Inclusive Of All . , First Aid Box With Snake Serum , Fire Bucket , Safety Helmet , Lettering With Black Japan Paint Of Approved Brand And Manufacture . ( Note: Unit Ea Shall Mean Per Letter Per Cm Height ) . , Supply & Fitting Of Transparent Acrylic Sheet Thickness 3 Mm Of Hose Box Inclusive Of Rubber Beeding By Fixing It With Proper Adhesive Wherever Required Complete In All Respect Inclusive Of Material , Labours , Consumables Etc . ( Inclusive Of Rates For Both Glasses And Rubber Beading . , Complete Overhauling Of Hand Operated Siren Including Oiling , Greasing , Painting And Testing As Per Direction Of Eic Inclusive Of All Tools & Tackles , Transportation , Man-Power Etc , Testing Of Afff As Per Bis:4989 From Reputed Institutes Like Girda Or Any Other Approved Laboratory In All Respect By Providing Cas , Transportation , Man Power Etc . , Maintenance And Calibration Of Multigas Detector Sensor ( Lel , O2 , Co , H2s ) The Charges Includes Cost Ofcalibrating Canisters Inspection , Maintenence Of The Detectors And Issuance Of The Calibration Certificates The Cost Of Sending Lel Meterto The Party Workshop ( In India ) Will Be In The Scope Of Iocl But After Calibraiton And Completion Of Work Thecost Of Transportation Of Lel Meter To Iocl Installation Shall Be In Thescope Of Vendor . Rate Are For Calibration Of All Sensor , Make: M/S Respo Products Model: Qrae Ii , , Make: Bw ( Honeywell ) Model: Gasalertmax X , Fire Water Line , Dismantling Of Gate Valves Of Sizes Up To 8 Of Fire Hydrant Line E Etc From Bonnet Cleaning And Lapping The Gate And Refixing It With New Gasket ( Iocl Supplied ) Alongwith All Tools , Tackles , Material , Manpower Etc , Removal And Installation Of Of Faulty Gate Valves/Nrv/Glove Valve/Strainer Upto 8 Inch Size Including Transportation Either From Owners Storage Point To Workshop Or Work Sit

BOQ

Name of Work: Maintenance & servicing of fire fighting equipments & systems in BKPL, Group A - BKPL Barauni Pump Station
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Checking, Inspection, Servicing and Maintenance of Fire Fighting System, equipments hydrants, extinguishers of all type(DCP/CO2/Clean Agent), Water monitor up to the mark as per OISD/ISI Standards to provide & best functioning of the equipments always in best healthy condition inclusive of periodically cleaning, checking /inspection/oiling/ greasing of assemblies such as coupling, nozzles, valves, hydrants, extinguishers, hose pipes, water monitor, compounds drums, nozzles foam bunch, hose boxes, sand buckets etc, updating the data & identification tags, recording the status of checking in history register etc. as directed by the engineers in charge with all labors, carriages, materials etc. complete inclusive of all taxes. (inspection and servicing of the equipment/Fire Fighting facilities is to be done periodically as mentioned against each):-itemcode 1
22Fire Hydrants (double headed) on Monthly Basisitemcode 2648EA
33Fire Extinguishers of all types & capacities on Monthly Basisitemcode 32136EA
44Hose Boxes - Monthly Basisitemcode 4288EA
55Valves of Fire line of all sizes including Contractor supplied grease of suitable quality on Monthly Basis.itemcode 51368EA
66Foam /Water Monitors on Monthly Basis/MEFGitemcode 6504EA
77Sand buckets with stands with all bucket on Monthly Basisitemcode 7960EA
88Taking delivery and refilling the extinguishers of various sizes /capabilities including supply of dry chemical powder, CO2 gas etc updating the data & identification tags, recording the status of checking in history register etc as per ISI standard and replacing the same as directed by Engineer-in-Charge. (The CO2 cylinder may to be taken out and delivered back within 10 days after re-filling /repairing. However Fire extinguishers CO2 are to be supplied /Kept temporary in place of each fire extinguisher for which taking out for re-filling /repairing is required).itemcode 8
99Dry Chemical Powderitemcode 94080KG
10100.2 kg DCP Cartridgeitemcode 10120EA
11112 kg CO2 Cylinderitemcode 1140EA
12126.8 kg CO2 Cylinderitemcode 1240EA
13132Kg Clean Agent Cylinderitemcode 1340EA
1414Supply and replacing the spares /assembles etc of the Fire Fighting equipments system for all sizes / Capacities as per ISI standard and approved make with all labours, materials, carriages, inclusive of all taxes etc. completeitemcode 14
1515Supply and installation of Clear PVC, Spiral wound hose (pick-up tube)of length 3 m length and dia 40 mm with SS jublee clamp for tightningsuitable for existing connectors of 750 GPM Monitoritemcode 1544EA
1616Hydrants Sheet Washer/Rubber including fitting at site.itemcode 16216EA
1717Hydrants coupling washeritemcode 17216EA
1818Rubber washer for Extinguisheritemcode 18188EA
1919CO2 Safety valves 155kgf/cm2itemcode 1920EA
2020CO2 Safety pinsitemcode 20160EA
2121ISI marked Discharge pipe with Horn for 2Kg,3.2Kg,4.5Kg CO2extinguishersitemcode 2130EA
2222ISI marked Discharge Pipe with horn for 6.5 Kg and 6.8Kg CO2 Exitinguishers.itemcode 2230EA
2323Rubber Gasket OF DCP Main Capitemcode 23154EA
2424Hose Plunger Set & Nut.itemcode 2448EA
2525Hose Spring & nutitemcode 2548EA
2626DCP main Cap (gun metal) CPitemcode 2630EA
2727DCP Plunger Pin with Springitemcode 2730EA
2828DCP Plunger topitemcode 2830EA
2929Squeezing grip (Plastic) nozzleitemcode 2970EA
3030Replacement of fire hose box glass (front)itemcode 3032EA
3131DCP cylinder discharge pipe of sufficient length for 10 Kg capacity Fire Extinguisheritemcode 3150EA
3232DCP cylinder discharge pipe of sufficient length for 75 Kg capacity Fire Extinguisheritemcode 3210EA
3333Supply and fitting of plastic blank cap (as per IS 5290 , red colourwith GI chain) suitable for 63 mm hydrant outlet as per direction of EICitemcode 3364EA
3434Supply and painting with two coats synthetic enamel paint ( Asian/Burger) fire paint including scrapping, cleaning, applying one coat of red oxide primer cost of all labours, materials, carriage, taxes, letter/number writing, identification marks etc. complete in all respect.itemcode 34
3535Brush painting of fire hose boxes ( Inside and out side) including stand with two coat of Paint including letter/number writing ( Colour to be specified by EIC)itemcode 3524EA
3636Spray/Brush painting of fire bucket stand with its buckets (4-6 Bucket set) including letter/number writing.itemcode 3680EA
3737Spray painiting of Fire extinguishers of all sizes including letter/number writing.itemcode 37174EA
3838Spray/ brush painting of Foam/water monitors/Double hydrant valves along with its stand post including letter/number writing.itemcode 3888EA
3939Fire Siren including letter / number writing.itemcode 398EA
4040OTHERSitemcode 40
4141PPE maintenance / up-keeping / cleaning on Monthly Basis of various items like helmets, Breathing apparatus, Water jel blanket, Asbestos blanket,hand gloves (rubber / asbestos), first-aid box, stretcher, resuscicator, safety belt, ear-muffs, fire proximity suits, safety torch, safety goggles including the cost of labour, material etc. complete as per instruction of Engineer-in-Charge.itemcode 4124MON
4242Cleaning & stacking properly the foam containers, updating stock, date of expiry, date of manufacturing on board and in register, placing foam containers at the foam monitors and water hydrants.itemcode 4224MON
4343Taking hose pipe for hydrotesting and keeping it back in positionafter drying /rolling inclusive of all taxes.\"itemcode 4396EA
4444Air filling in cylinders of Breathing Apparatus inclusive of all cost with transportation.itemcode 4416EA
4545Hydraulic testing of CO2 Cylinders inclusive of all taxes ( 2 to 4.5 Kg/cm2)itemcode 4520EA
4646Hydraulic testing of CO2 Cylinders inclusive of all taxes ( 6.8 Kg/cm2)itemcode 4620EA
4747Hydraulic testing of DCP Cylinders of all sizes inclusive of all taxesitemcode 47134EA
4848Hydraulic testing of Breathing Appratus Setitemcode 488EA
4949Supply & pasting of slips on the extinguishers showing how to use the extinguishers & date wise maintenance records of Fire Extingusher. The good quality of adehsive to be used on slips for sticking on the extinguishers inclusive of all taxes as per direction of Engineer-in-Charge.itemcode 49174EA
5050Supply and fixing of wind socks on the position including all labour, tolls and tackels as per direction of Engineer-in-Charge inclusive of all.itemcode 5080EA
5151Patch work welding on the Firefighting/Foam Line in case of leakage including all manpower & materials with tools and tackels with materials required as per satisfaction of the Engieer-In-Charge upto 12\"x12\" size inclusive of all.itemcode 5160EA
5252First Aid Box with Snake serumitemcode 5220EA
5353Fire Bucketitemcode 5340EA
5454Safety Helmetitemcode 5458EA
5555Lettering with Black Japan paint of approved brand and manufacture. (Note: Unit \"EA\" shall mean \"PER LETTER PER CM HEIGHT\").itemcode 5520000EA
5656Supply & Fitting of transparent acrylic sheet thickness 3 mm of hose box inclusive of rubber beeding by fixing it with proper adhesive wherever required complete in all respect inclusive of material, labours, consumables etc. (inclusive of rates for both glasses and rubber beading.itemcode 5648EA
5757Complete Overhauling of Hand operated Siren including oiling,greasing ,painting and testing as per direction of EIC inclusive of all tools & tackles,transportation ,man-power etcitemcode 578EA
5858Testing of AFFF as per BIS:4989 from reputed institutes like GIRDA or any other approved laboratory in all respect by providing cas ,transportation, man power etc.itemcode 588EA
5959Maintenance and Calibration of Multigas Detector Sensor (LEL, O2, CO, H2S) The charges includes cost ofcalibrating canisters inspection , maintenence of the detectors and issuance of the calibration certificates The cost of Sending LEL meterto the party workshop (in india) will be in the Scope of IOCL but after calibraiton and completion of work thecost of transportation of LEL meter to IOCL installation shall be in thescope of Vendor. Rate are for calibration of all sensoritemcode 59
6060Make: M/s Respo Products Model: QRAE II,itemcode 6012EA
6161Make: BW(Honeywell) Model: GasAlertMax Xitemcode 618EA
6262FIRE WATER LINEitemcode 62
6363Dismantling of gate valves of sizes up to 8\" of fire hydrant line e etc from bonnet cleaning and lapping the gate and refixing it with new gasket (iocl supplied) alongwith all tools, tackles, material, manpower etcitemcode 6330EA
6464Removal and Installation of of faulty Gate valves/NRV/Glove Valve/Strainer upto 8 inch size including transportation either from owners storage point to workshop or work site including tools tackles, labour, etc as per directions of engineer in charge. For removing of valves it may be required to cut jammed stud & bolts etc.)itemcode 6430EA
65654\",6\" and 8 \" gate valve stem gland packing by supplying and fitting of 100% PTFE (zero leak ) material as per direction EIC complete in all respect including labour, tools, tackles, consumables etc.itemcode 6530EA
6666Maintenance and Testing related to Sprinkler System of tanksitemcode 66
6767Cleaning/ De-chocking of nozzles of water spray system by opening nozzle, dechocking & refitting the same as per direction of site engineer/ EIC complete in all respect including labour , tools tackles , consumable etcitemcode 671240EA
6868Flushing the sprinkler line /water curtain line by removing the end flanges of the sprinkler line segment & refitting the same after flushing, inclusive of tools tackles , nut bolts if required complete in all respect as per direction of Site Engineer/ EIC. (Rates are per segment)itemcode 6864EA
6969Maintenance related to Foam pourer systemitemcode 69
7070Foam line testing with water, opening foam maker, fixing at 180 deg. opposite direction and pouring AFFF water mix., testing the foam makers, cleaning, testing, flushing the line and fitting back in position by rotating through 180 degree.itemcode 7064EA
7171Painting of foam bladder tank/foam tank & associated piping near tank with one coat of red oxide primer & two coats of fire redsynthetic enamel paint, writing letters on the tank, piping etc. complete in all respect as per direction of EIC. (Approx area20sqm)itemcode 718EA

AI Tender Summary

OUR REF NO 28295436
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 15-07-2021
Authority
Authority Name Indian Oil Corporation Limited
Work Description Maintenance And Servicing Of Fire Fighting Equipments And Systems In Bkpl , Group A Bkpl Barauni Pump Station , Checking , Inspection , Servicing And Maintenance Of Fire Fighting System , Equipments Hydrants , Extinguishers Of All Type ( Dcp/Co2/Clean Agent ) , Water Monitor Up To The Mark As Per Oisd/Isi Standards To Provide & Best Functioning Of The Equipments Always In Best Healthy Condition Inclusive Of Periodically Cleaning , Checking /Inspection/Oiling/ Greasing Of Assemblies Such As Coupling , Nozzles , Valves , Hydrants , Extinguishers , Hose Pipes , Water Monitor , Compounds Drums , Nozzles Foam Bunch , Hose Boxes , Sand Buckets Etc , Updating The Data & Identification Tags , Recording The Status Of Checking In History Register Etc . As Directed By The Engineers In Charge With All Labors , Carriages , Materials Etc . Complete Inclusive Of All Taxes . ( Inspection And Servicing Of The Equipment/Fire Fighting Facilities Is To Be Done Periodically As Mentioned Against Each ) :- , Fire Hydrants ( Double Headed ) On Monthly Basis , Fire Extinguishers Of All Types & Capacities On Monthly Basis , Hose Boxes - Monthly Basis , Valves Of Fire Line Of All Sizes Including Contractor Supplied Grease Of Suitable Quality On Monthly Basis . , Foam /Water Monitors On Monthly Basis/Mefg , Sand Buckets With Stands With All Bucket On Monthly Basis , Taking Delivery And Refilling The Extinguishers Of Various Sizes /Capabilities Including Supply Of Dry Chemical Powder , Co2 Gas Etc Updating The Data & Identification Tags , Recording The Status Of Checking In History Register Etc As Per Isi Standard And Replacing The Same As Directed By Engineer-In-Charge . ( The Co2 Cylinder May To Be Taken Out And Delivered Back Within 10 Days After Re-Filling /Repairing . However Fire Extinguishers Co2 Are To Be Supplied /Kept Temporary In Place Of Each Fire Extinguisher For Which Taking Out For Re-Filling /Repairing Is Required ) . , Dry Chemical Powder , 0 . 2 Kg Dcp Cartridge , 2 Kg Co2 Cylinder , 6 . 8 Kg Co2 Cylinder , 2Kg Clean Agent Cylinder , Supply And Replacing The Spares /Assembles Etc Of The Fire Fighting Equipments System For All Sizes / Capacities As Per Isi Standard And Approved Make With All Labours , Materials , Carriages , Inclusive Of All Taxes Etc . Complete , Supply And Installation Of Clear Pvc , Spiral Wound Hose ( Pick-Up Tube ) Of Length 3 M Length And Dia 40 Mm With Ss Jublee Clamp For Tightningsuitable For Existing Connectors Of 750 Gpm Monitor , Hydrants Sheet Washer/Rubber Including Fitting At Site . , Hydrants Coupling Washer , Rubber Washer For Extinguisher , Co2 Safety Valves 155Kgf/Cm2 , Co2 Safety Pins , Isi Marked Discharge Pipe With Horn For 2Kg , 3 . 2Kg , 4 . 5Kg Co2extinguishers , Isi Marked Discharge Pipe With Horn For 6 . 5 Kg And 6 . 8Kg Co2 Exitinguishers . , Rubber Gasket Of Dcp Main Cap , Hose Plunger Set & Nut . , Hose Spring & Nut , Dcp Main Cap ( Gun Metal ) Cp , Dcp Plunger Pin With Spring , Dcp Plunger Top , Squeezing Grip ( Plastic ) Nozzle , Replacement Of Fire Hose Box Glass ( Front ) , Dcp Cylinder Discharge Pipe Of Sufficient Length For 10 Kg Capacity Fire Extinguisher , Dcp Cylinder Discharge Pipe Of Sufficient Length For 75 Kg Capacity Fire Extinguisher , Supply And Fitting Of Plastic Blank Cap ( As Per Is 5290 , Red Colourwith Gi Chain ) Suitable For 63 Mm Hydrant Outlet As Per Direction Of Eic , Supply And Painting With Two Coats Synthetic Enamel Paint ( Asian/Burger ) Fire Paint Including Scrapping , Cleaning , Applying One Coat Of Red Oxide Primer Cost Of All Labours , Materials , Carriage , Taxes , Letter/Number Writing , Identification Marks Etc . Complete In All Respect . , Brush Painting Of Fire Hose Boxes ( Inside And Out Side ) Including Stand With Two Coat Of Paint Including Letter/Number Writing ( Colour To Be Specified By Eic ) , Spray/Brush Painting Of Fire Bucket Stand With Its Buckets ( 4-6 Bucket Set ) Including Letter/Number Writing . , Spray Painiting Of Fire Extinguishers Of All Sizes Including Letter/Number Writing . , Spray/ Brush Painting Of Foam/Water Monitors/Double Hydrant Valves Along With Its Stand Post Including Letter/Number Writing . , Fire Siren Including Letter / Number Writing . , Others , Ppe Maintenance / Up-Keeping / Cleaning On Monthly Basis Of Various Items Like Helmets , Breathing Apparatus , Water Jel Blanket , Asbestos Blanket , Hand Gloves ( Rubber / Asbestos ) , First-Aid Box , Stretcher , Resuscicator , Safety Belt , Ear-Muffs , Fire Proximity Suits , Safety Torch , Safety Goggles Including The Cost Of Labour , Material Etc . Complete As Per Instruction Of Engineer-In-Charge . , Cleaning & Stacking Properly The Foam Containers , Updating Stock , Date Of Expiry , Date Of Manufacturing On Board And In Register , Placing Foam Containers At The Foam Monitors And Water Hydrants . , Taking Hose Pipe For Hydrotesting And Keeping It Back In Positionafter Drying /Rolling Inclusive Of All Taxes . , Air Filling In Cylinders Of Breathing Apparatus Inclusive Of All Cost With Transportation . , Hydraulic Testing Of Co2 Cylinders Inclusive Of All Taxes ( 2 To 4 . 5 Kg/Cm2 ) , Hydraulic Testing Of Co2 Cylinders Inclusive Of All Taxes ( 6 . 8 Kg/Cm2 ) , Hydraulic Testing Of Dcp Cylinders Of All Sizes Inclusive Of All Taxes , Hydraulic Testing Of Breathing Appratus Set , Supply & Pasting Of Slips On The Extinguishers Showing How To Use The Extinguishers & Date Wise Maintenance Records Of Fire Extingusher . The Good Quality Of Adehsive To Be Used On Slips For Sticking On The Extinguishers Inclusive Of All Taxes As Per Direction Of Engineer-In-Charge . , Supply And Fixing Of Wind Socks On The Position Including All Labour , Tolls And Tackels As Per Direction Of Engineer-In-Charge Inclusive Of All . , Patch Work Welding On The Firefighting/Foam Line In Case Of Leakage Including All Manpower & Materials With Tools And Tackels With Materials Required As Per Satisfaction Of The Engieer-In-Charge Upto 12X12 Size Inclusive Of All . , First Aid Box With Snake Serum , Fire Bucket , Safety Helmet , Lettering With Black Japan Paint Of Approved Brand And Manufacture . ( Note: Unit Ea Shall Mean Per Letter Per Cm Height ) . , Supply & Fitting Of Transparent Acrylic Sheet Thickness 3 Mm Of Hose Box Inclusive Of Rubber Beeding By Fixing It With Proper Adhesive Wherever Required Complete In All Respect Inclusive Of Material , Labours , Consumables Etc . ( Inclusive Of Rates For Both Glasses And Rubber Beading . , Complete Overhauling Of Hand Operated Siren Including Oiling , Greasing , Painting And Testing As Per Direction Of Eic Inclusive Of All Tools & Tackles , Transportation , Man-Power Etc , Testing Of Afff As Per Bis:4989 From Reputed Institutes Like Girda Or Any Other Approved Laboratory In All Respect By Providing Cas , Transportation , Man Power Etc . , Maintenance And Calibration Of Multigas Detector Sensor ( Lel , O2 , Co , H2s ) The Charges Includes Cost Ofcalibrating Canisters Inspection , Maintenence Of The Detectors And Issuance Of The Calibration Certificates The Cost Of Sending Lel Meterto The Party Workshop ( In India ) Will Be In The Scope Of Iocl But After Calibraiton And Completion Of Work Thecost Of Transportation Of Lel Meter To Iocl Installation Shall Be In Thescope Of Vendor . Rate Are For Calibration Of All Sensor , Make: M/S Respo Products Model: Qrae Ii , , Make: Bw ( Honeywell ) Model: Gasalertmax X , Fire Water Line , Dismantling Of Gate Valves Of Sizes Up To 8 Of Fire Hydrant Line E Etc From Bonnet Cleaning And Lapping The Gate And Refixing It With New Gasket ( Iocl Supplied ) Alongwith All Tools , Tackles , Material , Manpower Etc , Removal And Installation Of Of Faulty Gate Valves/Nrv/Glove Valve/Strainer Upto 8 Inch Size Including Transportation Either From Owners Storage Point To Workshop Or Work Sit
Basic Detail
Tender No BK/TS/900/2021-22/12
Bidding Type Tender
Location
City BKPL Barauni Pump Station
State Bihar
Key Dates
Publish Date 24 Jun 2021
Submission Date 15 Jul 2021
Open Date 16 Jul 2021
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
7F9B3BF6-9CD1-45B9-9DBA-766BF4D55DB9.html
GeMExemption.pdf
Special_Instructions_to_the_Bidders_20200717.pdf
BOQ_147512.xls
Tender.pdf
GCC.pdf
Tendernotice_1.pdf
Tender-Acceptance-Format.pdf
BSD.pdf
PPE_Matrix.pdf
FAQs-IOCL-Online-EMD.pdf
NDMAClause.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 24, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 15, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jul 16, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

7F9B3BF6-9CD1-45B9-9DBA-766BF4D55DB9.html

pdf

GeMExemption.pdf

pdf

Special_Instructions_to_the_Bidders_20200717.pdf

xls

BOQ_147512.xls

pdf

Tender.pdf

pdf

GCC.pdf

pdf

Tendernotice_1.pdf

pdf

Tender-Acceptance-Format.pdf

pdf

BSD.pdf

pdf

PPE_Matrix.pdf

pdf

FAQs-IOCL-Online-EMD.pdf

pdf

NDMAClause.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders