}

Maintenance And Servicing Of Fire Fighting Equipments And Systems In Bkpl , Group B Bkpl Allahabad Pump Station, BKPL Allahabad Pump Station-Uttar Pradesh

Indian Oil Corporation Limited-IOCL has published Maintenance And Servicing Of Fire Fighting Equipments And Systems In Bkpl , Group B Bkpl Allahabad Pump Station. Submission Date for this Tender is 15-07-2021. Coats and Jackets Tenders in BKPL Allahabad Pump Station Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

28295435
Maintenance And Servicing Of Fire Fighting Equipments And Systems In Bkpl , Group B Bkpl Allahabad Pump Station
Open Tender
Indian
Uttar Pradesh
BKPL Allahabad Pump Station
15-07-2021

Tender Details

Maintenance And Servicing Of Fire Fighting Equipments And Systems In Bkpl , Group B Bkpl Allahabad Pump Station , Checking , Inspection , Servicing And Maintenance Of Fire Fighting System , Equipments Hydrants , Extinguishers Of All Type ( Dcp/Co2/Clean Agent ) , Water Monitor Up To The Mark As Per Oisd/Isi Standards To Provide & Best Functioning Of The Equipments Always In Best Healthy Condition Inclusive Of Periodically Cleaning , Checking /Inspection/Oiling/ Greasing Of Assemblies Such As Coupling , Nozzles , Valves , Hydrants , Extinguishers , Hose Pipes , Water Monitor , Compounds Drums , Nozzles Foam Bunch , Hose Boxes , Sand Buckets Etc , Updating The Data & Identification Tags , Recording The Status Of Checking In History Register Etc . As Directed By The Engineers In Charge With All Labors , Carriages , Materials Etc . Complete Inclusive Of All Taxes . ( Inspection And Servicing Of The Equipment/Fire Fighting Facilities Is To Be Done Periodically As Mentioned Against Each ) :- , Fire Hydrants ( Double Headed ) On Monthly Basis , Fire Extinguishers Of All Types & Capacities On Monthly Basis , Hose Boxes - Monthly Basis , Valves Of Fire Line Of All Sizes Including Contractor Supplied Grease Of Suitable Quality On Monthly Basis . , Foam /Water Monitors On Monthly Basis/Mefg , Sand Buckets With Stands With All Bucket On Monthly Basis , Taking Delivery And Refilling The Extinguishers Of Various Sizes /Capabilities Including Supply Of Dry Chemical Powder , Co2 Gas Etc Updating The Data & Identification Tags , Recording The Status Of Checking In History Register Etc As Per Isi Standard And Replacing The Same As Directed By Engineer-In-Charge . ( The Co2 Cylinder May To Be Taken Out And Delivered Back Within 10 Days After Re-Filling /Repairing . However Fire Extinguishers Co2 Are To Be Supplied /Kept Temporary In Place Of Each Fire Extinguisher For Which Taking Out For Re-Filling /Repairing Is Required ) . , Dry Chemical Powder , 0 . 2 Kg Dcp Cartridge , 2 Kg Co2 Cylinder , 6 . 8 Kg Co2 Cylinder , 2Kg Clean Agent Cylinder , Supply And Replacing The Spares /Assembles Etc Of The Fire Fighting Equipments System For All Sizes / Capacities As Per Isi Standard And Approved Make With All Labours , Materials , Carriages , Inclusive Of All Taxes Etc . Complete , Supply And Installation Of Clear Pvc , Spiral Wound Hose ( Pick-Up Tube ) Of Length 3 M Length And Dia 40 Mm With Ss Jublee Clamp For Tightningsuitable For Existing Connectors Of 750 Gpm Monitor , Hydrants Sheet Washer/Rubber Including Fitting At Site . , Hydrants Coupling Washer , Rubber Washer For Extinguisher , Co2 Safety Valves 155Kgf/Cm2 , Co2 Safety Pins , Isi Marked Discharge Pipe With Horn For 2Kg , 3 . 2Kg , 4 . 5Kg Co2extinguishers , Isi Marked Discharge Pipe With Horn For 6 . 5 Kg And 6 . 8Kg Co2 Exitinguishers . , Rubber Gasket Of Dcp Main Cap , Hose Plunger Set & Nut . , Hose Spring & Nut , Dcp Main Cap ( Gun Metal ) Cp , Dcp Plunger Pin With Spring , Dcp Plunger Top , Squeezing Grip ( Plastic ) Nozzle , Replacement Of Fire Hose Box Glass ( Fron , Dcp Cylinder Discharge Pipe Of Sufficient Length For 10/9 Kg Capacity Fire Extinguisher , Dcp Cylinder Discharge Pipe Of Sufficient Length For 75/70 Kg Capacity Fire Extinguisher , Supply And Fitting Of Plastic Blank Cap ( As Per Is 5290 , Red Colourwith Gi Chain ) Suitable For 63 Mm Hydrant Outlet As Per Direction Of Eic , Supply And Painting With Two Coats Synthetic Enamel Paint ( Asian/Burger ) Fire Paint Including Scrapping , Cleaning , Applying One Coat Of Red Oxide Primer Cost Of All Labours , Materials , Carriage , Taxes , Letter/Number Writing , Identification Marks Etc . Complete In All Respect . , Brush Painting Of Fire Hose Boxes ( Inside And Out Side ) Including Stand With Two Coat Of Paint Including Letter/Number Writing ( Colour To Be Specified By Eic ) , Spray/Brush Painting Of Fire Bucket Stand With Its Buckets ( 4-6 Bucket Set ) Including Letter/Number Writing . , Spray Painiting Of Fire Extinguishers Of All Sizes Including Letter/Number Writing . , Spray/ Brush Painting Of Foam/Water Monitors/Double Hydrant Valves Along With Its Stand Post Including Letter/Number Writing . , Fire Siren Including Letter / Number Writing . , Others , Ppe Maintenance / Up-Keeping / Cleaning On Monthly Basis Of Various Items Like Helmets , Breathing Apparatus , Water Jel Blanket , Asbestos Blanket , Hand Gloves ( Rubber / Asbestos ) , First-Aid Box , Stretcher , Resuscicator , Safety Belt , Ear-Muffs , Fire Proximity Suits , Safety Torch , Safety Goggles Including The Cost Of Labour , Material Etc . Complete As Per Instruction Of Engineer-In-Charge . , Cleaning & Stacking Properly The Foam Containers , Updating Stock , Date Of Expiry , Date Of Manufacturing On Board And In Register , Placing Foam Containers At The Foam Monitors And Water Hydrants . , Taking Hose Pipe For Hydrotesting And Keeping It Back In Positionafter Drying /Rolling Inclusive Of All Taxes . , Air Filling In Cylinders Of Breathing Apparatus Inclusive Of All Cost With Transportation . , Hydraulic Testing Of Co2 Cylinders Inclusive Of All Taxes ( 2 To 4 . 5 Kg/Cm2 ) , Hydraulic Testing Of Co2 Cylinders Inclusive Of All Taxes ( 6 . 8 Kg/Cm2 ) , Hydraulic Testing Of Dcp Cylinders Of All Sizes Inclusive Of All Taxes , Hydraulic Testing Of Breathing Appratus Set , Supply & Pasting Of Slips On The Extinguishers Showing How To Use The Extinguishers & Date Wise Maintenance Records Of Fire Extingusher . The Good Quality Of Adehsive To Be Used On Slips For Sticking On The Extinguishers Inclusive Of All Taxes As Per Direction Of Engineer-In-Charge . , Supply And Fixing Of Wind Socks On The Position Including All Labour , Tolls And Tackels As Per Direction Of Engineer-In-Charge Inclusive Of All . , Patch Work Welding On The Firefighting/Foam Line In Case Of Leakage Including All Manpower & Materials With Tools And Tackels With Materials Required As Per Satisfaction Of The Engieer-In-Charge Upto 12X12 Size Inclusive Of All . , First Aid Box With Snake Serum , Fire Bucket , Safety Helmet , Lettering With Black Japan Paint , Supply & Fitting Of Transparent Acrylic Sheet Thickness 3 Mm Of Hose Box Inclusive Of Rubber Beeding By Fixing It With Proper Adhesive Wherever Required Complete In All Respect Inclusive Of Material , Lab Ours , Consumables Etc . ( Inclusive Of Rates For Both Glasses And Rubber Beading . , Complete Overhauling Of Hand Operated Siren Including Oiling , Greasing , Painting And Testing As Per Direction Of Eic Inclusive Of All Tools & Tackles , Transportation , Man-Power Etc , Testing Of Afff As Per Bis:4989 From Reputed Institutes Like Girda Or Any Other Approved Laboratory In All Respect By Providing Cas , Transportation , Man Power Etc . , Maintenance And Calibration Of Multigas Detector Sensor ( Lel , O2 , Co , H2s ) The Charges Includes Cost Of Calibrating Canisters Inspection , Maintenence Of The Detectors And Issuance Of The Calibration Certificates The Cost Of Sending Lel Meterto The Party Workshop ( In India ) Will Be In The Scope Of Iocl But After Calibraiton And Completion Of Work Thecost Of Transportation Of Lel Meter To Iocl Installation Shall Be In Thescope Of Vendor . Rate Are For Calibration Of All Sensor , Make: Crowcon , Uk , Model- Gas-Pro , Make: M/S Respo Products , Model: Qrae Ii , Make: Bw ( Honeywell ) , Model: Gasalertmax , Fire Water Line , Dismantling Of Gate Valves Of Sizes Up To 8 Of Fire Hydrant Line E Etc From Bonnet Cleaning And Lapping The Gate And Refixing It With New Gasket ( Iocl Supplied ) Alongwith All Tools , Tackles , Material , Manpower Etc , Removal Or Installation Of Of Faulty Gate Valves/Nrv/Glove Valve/Strainer Upto 8 Inch Size Including Transportation Either From Owners Storage Point To Workshop Or Work Site Including Tools Tackles , Labour , Etc As Per Direc

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Maintenance & servicing of fire fighting equipments & systems in BKPL, Group B - BKPL Allahabad Pump Station
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Checking, Inspection, Servicing and Maintenance of Fire Fighting System, equipments hydrants, extinguishers of all type(DCP/CO2/Clean Agent), Water monitor up to the mark as per OISD/ISI Standards to provide & best functioning of the equipments always in best healthy condition inclusive of periodically cleaning, checking /inspection/oiling/ greasing of assemblies such as coupling, nozzles, valves, hydrants, extinguishers, hose pipes, water monitor, compounds drums, nozzles foam bunch, hose boxes, sand buckets etc, updating the data & identification tags, recording the status of checking in history register etc. as directed by the engineers in charge with all labors, carriages, materials etc. complete inclusive of all taxes. (inspection and servicing of the equipment/Fire Fighting facilities is to be done periodically as mentioned against each):- itemcode 1
2 2 Fire Hydrants (double headed) on Monthly Basis itemcode 2 288 EA
3 3 Fire Extinguishers of all types & capacities on Monthly Basis itemcode 3 2760 EA
4 4 Hose Boxes - Monthly Basis itemcode 4 288 EA
5 5 Valves of Fire line of all sizes including Contractor supplied grease of suitable quality on Monthly Basis. itemcode 5 984 EA
6 6 Foam /Water Monitors on Monthly Basis/MEFG itemcode 6 192 EA
7 7 Sand buckets with stands with all bucket on Monthly Basis itemcode 7 624 EA
8 8 Taking delivery and refilling the extinguishers of various sizes /capabilities including supply of dry chemical powder, CO2 gas etc updating the data & identification tags, recording the status of checking in history register etc as per ISI standard and replacing the same as directed by Engineer-in-Charge. (The CO2 cylinder may to be taken out and delivered back within 10 days after re-filling /repairing. However Fire extinguishers CO2 are to be supplied /Kept temporary in place of each fire extinguisher for which taking out for re-filling /repairing is required). itemcode 8
9 9 Dry Chemical Powder itemcode 9 940 KG
10 10 0.2 kg DCP Cartridge itemcode 10 64 EA
11 11 2 kg CO2 Cylinder itemcode 11 28 EA
12 12 6.8 kg CO2 Cylinder itemcode 12 10 EA
13 13 2Kg Clean Agent Cylinder itemcode 13 8 EA
14 14 Supply and replacing the spares /assembles etc of the Fire Fighting equipments system for all sizes / Capacities as per ISI standard and approved make with all labours, materials, carriages, inclusive of all taxes etc. complete itemcode 14
15 15 Supply and installation of Clear PVC, Spiral wound hose (pick-up tube)of length 3 m length and dia 40 mm with SS jublee clamp for tightningsuitable for existing connectors of 750 GPM Monitor itemcode 15 12 EA
16 16 Hydrants Sheet Washer/Rubber including fitting at site. itemcode 16 96 EA
17 17 Hydrants coupling washer itemcode 17 96 EA
18 18 Rubber washer for Extinguisher itemcode 18 188 EA
19 19 CO2 Safety valves 155kgf/cm2 itemcode 19 10 EA
20 20 CO2 Safety pins itemcode 20 118 EA
21 21 ISI marked Discharge pipe with Horn for 2Kg,3.2Kg,4.5Kg CO2extinguishers itemcode 21 68 EA
22 22 ISI marked Discharge Pipe with horn for 6.5 Kg and 6.8Kg CO2 Exitinguishers. itemcode 22 30 EA
23 23 Rubber Gasket OF DCP Main Cap itemcode 23 104 EA
24 24 Hose Plunger Set & Nut. itemcode 24 48 EA
25 25 Hose Spring & nut itemcode 25 48 EA
26 26 DCP main Cap (gun metal) CP itemcode 26 10 EA
27 27 DCP Plunger Pin with Spring itemcode 27 20 EA
28 28 DCP Plunger top itemcode 28 20 EA
29 29 Squeezing grip (Plastic) nozzle itemcode 29 30 EA
30 30 Replacement of fire hose box glass (fron itemcode 30 48 EA
31 31 DCP cylinder discharge pipe of sufficient length for 10/9 Kg capacity Fire Extinguisher itemcode 31 20 EA
32 32 DCP cylinder discharge pipe of sufficient length for 75/70 Kg capacity Fire Extinguisher itemcode 32 14 EA
33 33 Supply and fitting of plastic blank cap (as per IS 5290 , red colourwith GI chain) suitable for 63 mm hydrant outlet as per direction of EIC itemcode 33 30 EA
34 34 Supply and painting with two coats synthetic enamel paint ( Asian/Burger) fire paint including scrapping, cleaning, applying one coat of red oxide primer cost of all labours, materials, carriage, taxes, letter/number writing, identification marks etc. complete in all respect. itemcode 34
35 35 Brush painting of fire hose boxes ( Inside and out side) including stand with two coat of Paint including letter/number writing ( Colour to be specified by EIC) itemcode 35 24 EA
36 36 Spray/Brush painting of fire bucket stand with its buckets (4-6 Bucket set) including letter/number writing. itemcode 36 54 EA
37 37 Spray painiting of Fire extinguishers of all sizes including letter/number writing. itemcode 37 250 EA
38 38 Spray/ brush painting of Foam/water monitors/Double hydrant valves along with its stand post including letter/number writing. itemcode 38 42 EA
39 39 Fire Siren including letter / number writing. itemcode 39 12 EA
40 40 OTHERS itemcode 40
41 41 PPE maintenance / up-keeping / cleaning on Monthly Basis of various items like helmets, Breathing apparatus, Water jel blanket, Asbestos blanket,hand gloves (rubber / asbestos), first-aid box, stretcher, resuscicator, safety belt, ear-muffs, fire proximity suits, safety torch, safety goggles including the cost of labour, material etc. complete as per instruction of Engineer-in-Charge. itemcode 41 24 MON
42 42 Cleaning & stacking properly the foam containers, updating stock, date of expiry, date of manufacturing on board and in register, placing foam containers at the foam monitors and water hydrants. itemcode 42 24 MON
43 43 Taking hose pipe for hydrotesting and keeping it back in positionafter drying /rolling inclusive of all taxes." itemcode 43 112 EA
44 44 Air filling in cylinders of Breathing Apparatus inclusive of all cost with transportation. itemcode 44 16 EA
45 45 Hydraulic testing of CO2 Cylinders inclusive of all taxes ( 2 to 4.5 Kg/cm2) itemcode 45 24 EA
46 46 Hydraulic testing of CO2 Cylinders inclusive of all taxes ( 6.8 Kg/cm2) itemcode 46 12 EA
47 47 Hydraulic testing of DCP Cylinders of all sizes inclusive of all taxes itemcode 47 20 EA
48 48 Hydraulic testing of Breathing Appratus Set itemcode 48 16 EA
49 49 Supply & pasting of slips on the extinguishers showing how to use the extinguishers & date wise maintenance records of Fire Extingusher. The good quality of adehsive to be used on slips for sticking on the extinguishers inclusive of all taxes as per direction of Engineer-in-Charge. itemcode 49 250 EA
50 50 Supply and fixing of wind socks on the position including all labour, tolls and tackels as per direction of Engineer-in-Charge inclusive of all. itemcode 50 24 EA
51 51 Patch work welding on the Firefighting/Foam Line in case of leakage including all manpower & materials with tools and tackels with materials required as per satisfaction of the Engieer-In-Charge upto 12"x12" size inclusive of all. itemcode 51 10 EA
52 52 First Aid Box with Snake serum itemcode 52 10 EA
53 53 Fire Bucket itemcode 53 10 EA
54 54 Safety Helmet itemcode 54 160 EA
55 55 Lettering with Black Japan paint itemcode 55 20000 EA
56 56 Supply & Fitting of transparent acrylic sheet thickness 3 mm of hose box inclusive of rubber beeding by fixing it with proper adhesive wherever required complete in all respect inclusive of material, lab ours, consumables etc. (inclusive of rates for both glasses and rubber beading. itemcode 56 20 EA
57 57 Complete Overhauling of Hand operated Siren including oiling,greasing ,painting and testing as per direction of EIC inclusive of all tools & tackles,transportation ,man-power etc itemcode 57 24 EA
58 58 Testing of AFFF as per BIS:4989 from reputed institutes like GIRDA or any other approved laboratory in all respect by providing cas ,transportation, man power etc. itemcode 58 4 EA
59 59 Maintenance and Calibration of Multigas Detector Sensor (LEL, O2, CO, H2S) The charges includes cost of calibrating canisters inspection , maintenence of the detectors and issuance of the calibration certificates The cost of Sending LEL meterto the party workshop (in india) will be in the Scope of IOCL but after calibraiton and completion of work thecost of transportation of LEL meter to IOCL installation shall be in thescope of Vendor. Rate are for calibration of all sensor itemcode 59
60 60 Make: CROWCON, UK, Model- Gas-Pro itemcode 60 4 EA
61 61 Make: M/s Respo Products, Model: QRAE II itemcode 61 8 EA
62 62 Make: BW(Honeywell), Model: GasAlertMax itemcode 62 8 EA
63 63 FIRE WATER LINE itemcode 63
64 64 Dismantling of gate valves of sizes up to 8" of fire hydrant line e etc from bonnet cleaning and lapping the gate and refixing it with new gasket (iocl supplied) alongwith all tools, tackles, material, manpower etc itemcode 64 10 EA
65 65 Removal or Installation of of faulty Gate valves/NRV/Glove Valve/Strainer upto 8 inch size including transportation either from owners storage point to workshop or work site including tools tackles, labour, etc as per directions of engineer in charge. For removing of valves it may be required to cut jammed stud & bolts etc.) itemcode 65 8 EA
66 66 4",6" and 8 " gate valve stem gland packing by supplying and fitting of 100% PTFE (zero leak ) material as per direction EIC complete in all respect including labour, tools, tackles, consumables etc. itemcode 66 20 EA
67 67 Maintenance and Testing RELATED TO SPRINKLER SYSTEM itemcode 67
68 68 Cleaning/ De-chocking of nozzles of water spray system at water curtain system at Control Room, PMCC building, Delivery shed by opening nozzle, dechocking & refitting the same as per direction of site engineer/ EIC complete in all respect including labour , tools tackles , consumable etc itemcode 68 192 EA
69 69 Flushing the sprinkler line /water curtain line by removing the end flanges of the sprinkler line segment & refitting the same after flushing, inclusive of tools tackles , nut bolts if required complete in all respect as per direction of Site Engineer/ EIC. (Rates are per segment) itemcode 69 72 EA
70 70 Maintenance related to Foam Flooding System itemcode 70
71 71 Cleaning of all foam sprinkler nozzles provided in main line engine shed by removing the nozzles, flushing the system,refiting the nozzle & cleaning the Y type strainer near deluge valve complete in all respect inclusive of tools,tackles,labours,consumables like Teflon tape,etc ( Rate includes all 16 Nos Nozzle in the engine shed) itemcode 71 8 EA
72 72 Maintenance of foam deluge valve of Mainline pumping shed fixed foam flooding system on half yearly basis itemcode 72 4 EA
73 73 Servicing of solenoid valve of deluge valve of foam flooding system/sprinkler system on half yearly basis itemcode 73 4 EA
74 74 Painting of foam bladder tank of capacity 2.5 KL & associated pipingnear tank with one coat of red oxide primer & two coats of fire redsynthetic enamel paint, writing letters on the tank, piping etc. complete in all respect as per direction of EIC. (Approx area20sqm) itemcode 74 2 EA
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail