Petroleum and Natural Gas Boards / Undertakings / PSU Closing in 0 days TDR #28295435

Maintenance And Servicing Of Fire Fighting Equipments And Systems In Bkpl , Group B Bkpl Allahabad Pump Station

Issued by Boards / Undertakings / PSU · BKPL Allahabad Pump Station, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
15 Jul 2021
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
BKPL Allahabad Pump Station → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Maintenance And Servicing Of Fire Fighting Equipments And Systems In Bkpl , Group B Bkpl Allahabad Pump Station , Checking , Inspection , Servicing And Maintenance Of Fire Fighting System , Equipments Hydrants , Extinguishers Of All Type ( Dcp/Co2/Clean Agent ) , Water Monitor Up To The Mark As Per Oisd/Isi Standards To Provide & Best Functioning Of The Equipments Always In Best Healthy Condition Inclusive Of Periodically Cleaning , Checking /Inspection/Oiling/ Greasing Of Assemblies Such As Coupling , Nozzles , Valves , Hydrants , Extinguishers , Hose Pipes , Water Monitor , Compounds Drums , Nozzles Foam Bunch , Hose Boxes , Sand Buckets Etc , Updating The Data & Identification Tags , Recording The Status Of Checking In History Register Etc . As Directed By The Engineers In Charge With All Labors , Carriages , Materials Etc . Complete Inclusive Of All Taxes . ( Inspection And Servicing Of The Equipment/Fire Fighting Facilities Is To Be Done Periodically As Mentioned Against Each ) :- , Fire Hydrants ( Double Headed ) On Monthly Basis , Fire Extinguishers Of All Types & Capacities On Monthly Basis , Hose Boxes - Monthly Basis , Valves Of Fire Line Of All Sizes Including Contractor Supplied Grease Of Suitable Quality On Monthly Basis . , Foam /Water Monitors On Monthly Basis/Mefg , Sand Buckets With Stands With All Bucket On Monthly Basis , Taking Delivery And Refilling The Extinguishers Of Various Sizes /Capabilities Including Supply Of Dry Chemical Powder , Co2 Gas Etc Updating The Data & Identification Tags , Recording The Status Of Checking In History Register Etc As Per Isi Standard And Replacing The Same As Directed By Engineer-In-Charge . ( The Co2 Cylinder May To Be Taken Out And Delivered Back Within 10 Days After Re-Filling /Repairing . However Fire Extinguishers Co2 Are To Be Supplied /Kept Temporary In Place Of Each Fire Extinguisher For Which Taking Out For Re-Filling /Repairing Is Required ) . , Dry Chemical Powder , 0 . 2 Kg Dcp Cartridge , 2 Kg Co2 Cylinder , 6 . 8 Kg Co2 Cylinder , 2Kg Clean Agent Cylinder , Supply And Replacing The Spares /Assembles Etc Of The Fire Fighting Equipments System For All Sizes / Capacities As Per Isi Standard And Approved Make With All Labours , Materials , Carriages , Inclusive Of All Taxes Etc . Complete , Supply And Installation Of Clear Pvc , Spiral Wound Hose ( Pick-Up Tube ) Of Length 3 M Length And Dia 40 Mm With Ss Jublee Clamp For Tightningsuitable For Existing Connectors Of 750 Gpm Monitor , Hydrants Sheet Washer/Rubber Including Fitting At Site . , Hydrants Coupling Washer , Rubber Washer For Extinguisher , Co2 Safety Valves 155Kgf/Cm2 , Co2 Safety Pins , Isi Marked Discharge Pipe With Horn For 2Kg , 3 . 2Kg , 4 . 5Kg Co2extinguishers , Isi Marked Discharge Pipe With Horn For 6 . 5 Kg And 6 . 8Kg Co2 Exitinguishers . , Rubber Gasket Of Dcp Main Cap , Hose Plunger Set & Nut . , Hose Spring & Nut , Dcp Main Cap ( Gun Metal ) Cp , Dcp Plunger Pin With Spring , Dcp Plunger Top , Squeezing Grip ( Plastic ) Nozzle , Replacement Of Fire Hose Box Glass ( Fron , Dcp Cylinder Discharge Pipe Of Sufficient Length For 10/9 Kg Capacity Fire Extinguisher , Dcp Cylinder Discharge Pipe Of Sufficient Length For 75/70 Kg Capacity Fire Extinguisher , Supply And Fitting Of Plastic Blank Cap ( As Per Is 5290 , Red Colourwith Gi Chain ) Suitable For 63 Mm Hydrant Outlet As Per Direction Of Eic , Supply And Painting With Two Coats Synthetic Enamel Paint ( Asian/Burger ) Fire Paint Including Scrapping , Cleaning , Applying One Coat Of Red Oxide Primer Cost Of All Labours , Materials , Carriage , Taxes , Letter/Number Writing , Identification Marks Etc . Complete In All Respect . , Brush Painting Of Fire Hose Boxes ( Inside And Out Side ) Including Stand With Two Coat Of Paint Including Letter/Number Writing ( Colour To Be Specified By Eic ) , Spray/Brush Painting Of Fire Bucket Stand With Its Buckets ( 4-6 Bucket Set ) Including Letter/Number Writing . , Spray Painiting Of Fire Extinguishers Of All Sizes Including Letter/Number Writing . , Spray/ Brush Painting Of Foam/Water Monitors/Double Hydrant Valves Along With Its Stand Post Including Letter/Number Writing . , Fire Siren Including Letter / Number Writing . , Others , Ppe Maintenance / Up-Keeping / Cleaning On Monthly Basis Of Various Items Like Helmets , Breathing Apparatus , Water Jel Blanket , Asbestos Blanket , Hand Gloves ( Rubber / Asbestos ) , First-Aid Box , Stretcher , Resuscicator , Safety Belt , Ear-Muffs , Fire Proximity Suits , Safety Torch , Safety Goggles Including The Cost Of Labour , Material Etc . Complete As Per Instruction Of Engineer-In-Charge . , Cleaning & Stacking Properly The Foam Containers , Updating Stock , Date Of Expiry , Date Of Manufacturing On Board And In Register , Placing Foam Containers At The Foam Monitors And Water Hydrants . , Taking Hose Pipe For Hydrotesting And Keeping It Back In Positionafter Drying /Rolling Inclusive Of All Taxes . , Air Filling In Cylinders Of Breathing Apparatus Inclusive Of All Cost With Transportation . , Hydraulic Testing Of Co2 Cylinders Inclusive Of All Taxes ( 2 To 4 . 5 Kg/Cm2 ) , Hydraulic Testing Of Co2 Cylinders Inclusive Of All Taxes ( 6 . 8 Kg/Cm2 ) , Hydraulic Testing Of Dcp Cylinders Of All Sizes Inclusive Of All Taxes , Hydraulic Testing Of Breathing Appratus Set , Supply & Pasting Of Slips On The Extinguishers Showing How To Use The Extinguishers & Date Wise Maintenance Records Of Fire Extingusher . The Good Quality Of Adehsive To Be Used On Slips For Sticking On The Extinguishers Inclusive Of All Taxes As Per Direction Of Engineer-In-Charge . , Supply And Fixing Of Wind Socks On The Position Including All Labour , Tolls And Tackels As Per Direction Of Engineer-In-Charge Inclusive Of All . , Patch Work Welding On The Firefighting/Foam Line In Case Of Leakage Including All Manpower & Materials With Tools And Tackels With Materials Required As Per Satisfaction Of The Engieer-In-Charge Upto 12X12 Size Inclusive Of All . , First Aid Box With Snake Serum , Fire Bucket , Safety Helmet , Lettering With Black Japan Paint , Supply & Fitting Of Transparent Acrylic Sheet Thickness 3 Mm Of Hose Box Inclusive Of Rubber Beeding By Fixing It With Proper Adhesive Wherever Required Complete In All Respect Inclusive Of Material , Lab Ours , Consumables Etc . ( Inclusive Of Rates For Both Glasses And Rubber Beading . , Complete Overhauling Of Hand Operated Siren Including Oiling , Greasing , Painting And Testing As Per Direction Of Eic Inclusive Of All Tools & Tackles , Transportation , Man-Power Etc , Testing Of Afff As Per Bis:4989 From Reputed Institutes Like Girda Or Any Other Approved Laboratory In All Respect By Providing Cas , Transportation , Man Power Etc . , Maintenance And Calibration Of Multigas Detector Sensor ( Lel , O2 , Co , H2s ) The Charges Includes Cost Of Calibrating Canisters Inspection , Maintenence Of The Detectors And Issuance Of The Calibration Certificates The Cost Of Sending Lel Meterto The Party Workshop ( In India ) Will Be In The Scope Of Iocl But After Calibraiton And Completion Of Work Thecost Of Transportation Of Lel Meter To Iocl Installation Shall Be In Thescope Of Vendor . Rate Are For Calibration Of All Sensor , Make: Crowcon , Uk , Model- Gas-Pro , Make: M/S Respo Products , Model: Qrae Ii , Make: Bw ( Honeywell ) , Model: Gasalertmax , Fire Water Line , Dismantling Of Gate Valves Of Sizes Up To 8 Of Fire Hydrant Line E Etc From Bonnet Cleaning And Lapping The Gate And Refixing It With New Gasket ( Iocl Supplied ) Alongwith All Tools , Tackles , Material , Manpower Etc , Removal Or Installation Of Of Faulty Gate Valves/Nrv/Glove Valve/Strainer Upto 8 Inch Size Including Transportation Either From Owners Storage Point To Workshop Or Work Site Including Tools Tackles , Labour , Etc As Per Direc

BOQ

Name of Work: Maintenance & servicing of fire fighting equipments & systems in BKPL, Group B - BKPL Allahabad Pump Station
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Checking, Inspection, Servicing and Maintenance of Fire Fighting System, equipments hydrants, extinguishers of all type(DCP/CO2/Clean Agent), Water monitor up to the mark as per OISD/ISI Standards to provide & best functioning of the equipments always in best healthy condition inclusive of periodically cleaning, checking /inspection/oiling/ greasing of assemblies such as coupling, nozzles, valves, hydrants, extinguishers, hose pipes, water monitor, compounds drums, nozzles foam bunch, hose boxes, sand buckets etc, updating the data & identification tags, recording the status of checking in history register etc. as directed by the engineers in charge with all labors, carriages, materials etc. complete inclusive of all taxes. (inspection and servicing of the equipment/Fire Fighting facilities is to be done periodically as mentioned against each):-itemcode 1
22Fire Hydrants (double headed) on Monthly Basisitemcode 2288EA
33Fire Extinguishers of all types & capacities on Monthly Basisitemcode 32760EA
44Hose Boxes - Monthly Basisitemcode 4288EA
55Valves of Fire line of all sizes including Contractor supplied grease of suitable quality on Monthly Basis.itemcode 5984EA
66Foam /Water Monitors on Monthly Basis/MEFGitemcode 6192EA
77Sand buckets with stands with all bucket on Monthly Basisitemcode 7624EA
88Taking delivery and refilling the extinguishers of various sizes /capabilities including supply of dry chemical powder, CO2 gas etc updating the data & identification tags, recording the status of checking in history register etc as per ISI standard and replacing the same as directed by Engineer-in-Charge. (The CO2 cylinder may to be taken out and delivered back within 10 days after re-filling /repairing. However Fire extinguishers CO2 are to be supplied /Kept temporary in place of each fire extinguisher for which taking out for re-filling /repairing is required).itemcode 8
99Dry Chemical Powderitemcode 9940KG
10100.2 kg DCP Cartridgeitemcode 1064EA
11112 kg CO2 Cylinderitemcode 1128EA
12126.8 kg CO2 Cylinderitemcode 1210EA
13132Kg Clean Agent Cylinderitemcode 138EA
1414Supply and replacing the spares /assembles etc of the Fire Fighting equipments system for all sizes / Capacities as per ISI standard and approved make with all labours, materials, carriages, inclusive of all taxes etc. completeitemcode 14
1515Supply and installation of Clear PVC, Spiral wound hose (pick-up tube)of length 3 m length and dia 40 mm with SS jublee clamp for tightningsuitable for existing connectors of 750 GPM Monitoritemcode 1512EA
1616Hydrants Sheet Washer/Rubber including fitting at site.itemcode 1696EA
1717Hydrants coupling washeritemcode 1796EA
1818Rubber washer for Extinguisheritemcode 18188EA
1919CO2 Safety valves 155kgf/cm2itemcode 1910EA
2020CO2 Safety pinsitemcode 20118EA
2121ISI marked Discharge pipe with Horn for 2Kg,3.2Kg,4.5Kg CO2extinguishersitemcode 2168EA
2222ISI marked Discharge Pipe with horn for 6.5 Kg and 6.8Kg CO2 Exitinguishers.itemcode 2230EA
2323Rubber Gasket OF DCP Main Capitemcode 23104EA
2424Hose Plunger Set & Nut.itemcode 2448EA
2525Hose Spring & nutitemcode 2548EA
2626DCP main Cap (gun metal) CPitemcode 2610EA
2727DCP Plunger Pin with Springitemcode 2720EA
2828DCP Plunger topitemcode 2820EA
2929Squeezing grip (Plastic) nozzleitemcode 2930EA
3030Replacement of fire hose box glass (fronitemcode 3048EA
3131DCP cylinder discharge pipe of sufficient length for 10/9 Kg capacity Fire Extinguisheritemcode 3120EA
3232DCP cylinder discharge pipe of sufficient length for 75/70 Kg capacity Fire Extinguisheritemcode 3214EA
3333Supply and fitting of plastic blank cap (as per IS 5290 , red colourwith GI chain) suitable for 63 mm hydrant outlet as per direction of EICitemcode 3330EA
3434Supply and painting with two coats synthetic enamel paint ( Asian/Burger) fire paint including scrapping, cleaning, applying one coat of red oxide primer cost of all labours, materials, carriage, taxes, letter/number writing, identification marks etc. complete in all respect.itemcode 34
3535Brush painting of fire hose boxes ( Inside and out side) including stand with two coat of Paint including letter/number writing ( Colour to be specified by EIC)itemcode 3524EA
3636Spray/Brush painting of fire bucket stand with its buckets (4-6 Bucket set) including letter/number writing.itemcode 3654EA
3737Spray painiting of Fire extinguishers of all sizes including letter/number writing.itemcode 37250EA
3838Spray/ brush painting of Foam/water monitors/Double hydrant valves along with its stand post including letter/number writing.itemcode 3842EA
3939Fire Siren including letter / number writing.itemcode 3912EA
4040OTHERSitemcode 40
4141PPE maintenance / up-keeping / cleaning on Monthly Basis of various items like helmets, Breathing apparatus, Water jel blanket, Asbestos blanket,hand gloves (rubber / asbestos), first-aid box, stretcher, resuscicator, safety belt, ear-muffs, fire proximity suits, safety torch, safety goggles including the cost of labour, material etc. complete as per instruction of Engineer-in-Charge.itemcode 4124MON
4242Cleaning & stacking properly the foam containers, updating stock, date of expiry, date of manufacturing on board and in register, placing foam containers at the foam monitors and water hydrants.itemcode 4224MON
4343Taking hose pipe for hydrotesting and keeping it back in positionafter drying /rolling inclusive of all taxes.\"itemcode 43112EA
4444Air filling in cylinders of Breathing Apparatus inclusive of all cost with transportation.itemcode 4416EA
4545Hydraulic testing of CO2 Cylinders inclusive of all taxes ( 2 to 4.5 Kg/cm2)itemcode 4524EA
4646Hydraulic testing of CO2 Cylinders inclusive of all taxes ( 6.8 Kg/cm2)itemcode 4612EA
4747Hydraulic testing of DCP Cylinders of all sizes inclusive of all taxesitemcode 4720EA
4848Hydraulic testing of Breathing Appratus Setitemcode 4816EA
4949Supply & pasting of slips on the extinguishers showing how to use the extinguishers & date wise maintenance records of Fire Extingusher. The good quality of adehsive to be used on slips for sticking on the extinguishers inclusive of all taxes as per direction of Engineer-in-Charge.itemcode 49250EA
5050Supply and fixing of wind socks on the position including all labour, tolls and tackels as per direction of Engineer-in-Charge inclusive of all.itemcode 5024EA
5151Patch work welding on the Firefighting/Foam Line in case of leakage including all manpower & materials with tools and tackels with materials required as per satisfaction of the Engieer-In-Charge upto 12\"x12\" size inclusive of all.itemcode 5110EA
5252First Aid Box with Snake serumitemcode 5210EA
5353Fire Bucketitemcode 5310EA
5454Safety Helmetitemcode 54160EA
5555Lettering with Black Japan paintitemcode 5520000EA
5656Supply & Fitting of transparent acrylic sheet thickness 3 mm of hose box inclusive of rubber beeding by fixing it with proper adhesive wherever required complete in all respect inclusive of material, lab ours, consumables etc. (inclusive of rates for both glasses and rubber beading.itemcode 5620EA
5757Complete Overhauling of Hand operated Siren including oiling,greasing ,painting and testing as per direction of EIC inclusive of all tools & tackles,transportation ,man-power etcitemcode 5724EA
5858Testing of AFFF as per BIS:4989 from reputed institutes like GIRDA or any other approved laboratory in all respect by providing cas ,transportation, man power etc.itemcode 584EA
5959Maintenance and Calibration of Multigas Detector Sensor (LEL, O2, CO, H2S) The charges includes cost of calibrating canisters inspection , maintenence of the detectors and issuance of the calibration certificates The cost of Sending LEL meterto the party workshop (in india) will be in the Scope of IOCL but after calibraiton and completion of work thecost of transportation of LEL meter to IOCL installation shall be in thescope of Vendor. Rate are for calibration of all sensoritemcode 59
6060Make: CROWCON, UK, Model- Gas-Proitemcode 604EA
6161Make: M/s Respo Products, Model: QRAE IIitemcode 618EA
6262Make: BW(Honeywell), Model: GasAlertMaxitemcode 628EA
6363FIRE WATER LINEitemcode 63
6464Dismantling of gate valves of sizes up to 8\" of fire hydrant line e etc from bonnet cleaning and lapping the gate and refixing it with new gasket (iocl supplied) alongwith all tools, tackles, material, manpower etcitemcode 6410EA
6565Removal or Installation of of faulty Gate valves/NRV/Glove Valve/Strainer upto 8 inch size including transportation either from owners storage point to workshop or work site including tools tackles, labour, etc as per directions of engineer in charge. For removing of valves it may be required to cut jammed stud & bolts etc.)itemcode 658EA
66664\",6\" and 8 \" gate valve stem gland packing by supplying and fitting of 100% PTFE (zero leak ) material as per direction EIC complete in all respect including labour, tools, tackles, consumables etc.itemcode 6620EA
6767Maintenance and Testing RELATED TO SPRINKLER SYSTEMitemcode 67
6868Cleaning/ De-chocking of nozzles of water spray system at water curtain system at Control Room, PMCC building, Delivery shed by opening nozzle, dechocking & refitting the same as per direction of site engineer/ EIC complete in all respect including labour , tools tackles , consumable etcitemcode 68192EA
6969Flushing the sprinkler line /water curtain line by removing the end flanges of the sprinkler line segment & refitting the same after flushing, inclusive of tools tackles , nut bolts if required complete in all respect as per direction of Site Engineer/ EIC. (Rates are per segment)itemcode 6972EA
7070Maintenance related to Foam Flooding Systemitemcode 70
7171Cleaning of all foam sprinkler nozzles provided in main line engine shed by removing the nozzles, flushing the system,refiting the nozzle & cleaning the Y type strainer near deluge valve complete in all respect inclusive of tools,tackles,labours,consumables like Teflon tape,etc ( Rate includes all 16 Nos Nozzle in the engine shed)itemcode 718EA
7272Maintenance of foam deluge valve of Mainline pumping shed fixed foam flooding system on half yearly basisitemcode 724EA
7373Servicing of solenoid valve of deluge valve of foam flooding system/sprinkler system on half yearly basisitemcode 734EA
7474Painting of foam bladder tank of capacity 2.5 KL & associated pipingnear tank with one coat of red oxide primer & two coats of fire redsynthetic enamel paint, writing letters on the tank, piping etc. complete in all respect as per direction of EIC. (Approx area20sqm)itemcode 742EA

AI Tender Summary

OUR REF NO 28295435
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 15-07-2021
Authority
Authority Name Indian Oil Corporation Limited
Work Description Maintenance And Servicing Of Fire Fighting Equipments And Systems In Bkpl , Group B Bkpl Allahabad Pump Station , Checking , Inspection , Servicing And Maintenance Of Fire Fighting System , Equipments Hydrants , Extinguishers Of All Type ( Dcp/Co2/Clean Agent ) , Water Monitor Up To The Mark As Per Oisd/Isi Standards To Provide & Best Functioning Of The Equipments Always In Best Healthy Condition Inclusive Of Periodically Cleaning , Checking /Inspection/Oiling/ Greasing Of Assemblies Such As Coupling , Nozzles , Valves , Hydrants , Extinguishers , Hose Pipes , Water Monitor , Compounds Drums , Nozzles Foam Bunch , Hose Boxes , Sand Buckets Etc , Updating The Data & Identification Tags , Recording The Status Of Checking In History Register Etc . As Directed By The Engineers In Charge With All Labors , Carriages , Materials Etc . Complete Inclusive Of All Taxes . ( Inspection And Servicing Of The Equipment/Fire Fighting Facilities Is To Be Done Periodically As Mentioned Against Each ) :- , Fire Hydrants ( Double Headed ) On Monthly Basis , Fire Extinguishers Of All Types & Capacities On Monthly Basis , Hose Boxes - Monthly Basis , Valves Of Fire Line Of All Sizes Including Contractor Supplied Grease Of Suitable Quality On Monthly Basis . , Foam /Water Monitors On Monthly Basis/Mefg , Sand Buckets With Stands With All Bucket On Monthly Basis , Taking Delivery And Refilling The Extinguishers Of Various Sizes /Capabilities Including Supply Of Dry Chemical Powder , Co2 Gas Etc Updating The Data & Identification Tags , Recording The Status Of Checking In History Register Etc As Per Isi Standard And Replacing The Same As Directed By Engineer-In-Charge . ( The Co2 Cylinder May To Be Taken Out And Delivered Back Within 10 Days After Re-Filling /Repairing . However Fire Extinguishers Co2 Are To Be Supplied /Kept Temporary In Place Of Each Fire Extinguisher For Which Taking Out For Re-Filling /Repairing Is Required ) . , Dry Chemical Powder , 0 . 2 Kg Dcp Cartridge , 2 Kg Co2 Cylinder , 6 . 8 Kg Co2 Cylinder , 2Kg Clean Agent Cylinder , Supply And Replacing The Spares /Assembles Etc Of The Fire Fighting Equipments System For All Sizes / Capacities As Per Isi Standard And Approved Make With All Labours , Materials , Carriages , Inclusive Of All Taxes Etc . Complete , Supply And Installation Of Clear Pvc , Spiral Wound Hose ( Pick-Up Tube ) Of Length 3 M Length And Dia 40 Mm With Ss Jublee Clamp For Tightningsuitable For Existing Connectors Of 750 Gpm Monitor , Hydrants Sheet Washer/Rubber Including Fitting At Site . , Hydrants Coupling Washer , Rubber Washer For Extinguisher , Co2 Safety Valves 155Kgf/Cm2 , Co2 Safety Pins , Isi Marked Discharge Pipe With Horn For 2Kg , 3 . 2Kg , 4 . 5Kg Co2extinguishers , Isi Marked Discharge Pipe With Horn For 6 . 5 Kg And 6 . 8Kg Co2 Exitinguishers . , Rubber Gasket Of Dcp Main Cap , Hose Plunger Set & Nut . , Hose Spring & Nut , Dcp Main Cap ( Gun Metal ) Cp , Dcp Plunger Pin With Spring , Dcp Plunger Top , Squeezing Grip ( Plastic ) Nozzle , Replacement Of Fire Hose Box Glass ( Fron , Dcp Cylinder Discharge Pipe Of Sufficient Length For 10/9 Kg Capacity Fire Extinguisher , Dcp Cylinder Discharge Pipe Of Sufficient Length For 75/70 Kg Capacity Fire Extinguisher , Supply And Fitting Of Plastic Blank Cap ( As Per Is 5290 , Red Colourwith Gi Chain ) Suitable For 63 Mm Hydrant Outlet As Per Direction Of Eic , Supply And Painting With Two Coats Synthetic Enamel Paint ( Asian/Burger ) Fire Paint Including Scrapping , Cleaning , Applying One Coat Of Red Oxide Primer Cost Of All Labours , Materials , Carriage , Taxes , Letter/Number Writing , Identification Marks Etc . Complete In All Respect . , Brush Painting Of Fire Hose Boxes ( Inside And Out Side ) Including Stand With Two Coat Of Paint Including Letter/Number Writing ( Colour To Be Specified By Eic ) , Spray/Brush Painting Of Fire Bucket Stand With Its Buckets ( 4-6 Bucket Set ) Including Letter/Number Writing . , Spray Painiting Of Fire Extinguishers Of All Sizes Including Letter/Number Writing . , Spray/ Brush Painting Of Foam/Water Monitors/Double Hydrant Valves Along With Its Stand Post Including Letter/Number Writing . , Fire Siren Including Letter / Number Writing . , Others , Ppe Maintenance / Up-Keeping / Cleaning On Monthly Basis Of Various Items Like Helmets , Breathing Apparatus , Water Jel Blanket , Asbestos Blanket , Hand Gloves ( Rubber / Asbestos ) , First-Aid Box , Stretcher , Resuscicator , Safety Belt , Ear-Muffs , Fire Proximity Suits , Safety Torch , Safety Goggles Including The Cost Of Labour , Material Etc . Complete As Per Instruction Of Engineer-In-Charge . , Cleaning & Stacking Properly The Foam Containers , Updating Stock , Date Of Expiry , Date Of Manufacturing On Board And In Register , Placing Foam Containers At The Foam Monitors And Water Hydrants . , Taking Hose Pipe For Hydrotesting And Keeping It Back In Positionafter Drying /Rolling Inclusive Of All Taxes . , Air Filling In Cylinders Of Breathing Apparatus Inclusive Of All Cost With Transportation . , Hydraulic Testing Of Co2 Cylinders Inclusive Of All Taxes ( 2 To 4 . 5 Kg/Cm2 ) , Hydraulic Testing Of Co2 Cylinders Inclusive Of All Taxes ( 6 . 8 Kg/Cm2 ) , Hydraulic Testing Of Dcp Cylinders Of All Sizes Inclusive Of All Taxes , Hydraulic Testing Of Breathing Appratus Set , Supply & Pasting Of Slips On The Extinguishers Showing How To Use The Extinguishers & Date Wise Maintenance Records Of Fire Extingusher . The Good Quality Of Adehsive To Be Used On Slips For Sticking On The Extinguishers Inclusive Of All Taxes As Per Direction Of Engineer-In-Charge . , Supply And Fixing Of Wind Socks On The Position Including All Labour , Tolls And Tackels As Per Direction Of Engineer-In-Charge Inclusive Of All . , Patch Work Welding On The Firefighting/Foam Line In Case Of Leakage Including All Manpower & Materials With Tools And Tackels With Materials Required As Per Satisfaction Of The Engieer-In-Charge Upto 12X12 Size Inclusive Of All . , First Aid Box With Snake Serum , Fire Bucket , Safety Helmet , Lettering With Black Japan Paint , Supply & Fitting Of Transparent Acrylic Sheet Thickness 3 Mm Of Hose Box Inclusive Of Rubber Beeding By Fixing It With Proper Adhesive Wherever Required Complete In All Respect Inclusive Of Material , Lab Ours , Consumables Etc . ( Inclusive Of Rates For Both Glasses And Rubber Beading . , Complete Overhauling Of Hand Operated Siren Including Oiling , Greasing , Painting And Testing As Per Direction Of Eic Inclusive Of All Tools & Tackles , Transportation , Man-Power Etc , Testing Of Afff As Per Bis:4989 From Reputed Institutes Like Girda Or Any Other Approved Laboratory In All Respect By Providing Cas , Transportation , Man Power Etc . , Maintenance And Calibration Of Multigas Detector Sensor ( Lel , O2 , Co , H2s ) The Charges Includes Cost Of Calibrating Canisters Inspection , Maintenence Of The Detectors And Issuance Of The Calibration Certificates The Cost Of Sending Lel Meterto The Party Workshop ( In India ) Will Be In The Scope Of Iocl But After Calibraiton And Completion Of Work Thecost Of Transportation Of Lel Meter To Iocl Installation Shall Be In Thescope Of Vendor . Rate Are For Calibration Of All Sensor , Make: Crowcon , Uk , Model- Gas-Pro , Make: M/S Respo Products , Model: Qrae Ii , Make: Bw ( Honeywell ) , Model: Gasalertmax , Fire Water Line , Dismantling Of Gate Valves Of Sizes Up To 8 Of Fire Hydrant Line E Etc From Bonnet Cleaning And Lapping The Gate And Refixing It With New Gasket ( Iocl Supplied ) Alongwith All Tools , Tackles , Material , Manpower Etc , Removal Or Installation Of Of Faulty Gate Valves/Nrv/Glove Valve/Strainer Upto 8 Inch Size Including Transportation Either From Owners Storage Point To Workshop Or Work Site Including Tools Tackles , Labour , Etc As Per Direc
Basic Detail
Tender No BK/TS/900/2021-22/12
Bidding Type Tender
Location
City BKPL Allahabad Pump Station
State Uttar Pradesh
Key Dates
Publish Date 24 Jun 2021
Submission Date 15 Jul 2021
Open Date 16 Jul 2021
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
FAQs-IOCL-Online-EMD.pdf
PPE_Matrix.pdf
Tender.pdf
Tendernotice_1.pdf
GeMExemption.pdf
Special_Instructions_to_the_Bidders_20200717.pdf
Tender-Acceptance-Format.pdf
GCC.pdf
BSD.pdf
278721C6-AB05-4747-B4AA-6D2D46EA71EE.html
NDMAClause.pdf
BOQ_147517.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 24, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 15, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jul 16, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

FAQs-IOCL-Online-EMD.pdf

pdf

PPE_Matrix.pdf

pdf

Tender.pdf

pdf

Tendernotice_1.pdf

pdf

GeMExemption.pdf

pdf

Special_Instructions_to_the_Bidders_20200717.pdf

pdf

Tender-Acceptance-Format.pdf

pdf

GCC.pdf

pdf

BSD.pdf

html

278721C6-AB05-4747-B4AA-6D2D46EA71EE.html

pdf

NDMAClause.pdf

xls

BOQ_147517.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders