}

Competitive Ebiddin For Miscellaneous Fabrications Job Works For Season 2021-22, KISAN SAHKARI CHINI MILL LTD. NANAUTA (SAHARANPUR)-Uttar Pradesh

Kisan Sahkari Chini Mills Limited-KHERI has published Competitive Ebiddin For Miscellaneous Fabrications Job Works For Season 2021-22. Submission Date for this Tender is 29-06-2021. Footwears Tenders in KISAN SAHKARI CHINI MILL LTD. NANAUTA (SAHARANPUR) Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

28294764
Competitive Ebiddin For Miscellaneous Fabrications Job Works For Season 2021-22
Open Tender
Indian
Uttar Pradesh
KISAN SAHKARI CHINI MILL LTD. NANAUTA (SAHARANPUR)
29-06-2021

Tender Details

Competitive Ebiddin For Miscellaneous Fabrications Job Works For Season 2021-22-2 Dismantling of C.I. feeding chute of 20 Ton Boiler & fitting of CI mouth-piece/ chute complete work 3 Dismantling fabrication & fitting of complete new casing of ID Fan with cone of Boiler. For 30/20 ton boiler 4 Dismantling fabrication & fitting of complete new casing of ID Fan with cone of Boiler. For 40 ton boiler 5 Fabrication & erection of runner supporting box below at old MBC/New MBC/Cross carrier/ bagasse elevator. 6 Replacement of worn out Bottom & side plate of Bagasse carrier/ Bagasse/Elevator/ cross carrier/ RBC/IRC by MS/SS plates 7 Replacement of worn-out ducting dampers of I.D./ FD Fan, and other ductings with levers and bushes 8 Inside & outside cleaning & painting of boiler chimney in double coat. 9 Replacement of worn-out ducting of flue gas 10 Fabrication & fitting of bagasse chute for new & old boilers 11 Cleaning of holes & jali of fly ash arresters of boilers along with associated pipes, etc along with necessary repairs. 12 Repairing of Rack of Boiler Chain. For New Boiler 13 Repairing of Rack of Boiler Chain. For Old Boiler 14 Fabrication & fitting of bagasse sliding gate for bagasse Carriers 15 Fabrication & Erection of the bagacillo impeller with trial. 16 Dismantling cleaning, painting & hydraulic testing & fitting of Economizer coil of 20 Ton Boiler. 17 Dismantling of old MS plates of boiler side wall ,economiser and boiler roof for replacement of boiler tubes .Dismantled old plates to be fitted with minor repair/ patching after replacement of Boiler tubes . 18 Complete dismantling, fabrication and erection of boiler MS chimney with associated ladder sampling platform etc as per existing or as instructed. 19 Replacement of runners of new MBC /old MBC /bagasse Elevator /Cross Carrier & RBC 20 Welding on teeth of new MBC /old MBC / bagasse Elevator /Cross Carrier & RBC chain sprocket to be done& teeth to be made as per profile 21 Repairing of clarifier with drive and Arms of 40 Ton Boiler Wet Scrubber. 22 Repair of boiler ID Fan casing & successful trial. 23 To replace worn out blower casing of boiler D.M.Plant 24 To replace worn out bagasse blower casing at bagasse elevator 25 Complete repair and hardfacing of I D Fan Impeller with suction cone for boilers 26 Dismantling, fabrication & erection of new boiler I.D. expantion joint 27 Dismantling cleaning, repair & fitting of 30 & 40 Ton boilers internal fitting. 28 Schedule Work 29 Dismantling of M.S. Pipe Line including bend/flange etc Up to 12” dia 30 Fabrication & Erection of M.S. Pipe Line Up to 12” dia 31 Fabrication & Erection of Bend up to 12” dia (MS) 32 Fabrication & Erection of Nipple up to 12” dia (MS) 33 Fabrication & Erection of Cross up to 12” dia (MS) 34 Fabrication & Erection of Tee up to 12” dia (MS) 35 Fabrication & Erection of Flange up to 12” dia (MS) 36 Fabrication & Erection of Blind up to 12” dia (MS) 37 Fabrication & Erection of Reducer up to 12” dia (MS) 38 Fabrication & Erection of Elbow up to 12” dia (MS) 39 Fabrication & Erection of Bend up to 12” dia (SS) 40 Fabrication & Erection of Nipple up to 12” dia (SS) 41 Fabrication & Erection of Cross up to 12” dia (SS) 42 Fabrication & Erection of Tee up to 12” dia (SS) 43 Fabrication & Erection of Flange up to 12” dia (SS) 44 Fabrication & Erection of Blind up to 12” dia (SS) 45 Fabrication & Erection of Reducer up to 12” dia (SS) 46 Fabrication & Erection of Elbow up to 12” dia (SS) 47 Dismantling of valve up to 12” dia 48 Fitting of valve up to 12” dia 49 Dismantling of valve above 12” dia 50 Fitting of valve above12” dia 51 Dismantling Fabrication & fitting of man hole 52 Fabrication & Erection of Bend above 12” dia 53 Fabrication & Erection of Nipple above 12” dia 54 Fabrication & Erection of Tee above 12” dia 55 Fabrication & Erection of Flange above 12” dia 56 Fabrication & Erection of Blind above 12” dia 57 Fabrication & Erection of Reducer above 12” dia 58 Fabrication & Erection of Elbow above 12” dia 59 Dismantling of M.S. Pipe above 12 “ dia 60 Fabrication of M.S. Pipe above 12” dia 61 Erection of M.S. Pipe above 12” dia including bend flange & nipple etc. 62 Dismantling of old worn-out Platform 63 Fabrication & erection of platform by using old plate 64 Fabrication & erection of Cat Ladder 65 Fabrication & erection stair case 66 Fabrication & erection of railing from old Material 67 Fabrication & erection of unvested type ring over evaporator vapour pipe/Pan vapour Pipe 68 Patching replacement of wornout portion of any equipment vessel. 69 Dismantling of S.S. Pipe Line with bend & flange 70 Fitting of S.S. Pipe Line with bend & flange. 71 Dismantling of MS heavy structure / Tank 72 Dismantling of MS Light structure 73 Fabrication & Erection Light structure 74 Fabrication & Erection heavy structure 75 Fabrication of Pump bed with Pump,reduction gear & motor alignment up to 30 H.P. 76 Fabrication of pump bed with pump, reduction gear box & motor above 30 HP 77 Dismantling, fitting and expanding of SS/Brass tubes with satisfactory hydraulic testing for quad/ J. Heater/ Vapour Cells 78 Dismantling, fitting and expanding of SS/Brass tubes with satisfactory hydraulic testing for Pan Tube 79 SS Plate lining in different size of equipments. 80 Dismantling, cleaning & fitting of Pipe Line with bend, flange , nipple etc. 81 Fabrication & Erection of Round Tank with Flat and conical bottom 82 Fabrication & Erection of complete Square / Rectangular Tank 83 Fabrication & fitting of MS Coil (coils are to be duly bend and not offset pipe welding .Offset welds shall not be treated as coils but as pipes ) 84 Fabrication & fitting of SS Coil 85 Welding work for various equipments in B/H 86 Dismantling , Fabrication & fitting of new Cone and umbrella anywhere in the factory. Cone up to 01 Mtr. Dia 87 Dismantling, Fabrication & fitting of new Cone and umbrella any where in the factory. Cone above 01 Mtr. Dia upto 2.5mtr dia. 88 Dismantling , Fabrication & fitting of new Cone and umbrella any where in the factory, Cone above 2.5 Mtr. Dia 89 Fabrication and Patchwotk of equipments using old/ New MS plate upto 6mm dia over round vessels 90 Fabrication and Patchwotk of equipments using old/ New MS plate by 8-10 mm thick plate over round vessels 91 Fabrication and patchwork of flat surfaces using Plate upto 12 mm dia. 92 Strengthening of columns and beams of equipment using old/ new plates.by stitch / tack welding 93 Mill House 94 Cutting of Cheveran Grooves on Mill Rollers 95 Cutting of pine apple grooves on Mill Rollers. 96 Replacement of Runners of cane carrier ,S.RC & IRC MBC and RBC and cane unloader power supply angle 97 Fabrication of Racks of S.RC & IRC and due modification of wear plate arrangement using metlon pads 98 Repair of S.RC & IRC Racks and due modification of wear plate arrangement using metlon pads 99 Welding of worn-out holes of Block type chain Link, Rack holding square and due re drilling of holes 100 Replacement of worn-out boot of SRC& IRC 101 Fabrication of new juice rings 102 Dismantling, Grinding & erection of the square bar of cane unloader 103 Welding on Wearout Mill and GRPF crown pinion Teeth as per profile.(underfeed etc pinions are not included) 104 Fabrication and replacement of new Mill Juice/water imbibitions box/distributer. 105 Fabrication. & erection. of Mill roller feed & discharge bearing cover from 10 mm/ 8mm plate. 106 Fabrication & Erection of runner supporting box below runner at IRC, SRC & cane carrier,MBC and RBC and Bagasse elevator. 107 Replacement of worn out deflector plate and top plate of cane chopper/ cane leveler /Fibrizer by M.S. plate/ ss lining plates along with strengthening. 108 Replacement of worn out M S and SS bottom plates of SRC & IRC. RBC/MBC etc 109 Fabrication & erection of cane carrier chain side angle. 110 Fabrication & erection of return cane carrier chain supporting runner/chain guide. 111 Fabrication & Erection of worn out MS Plate of truck Tripler, SRC, IRC & cane carrier side plate. 112 Broken Partition Plates of Complete fibrizer anvil Plates to be replaced & hard facing to be done, 113 Repair & hard facing of Auxiliary cane carrier Kicker /Pusher 114 Welding & Hard facing on wear out under feed roller teeth, side & Shell of roller. 115 Replacement of worn-out Juice screen Plate of screw bagasse conveyor at mill 116 Repair and hard facing on cane leveller/ chopper/ Fibrizer hubs 117 At cane unloader Motor bed to be fabricated & alignment to be done up to 40 HP 118 Repair & hard facing on wear out cane leveler hubs 119 Lever bracket of underfeed roller scraper to be changed & to be fitted on as per direction. 120 Partition plate of half anvil to be changed completely with 25 mm plate & hard facing. 121 Welding and forging in holes of cane carrier chain links. 122 Fabrication of 10” size Non return valve from M.S. Plate with fitting & leak proof trial. 123 Fabrication & erection of mill juice distributor chute. 124 Fibrizer hammers to be made as per size & weight by welding & hard facingto be done. 125 Fabrication and erection of Rotary filter MS conical juice tank 126 Extention of SS Juice distributer pipe of rotary filter 127 Repair of cane carrier slates such as worn-out side wear plates holes & other to be done. 128 Fabrication & hard facing of under feed roller scrapper as per instuctions to be done. 129 Welding on wear out teeth of cane carrier, S.R.C. & I.R.C. sprockets to be done & teeth to be made as per profile. 130 Welding & grinding of G.R.P.F. scrapper to be done to make them as per profile & hard facing to be done. 131 M.S. ring to be fitted on worn-out both side of bagasse pusher at fibrizer & hard facing to be done square bars fitted. 132 Welding & griding of G.R.P.F. scrapper to be done to make them as per profile & hard facing to be done. 133 Repair & hard facing of cane unloader grab finger. 134 Repairing of mill roller crown pinion M.S. guard/cover 135 Pan House 136 Dismantling Fabrication & fitting of new down take of Pan for 40/50 Ton Pan 137 Dismantling Fabrication & fitting of new down take of Pan for 60/80 Ton Pan 138 Replacement of worn out/ broken angle arms of crystalizer 139 Dismantling of Gutter of Molasses Magma & massecuite. 140 Fabrication & fitting of Gutter of Molasses, Magma & massecuite. 141 Fabrication & fitting of flap valve of Gutter 142 Replacement of worn-out condensate box of pans, quad & juice heaters 143 Dismantling Fabrication & fitting of umbrella in pans with supports & J pipes 40/50 Ton pan 144 Dismantling Fabrication & fitting of umbrella in pans with supports & J pipes 60/80 Ton pan 145 Repairing of umbrella of Pans with supports & J pipes 40/50 Ton pan 146 Repairing of umbrella of Pans with supports & J pipes 60/80 Ton pan 147 Replacement of worn out distributor by new for 40/50 Ton Pan 148 Replacement of worn out distributor by new for 60/80 Ton Pan 149 Repair of wornout/broken ribbon of air cooled ,vacuum & seed crystalizer 150 Dismantling & erection of pan catcher 151 Repairing of wornout/wearout pan catcher 152 Replacement of complete worn-out top conical portion of Pan by new with supports of associated machinery parts proper strengthening- 40/50 Ton Pan 153 Replacement of complete worn-out top conical portion of Pan by new with supports of associated machinery parts proper strengthening- 60/80Ton Pan 154 Replacement/modification of Worn-out & broken stirrer Arms by ribbons type Air cooled, vaccum & seed crystallizer to be replaced after fabrication as per direction 155 Replacement of worn out bushes of air cooled crystallizer of both side & completion with proper alignment & successful trial (Bushes will be provided by the factory)- Both side (rate ratio drive : non drive end shall be 65:35) 156 Dismantling Fabrication & Erection of Box type feed header for each Pan with related all connections. 157 Dismantling, Fabrication & erection of worn out portion of Pan body with 12 mm Plate with water & vacuum trial 158 Complete replacement of A- Side grain crystallizer with associated connections arms, drives, etc. 159 Repairing of wearout/wornout down take of pans 40/50 Ton 160 Repairing of wearout/wornout down take of pans 60/80 Ton 161 Repairing of wearout/wornout save-all of pans 40/50 Ton 162 Repairing of wearout/wornout save-all of pans 60/80 Ton 163 Replacement of wearout/wornout Ms side & bottom plate of water over head tank/ syrup storage tankes at pan station 164 Dismantling & erection of new 40 Ton pan calenderia supplied by factory with all connection & successful trial 165 Evaporator & Clarification House 166 Dismantling, repair & refitting of catcher of new Semikestner Uttam Set 167 Dismantling, fabrication & erection work of Evaporator body/ Semikestner /vapour cell new save all 168 Major repair of evaporator body/Semikestner /vapour cell save all. 169 Dismantling, fabrication & erection work of new ammonia Jacket of Evaporator body/Pan body with satisfactory trial 170 Dismantling, fabrication & erection of new Juice heater Header with ribs & fitting of cover with satisfactory trial 171 Dismantling, fabrication & erection work of the sulphur furnace melter/melt receiver along with steam coil and their hydraulic testing. 172 Dismantling, Fabrication & erection of sulphur furnace cooler with its pipe cooling coil complete connection of water and associated pipe lines with satisfactory trial 173 Repairing of sulphur furnace cooler with its pipe cooling coil and complete connection of water cooling pipe and gas line. 174 Dismantling, fabrication & erection of Juice receiving bottle fitted at vacuum filter station 175 Dismantling, fabrication & erection of condenser at vacuum filter. 176 Dismantling, fabrication & erection of Mud juice receiving tank complete with connection & associated pipe lines. 177 Dismantling, fabrication & erection of entrainment catcher at vacuum pump/raw & sulphited pump/Sugar melter 178 Dismantling, fabrication & erection of mud tray of vacuum 8’ x16’ vacuum filter 179 Dismantling, fabrication & erection of mud tray of vacuum 10’ x20’ vacuum filter 180 Dismantling, fabrication & erection of vacuum filter agitator. 181 Dismantling, fabrication & erection of the juice box of juice heater with satisfactory trial. 182 Dismantling Fabrication & fitting of bagacillo pipe. 183 Dismantling, fabrication & erection of completely New Evaporator Condensate bottle / syrup receiving bottle with leak proof partition plate with all connection & trial. 184 Dismantling, fabrication & erection of juice box of juice sulphitor as per sample. 185 Dismantling, fabrication & erection of the nipple to be made from12 mm thick plate for Nipple 6” dia 186 Dismantling, fabrication & erection of the nipple to be made from12 mm thick plate for Nipple 8” dia 187 Dismantling , fabrication & erection of clear juice Liquidation box with trial 188 Dismantling, fabrication & erection of clarifier mud boot. 189 Dismantling, fabrication & erection of Juice catcher for Raw /sulphited Juice pumps with suction/ delivery connection 190 Repairing of Juice Heater Condensate Bottle /Evaporator/Syrup receiving Bottle with leak proof testing partition plate with all connection. 191 Fabrication & erection of angle valve from 600mm upto 1000 mm for vapour bleeding. 192 Repairing of So2 furnace sublimation pipe with its leaking Tower etc. with testing 193 Dismantling, fabrication & erection of vacuum filter mud mixer body & fitting of screw conveyor with proper alignment & satisfactory trial. 194 Fabrication & erection of screw conveyor from 6mm thick plate with satisfactory trial. 195 Dismantling, fabrication & erection of condensate box of Evaporator bodies. 196 Dismantling, fabrication & fitting of new down take of quad / Old or New semikestner, etc. 197 Dismantling fabrication and erection of new recovery tower of juice sulphiter/ Syrup.Sulphiter. 198 Replacement of muddy juice tank fitted at vacuum filter with new plates & with all connections. 199 Repairing of Umbrella of Quad. 200 Dismantling, fabrication & erection of worn out Umbrella of Quad. 201 Dismantling, fabrication & erection of External catcher/ saveall of Quad old bodies 202 Dismantling, fabrication & erection of External catcher/ saveall of Quad Uttam set. 203 Replacement of worn-out top conical portion of Quad with proper strengthening with associated machinery 204 Dismantling, Repair, & erection of worn out Juice heater partition plate with ribs. 205 Dismantling of worn out arms and shell ( out side & inside) of juice sulphiter drum, fabrication & erection with satisfactory trial. 206 Dismantling of worn out central drum & bed of juice sulphiter, fabrication & erection with satisfactory trial. 207 To replace worn out clear juice box / mud discharge box with valve of new door followed by satisfactory trial 208 Dismantling of wear out juice heater cover, fitting of new 12 mm thick MS plate by welding & bolting including repair of lever & erection of cover followed by satisfactory water trial. 209 To replace worn out mud scrapper plate with support & vacuum filter fitting to be done. 210 To replace worn out juice baffle plate / partition plate of dorr compartment 211 Fabrication & erection of new sulphur furnace after dismantling of old furnace with successful water/Air trial. 212 Major repair of lime slaker with proper alignment & trial 213 Dismantling of old worn-out vapour cell 950 sq mtr. H.S. calendria after providing proper support arrangement and erection of newly supplied calendria with proper welding & connections etc. and to give successful vaccum/ water tank 214 Dismantaling & erection of New QuadVLJH including all connection with successful trial. 215 Dismantling & erection of Quad 440 sq. mtr. calendria include all connection with successful trail 216 Centrifugal House 217 To replace worn-out molasses Jacket of B & C Continuous Centrifugal Machine followed by proper Trial. 218 To Replace worn-out “A” Centrifugal Machine Molasses Chute/housing chute followed by satisfactory trial. 219 To replace worn out half portion of horizontal sugar melter in Centrifugal house with steam & juice connection followed by satisfactory trial. 220 Dismantling of worn out B & C centrifugal m/c, Magma mixture shaft, fabrication of complete new shaft with 12mm plate, fitting of arms etc. with successful trial. 221 Replacement of damaged portion of hopper 222 Broken shaft of crystallizer to be made correct or replaced by new one and their proper alignment to be done. 223 Fabrication & fitting of damper in gutter. 224 Replacement of wornout bushes & arms of sugar melter with satisfactory trial. 225 Replacement of cooling jackt pipe of C & B mono crystallizer. 226 Replacement of wornout suction mouth piece of MF-50x50/40x40 injection & spray pump. 227 C- Pugmill, Mugma mixer, broken shaft to be takenout and to be repaired/ to be changed new, bush, support & Aram to be fitted a satisfactory trial. 228 Repairing of B & C massecuite mono Cryst. Leakage coil with Hydraulic testing & successful trial. 229 B & C Mamga Mixer, Pugmill worn-out broken Shell to be replaced, work to be completed with satisfactory trial. 230 Dis. Of worn-out B & C magma mixer shaft, fab.& erection of the shaft with 12mm M.S. Plate, fitting and successful trial. 231 Replacement of worn-out juice ring of 1350 KT C/F Machine. 232 Dis., Fab. & Erection of E.T.P. aerator.

Key Value

Document Fees
INR 590 /-
EMD
INR 25000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: COMPETETIVE E-BIDDING FOR SUPPLY OF MISC. FABRICATION JOB &ERECTION WORK IN DIFFERENT ITEMS
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Boiler House 1
2 1.01 Dismantling of C.I. feeding chute of 20 Ton Boiler & fitting of CI mouth-piece/ chute complete work 1.01 1 Each
3 1.02 Dismantling fabrication & fitting of complete new casing of ID Fan with cone of Boiler. For 30/20 ton boiler 1.02 1 Each
4 1.03 Dismantling fabrication & fitting of complete new casing of ID Fan with cone of Boiler. For 40 ton boiler 1.03 1 Each
5 1.04 Fabrication & erection of runner supporting box below at old MBC/New MBC/Cross carrier/ bagasse elevator. 1.04 1 Rs ---------Mts
6 1.05 Replacement of worn out Bottom & side plate of Bagasse carrier/ Bagasse/Elevator/ cross carrier/ RBC/IRC by MS/SS plates 1.05 1 Sq Mts
7 1.06 Replacement of worn-out ducting dampers of I.D./ FD Fan, and other ductings with levers and bushes 1.06 1 Each damper
8 1.07 Inside & outside cleaning & painting of boiler chimney in double coat. 1.07 1 each
9 1.08 Replacement of worn-out ducting of flue gas 1.08 1 Rs-----Metric tons
10 1.09 Fabrication & fitting of bagasse chute for new & old boilers 1.09 1 each
11 1.1 Cleaning of holes & jali of fly ash arresters of boilers along with associated pipes, etc along with necessary repairs. 1.1 1 Rs………per boiler
12 1.11 Repairing of Rack of Boiler Chain. For New Boiler 1.11 1 each
13 1.12 Repairing of Rack of Boiler Chain. For Old Boiler 1.12 1 each
14 1.13 Fabrication & fitting of bagasse sliding gate for bagasse Carriers 1.13 1 each
15 1.14 Fabrication & Erection of the bagacillo impeller with trial. 1.14 1 each
16 1.15 Dismantling cleaning, painting & hydraulic testing & fitting of Economizer coil of 20 Ton Boiler. 1.15 1 each
17 1.16 Dismantling of old MS plates of boiler side wall ,economiser and boiler roof for replacement of boiler tubes .Dismantled old plates to be fitted with minor repair/ patching after replacement of Boiler tubes . 1.16 1 Rs….per MT
18 1.17 Complete dismantling, fabrication and erection of boiler MS chimney with associated ladder sampling platform etc as per existing or as instructed. 1.17 1 Running mtr
19 1.18 Replacement of runners of new MBC /old MBC /bagasse Elevator /Cross Carrier & RBC 1.18 1 Running mtr
20 1.19 Welding on teeth of new MBC /old MBC / bagasse Elevator /Cross Carrier & RBC chain sprocket to be done& teeth to be made as per profile 1.19 1 each
21 1.2 Repairing of clarifier with drive and Arms of 40 Ton Boiler Wet Scrubber. 1.2 1 lumpsum
22 1.21 Repair of boiler ID Fan casing & successful trial. 1.21 1 lumpsum
23 1.22 To replace worn out blower casing of boiler D.M.Plant 1.22 1 Each
24 1.23 To replace worn out bagasse blower casing at bagasse elevator 1.23 1 Each
25 1.24 Complete repair and hardfacing of I D Fan Impeller with suction cone for boilers 1.24 1 Rs------------LS each
26 1.25 Dismantling, fabrication & erection of new boiler I.D. expantion joint 1.25 1 Rs------------LS each
27 1.26 Dismantling cleaning, repair & fitting of 30 & 40 Ton boilers internal fitting. 1.26 1 Rs------------LS each
28 2 Schedule Work 2
29 2.01 Dismantling of M.S. Pipe Line including bend/flange etc Up to 12” dia 2.01 1 Rs……...per inch dia/per ft length
30 2.02 Fabrication & Erection of M.S. Pipe Line Up to 12” dia 2.02 1 Rs……...per inch dia/per ft length
31 2.03 Fabrication & Erection of Bend up to 12” dia (MS) 2.03 1 Rs………….per inch dia
32 2.04 Fabrication & Erection of Nipple up to 12” dia (MS) 2.04 1 Rs………….per inch dia
33 2.05 Fabrication & Erection of Cross up to 12” dia (MS) 2.05 1 Rs………….per inch dia
34 2.06 Fabrication & Erection of Tee up to 12” dia (MS) 2.06 1 Rs………….per inch dia
35 2.07 Fabrication & Erection of Flange up to 12” dia (MS) 2.07 1 Rs…….........per inch dia
36 2.08 Fabrication & Erection of Blind up to 12” dia (MS) 2.08 1 Rs…….........per inch dia
37 2.09 Fabrication & Erection of Reducer up to 12” dia (MS) 2.09 1 Rs…….........per inch dia
38 2.1 Fabrication & Erection of Elbow up to 12” dia (MS) 2.1 1 Rs…….........per inch dia
39 2.11 Fabrication & Erection of Bend up to 12” dia (SS) 2.11 1 Rs…….........per inch dia
40 2.12 Fabrication & Erection of Nipple up to 12” dia (SS) 2.12 1 Rs………….per inch dia
41 2.13 Fabrication & Erection of Cross up to 12” dia (SS) 2.13 1 Rs………….per inch dia
42 2.14 Fabrication & Erection of Tee up to 12” dia (SS) 2.14 1 Rs………….per inch dia
43 2.15 Fabrication & Erection of Flange up to 12” dia (SS) 2.15 1 Rs………….per inch dia
44 2.16 Fabrication & Erection of Blind up to 12” dia (SS) 2.16 1 Rs…….........per inch dia
45 2.17 Fabrication & Erection of Reducer up to 12” dia (SS) 2.17 1 Rs…….........per inch dia
46 2.18 Fabrication & Erection of Elbow up to 12” dia (SS) 2.18 1 Rs…….........per inch dia
47 2.19 Dismantling of valve up to 12” dia 2.19 1 Rs…….........per inch dia
48 2.2 Fitting of valve up to 12” dia 2.2 1 Rs…….........per inch dia
49 2.21 Dismantling of valve above 12” dia 2.21 1 Rs…….........per inch dia
50 2.22 Fitting of valve above12” dia 2.22 1 Rs…….........per inch dia
51 2.23 Dismantling Fabrication & fitting of man hole 2.23 1 Rs…………..Each
52 2.24 Fabrication & Erection of Bend above 12” dia 2.24 1 Rs…….........per inch dia
53 2.25 Fabrication & Erection of Nipple above 12” dia 2.25 1 Rs…….........per inch dia
54 2.26 Fabrication & Erection of Tee above 12” dia 2.26 1 Rs…….........per inch dia
55 2.27 Fabrication & Erection of Flange above 12” dia 2.27 1 Rs…….........per inch dia
56 2.28 Fabrication & Erection of Blind above 12” dia 2.28 1 Rs…….........per inch dia
57 2.29 Fabrication & Erection of Reducer above 12” dia 2.29 1 Rs…….........per inch dia
58 2.3 Fabrication & Erection of Elbow above 12” dia 2.3 1 Rs…….........per inch dia
59 2.31 Dismantling of M.S. Pipe above 12 “ dia 2.31 1 Rs………….Per Ton
60 2.32 Fabrication of M.S. Pipe above 12” dia 2.32 1 Rs………….Per Ton
61 2.33 Erection of M.S. Pipe above 12” dia including bend flange & nipple etc. 2.33 1 Rs………….Per Ton
62 2.34 Dismantling of old worn-out Platform 2.34 1 Rs………… Per Ton
63 2.35 Fabrication & erection of platform by using old plate 2.35 1 Rs………….Per Ton
64 2.36 Fabrication & erection of Cat Ladder 2.36 1 Rs……………….PerMtr.
65 2.37 Fabrication & erection stair case 2.37 1 Rs………………Per Mtr
66 2.38 Fabrication & erection of railing from old Material 2.38 1 Rs………………Per Mtr.
67 2.39 Fabrication & erection of unvested type ring over evaporator vapour pipe/Pan vapour Pipe 2.39 1 Rs……………..Per ring
68 2.4 Patching replacement of wornout portion of any equipment vessel. 2.4 1 Rs……………Per Mtr2
69 2.41 Dismantling of S.S. Pipe Line with bend & flange 2.41 1 Rs……...per inch dia/ ft.
70 2.42 Fitting of S.S. Pipe Line with bend & flange. 2.42 1 Rs……...per inch dia/ ft.
71 2.43 Dismantling of MS heavy structure / Tank 2.43 1 Rs……...............Per MT
72 2.44 Dismantling of MS Light structure 2.44 1 Rs……...............Per MT
73 2.45 Fabrication & Erection Light structure 2.45 1 Rs……...............Per MT
74 2.46 Fabrication & Erection heavy structure 2.46 1 Rs……...............Per MT
75 2.47 Fabrication of Pump bed with Pump,reduction gear & motor alignment up to 30 H.P. 2.47 1 Rs……...............Per HP
76 2.48 Fabrication of pump bed with pump, reduction gear box & motor above 30 HP 2.48 1 Rs……...............Per HP
77 2.49 Dismantling, fitting and expanding of SS/Brass tubes with satisfactory hydraulic testing for quad/ J. Heater/ Vapour Cells 2.49 1 Each Tube
78 2.5 Dismantling, fitting and expanding of SS/Brass tubes with satisfactory hydraulic testing for Pan Tube 2.5 1 Each Tube
79 2.51 SS Plate lining in different size of equipments. 2.51 1 Rs……...............Per Mtr2
80 2.52 Dismantling, cleaning & fitting of Pipe Line with bend, flange , nipple etc. 2.52 1 Rs……....per inch dia/ ft.
81 2.53 Fabrication & Erection of Round Tank with Flat and conical bottom 2.53 1 Rs……...............Per MT
82 2.54 Fabrication & Erection of complete Square / Rectangular Tank 2.54 1 Rs……...............Per MT
83 2.55 Fabrication & fitting of MS Coil (coils are to be duly bend and not offset pipe welding .Offset welds shall not be treated as coils but as pipes ) 2.55 1 Rs……...per inch dia/ ft
84 2.56 Fabrication & fitting of SS Coil 2.56 1 Rs……...per inch dia/ ft
85 2.57 Welding work for various equipments in B/H 2.57 1 Rs……...............Per Mtr
86 2.58 Dismantling , Fabrication & fitting of new Cone and umbrella anywhere in the factory. Cone up to 01 Mtr. Dia 2.58 1 Rs……...............Each
87 2.59 Dismantling, Fabrication & fitting of new Cone and umbrella any where in the factory. Cone above 01 Mtr. Dia upto 2.5mtr dia. 2.59 1 Rs……...............Each
88 2.6 Dismantling , Fabrication & fitting of new Cone and umbrella any where in the factory, Cone above 2.5 Mtr. Dia 2.6 1 Rs……...............Each
89 2.61 Fabrication and Patchwotk of equipments using old/ New MS plate upto 6mm dia over round vessels 2.61 1 Rs-----------------MT
90 2.62 Fabrication and Patchwotk of equipments using old/ New MS plate by 8-10 mm thick plate over round vessels 2.62 1 Rs-----------------MT
91 2.63 Fabrication and patchwork of flat surfaces using Plate upto 12 mm dia. 2.63 1 Rs-----------------MT
92 2.64 Strengthening of columns and beams of equipment using old/ new plates.by stitch / tack welding 2.64 1 Rs --------------- Running metre
93 3 Mill House 3
94 3.01 Cutting of Cheveran Grooves on Mill Rollers 3.01 1 Rs. ……..Each Roller
95 3.02 Cutting of pine apple grooves on Mill Rollers. 3.02 1 Rs………Each Roller
96 3.03 Replacement of Runners of cane carrier ,S.RC & IRC MBC and RBC and cane unloader power supply angle 3.03 1 Rs. ……..Per Mtr.
97 3.04 Fabrication of Racks of S.RC & IRC and due modification of wear plate arrangement using metlon pads 3.04 1 Rs………Per Rack
98 3.05 Repair of S.RC & IRC Racks and due modification of wear plate arrangement using metlon pads 3.05 1 Rs………Per Rack
99 3.06 Welding of worn-out holes of Block type chain Link, Rack holding square and due re drilling of holes 3.06 1 Rs………Each Link
100 3.07 Replacement of worn-out boot of SRC& IRC 3.07 1 Rs………Per boot
101 3.08 Fabrication of new juice rings 3.08 1 Rs………Each ring
102 3.09 Dismantling, Grinding & erection of the square bar of cane unloader 3.09 1 Rs.…………Per Mtr.
103 3.1 Welding on Wearout Mill and GRPF crown pinion Teeth as per profile.(underfeed etc pinions are not included) 3.1 1 Rs………Each pinion
104 3.11 Fabrication and replacement of new Mill Juice/water imbibitions box/distributer. 3.11 1 Rs………Each Box
105 3.12 Fabrication. & erection. of Mill roller feed & discharge bearing cover from 10 mm/ 8mm plate. 3.12 1 Rs………Each cover
106 3.13 Fabrication & Erection of runner supporting box below runner at IRC, SRC & cane carrier,MBC and RBC and Bagasse elevator. 3.13 1 Rs.…………Per Mtr.
107 3.14 Replacement of worn out deflector plate and top plate of cane chopper/ cane leveler /Fibrizer by M.S. plate/ ss lining plates along with strengthening. 3.14 1 Rs.………… Per Mtr2
108 3.15 Replacement of worn out M S and SS bottom plates of SRC & IRC. RBC/MBC etc 3.15 1 Rs.………… Per Mtr2
109 3.16 Fabrication & erection of cane carrier chain side angle. 3.16 1 Rs……………Per fit
110 3.17 Fabrication & erection of return cane carrier chain supporting runner/chain guide. 3.17 1 Rs…………….Per fit
111 3.18 Fabrication & Erection of worn out MS Plate of truck Tripler, SRC, IRC & cane carrier side plate. 3.18 1 Rs.……Per Mtr.Sq.
112 3.19 Broken Partition Plates of Complete fibrizer anvil Plates to be replaced & hard facing to be done, 3.19 1 Rs………..L.S.
113 3.2 Repair & hard facing of Auxiliary cane carrier Kicker /Pusher 3.2 1 Rs………..each
114 3.21 Welding & Hard facing on wear out under feed roller teeth, side & Shell of roller. 3.21 1 Rs………..each
115 3.22 Replacement of worn-out Juice screen Plate of screw bagasse conveyor at mill 3.22 1 Rs………..each
116 3.23 Repair and hard facing on cane leveller/ chopper/ Fibrizer hubs 3.23 1 Rs………..L.S. each
117 3.24 At cane unloader Motor bed to be fabricated & alignment to be done up to 40 HP 3.24 1 Rs…per HP
118 3.25 Repair & hard facing on wear out cane leveler hubs 3.25 1 Rs. ………..L.S.
119 3.26 Lever bracket of underfeed roller scraper to be changed & to be fitted on as per direction. 3.26 1 Rs…………each
120 3.27 Partition plate of half anvil to be changed completely with 25 mm plate & hard facing. 3.27 1 Rs………….L.S.
121 3.28 Welding and forging in holes of cane carrier chain links. 3.28 1 Rs……Each.Link
122 3.29 Fabrication of 10” size Non return valve from M.S. Plate with fitting & leak proof trial. 3.29 1 Rs……..Each valve
123 3.3 Fabrication & erection of mill juice distributor chute. 3.3 1 Rs…………each
124 3.31 Fibrizer hammers to be made as per size & weight by welding & hard facingto be done. 3.31 1 Rs…………each
125 3.32 Fabrication and erection of Rotary filter MS conical juice tank 3.32 1 Rs….L.S
126 3.33 Extention of SS Juice distributer pipe of rotary filter 3.33 1 Rs…..L.S
127 3.34 Repair of cane carrier slates such as worn-out side wear plates holes & other to be done. 3.34 1 Rs…………each
128 3.35 Fabrication & hard facing of under feed roller scrapper as per instuctions to be done. 3.35 1 Rs…………each
129 3.36 Welding on wear out teeth of cane carrier, S.R.C. & I.R.C. sprockets to be done & teeth to be made as per profile. 3.36 1 Rs…………each
130 3.37 Welding & grinding of G.R.P.F. scrapper to be done to make them as per profile & hard facing to be done. 3.37 1 Rs…………each
131 3.38 M.S. ring to be fitted on worn-out both side of bagasse pusher at fibrizer & hard facing to be done square bars fitted. 3.38 1 Rs…………each
132 3.39 Welding & griding of G.R.P.F. scrapper to be done to make them as per profile & hard facing to be done. 3.39 1 Rs…………each
133 3.4 Repair & hard facing of cane unloader grab finger. 3.4 1 Rs…………each
134 3.41 Repairing of mill roller crown pinion M.S. guard/cover 3.41 1 Rs……each/L.S.
135 4 Pan House 4
136 4.01 Dismantling Fabrication & fitting of new down take of Pan for 40/50 Ton Pan 4.01 1 Each
137 4.02 Dismantling Fabrication & fitting of new down take of Pan for 60/80 Ton Pan 4.02 1 Each
138 4.03 Replacement of worn out/ broken angle arms of crystalizer 4.03 1 Rs…..each arm
139 4.04 Dismantling of Gutter of Molasses Magma & massecuite. 4.04 1 Mtr.
140 4.05 Fabrication & fitting of Gutter of Molasses, Magma & massecuite. 4.05 1 Sq. Mtr.
141 4.06 Fabrication & fitting of flap valve of Gutter 4.06 1 Each
142 4.07 Replacement of worn-out condensate box of pans, quad & juice heaters 4.07 1 Each
143 4.08 Dismantling Fabrication & fitting of umbrella in pans with supports & J pipes 40/50 Ton pan 4.08 1 Rs... L.S. Each
144 4.09 Dismantling Fabrication & fitting of umbrella in pans with supports & J pipes 60/80 Ton pan 4.09 1 Rs...L.S. Each
145 4.1 Repairing of umbrella of Pans with supports & J pipes 40/50 Ton pan 4.1 1 Rs... L.S Each
146 4.11 Repairing of umbrella of Pans with supports & J pipes 60/80 Ton pan 4.11 1 Rs L.S. Each
147 4.12 Replacement of worn out distributor by new for 40/50 Ton Pan 4.12 1 Rs... L.S. Each
148 4.13 Replacement of worn out distributor by new for 60/80 Ton Pan 4.13 1 Rs L.S. Each
149 4.14 Repair of wornout/broken ribbon of air cooled ,vacuum & seed crystalizer 4.14 1 Rs…..each crystalizer
150 4.15 Dismantling & erection of pan catcher 4.15 1 L.S. each
151 4.16 Repairing of wornout/wearout pan catcher 4.16 1 L.S. each
152 4.17 Replacement of complete worn-out top conical portion of Pan by new with supports of associated machinery parts proper strengthening- 40/50 Ton Pan 4.17 1 Rs…..L.S. Each
153 4.18 Replacement of complete worn-out top conical portion of Pan by new with supports of associated machinery parts proper strengthening- 60/80Ton Pan 4.18 1 Rs….L.S. Each
154 4.19 Replacement/modification of Worn-out & broken stirrer Arms by ribbons type Air cooled, vaccum & seed crystallizer to be replaced after fabrication as per direction 4.19 1 Rs….L.S.Each
155 4.2 Replacement of worn out bushes of air cooled crystallizer of both side & completion with proper alignment & successful trial (Bushes will be provided by the factory)- Both side (rate ratio drive : non drive end shall be 65:35) 4.2 1 Each crystallizer
156 4.21 Dismantling Fabrication & Erection of Box type feed header for each Pan with related all connections. 4.21 1 Each
157 4.22 Dismantling, Fabrication & erection of worn out portion of Pan body with 12 mm Plate with water & vacuum trial 4.22 1 Mtr.2
158 4.23 Complete replacement of A- Side grain crystallizer with associated connections arms, drives, etc. 4.23 1 Rs…Lumsum
159 4.24 Repairing of wearout/wornout down take of pans 40/50 Ton 4.24 1 Rs….each
160 4.25 Repairing of wearout/wornout down take of pans 60/80 Ton 4.25 1 Rs….each
161 4.26 Repairing of wearout/wornout save-all of pans 40/50 Ton 4.26 1 Rs…each
162 4.27 Repairing of wearout/wornout save-all of pans 60/80 Ton 4.27 1 Rs…..each
163 4.28 Replacement of wearout/wornout Ms side & bottom plate of water over head tank/ syrup storage tankes at pan station 4.28 1 Rs….per sq. mtr.
164 4.29 Dismantling & erection of new 40 Ton pan calenderia supplied by factory with all connection & successful trial 4.29 1 Rs…….L.S.
165 5 Evaporator & Clarification House 5
166 5.01 Dismantling, repair & refitting of catcher of new Semikestner Uttam Set 5.01 1 Rs………….L.S. each
167 5.02 Dismantling, fabrication & erection work of Evaporator body/ Semikestner /vapour cell new save all 5.02 1 Rs………….L.S. each
168 5.03 Major repair of evaporator body/Semikestner /vapour cell save all. 5.03 1 Rs………….L.S. each
169 5.04 Dismantling, fabrication & erection work of new ammonia Jacket of Evaporator body/Pan body with satisfactory trial 5.04 1 Rs………….L.S. each
170 5.05 Dismantling, fabrication & erection of new Juice heater Header with ribs & fitting of cover with satisfactory trial 5.05 1 Rs………LS. each side
171 5.06 Dismantling, fabrication & erection work of the sulphur furnace melter/melt receiver along with steam coil and their hydraulic testing. 5.06 1 Rs………L.S. Each
172 5.07 Dismantling, Fabrication & erection of sulphur furnace cooler with its pipe cooling coil complete connection of water and associated pipe lines with satisfactory trial 5.07 1 Rs………..L.S. each
173 5.08 Repairing of sulphur furnace cooler with its pipe cooling coil and complete connection of water cooling pipe and gas line. 5.08 1 Rs……….L.S. each
174 5.09 Dismantling, fabrication & erection of Juice receiving bottle fitted at vacuum filter station 5.09 1 Rs………L.S. each
175 5.1 Dismantling, fabrication & erection of condenser at vacuum filter. 5.1 1 Rs………L.S. each
176 5.11 Dismantling, fabrication & erection of Mud juice receiving tank complete with connection & associated pipe lines. 5.11 1 Rs………Per Tank
177 5.12 Dismantling, fabrication & erection of entrainment catcher at vacuum pump/raw & sulphited pump/Sugar melter 5.12 1 Rs………L.S. each
178 5.13 Dismantling, fabrication & erection of mud tray of vacuum   8’ x16’ vacuum filter 5.13 1 Rs……….Each tray
179 5.14 Dismantling, fabrication & erection of mud tray of vacuum   10’ x20’ vacuum filter 5.14 1 Rs……….Each tray
180 5.15 Dismantling, fabrication & erection of vacuum filter agitator. 5.15 1 Rs………………Each
181 5.16 Dismantling, fabrication & erection of the juice box of juice heater with satisfactory trial. 5.16 1 Rs…………..L.S. Each
182 5.17 Dismantling Fabrication & fitting of bagacillo pipe. 5.17 1 Rs …---------- Running mtrs
183 5.18 Dismantling, fabrication & erection of completely New Evaporator Condensate bottle / syrup receiving bottle with leak proof partition plate with all connection & trial. 5.18 1 Rs………….Per Bottle.
184 5.19 Dismantling, fabrication & erection of juice box of juice sulphitor as per sample. 5.19 1 Rs……………Per box
185 5.2 Dismantling, fabrication & erection of the nipple to be made from12 mm thick plate for Nipple 6” dia 5.2 1 Rs………..Per Nipple
186 5.21 Dismantling, fabrication & erection of the nipple to be made from12 mm thick plate for Nipple 8” dia 5.21 1 Rs………..Per Nipple
187 5.22 Dismantling , fabrication & erection of clear juice Liquidation box with trial 5.22 1 Rs………….L.S. each
188 5.23 Dismantling, fabrication & erection of clarifier mud boot. 5.23 1 Rs……………..each
189 5.24 Dismantling, fabrication & erection of Juice catcher for Raw /sulphited Juice pumps with suction/ delivery connection 5.24 1 Rs………..Per catcher
190 5.25 Repairing of Juice Heater Condensate Bottle /Evaporator/Syrup receiving Bottle with leak proof testing partition plate with all connection. 5.25 1 Rs…………..L.S. each
191 5.26 Fabrication & erection of angle valve from 600mm upto 1000 mm for vapour bleeding. 5.26 1 Rs………….L.S. each
192 5.27 Repairing of So2 furnace sublimation pipe with its leaking Tower etc. with testing 5.27 1 Rs…………L.S. each
193 5.28 Dismantling, fabrication & erection of vacuum filter mud mixer body & fitting of screw conveyor with proper alignment & satisfactory trial. 5.28 1 Rs……………….L.S.
194 5.29 Fabrication & erection of screw conveyor from 6mm thick plate with satisfactory trial. 5.29 1 Rs………………..L.S.
195 5.3 Dismantling, fabrication & erection of condensate box of Evaporator bodies. 5.3 1 Rs………….Each Box
196 5.31 Dismantling, fabrication & fitting of new down take of quad / Old or New semikestner, etc. 5.31 1 Rs……………….Each
197 5.32 Dismantling fabrication and erection of new recovery tower of juice sulphiter/ Syrup.Sulphiter. 5.32 1 Rs……………….Each
198 5.33 Replacement of muddy juice tank fitted at vacuum filter with new plates & with all connections. 5.33 1 Rs……………….Each
199 5.34 Repairing of Umbrella of Quad. 5.34 1 Rs……………….Each
200 5.35 Dismantling, fabrication & erection of worn out Umbrella of Quad. 5.35 1 Rs………….L.S Each
201 5.36 Dismantling, fabrication & erection of External catcher/ saveall of Quad old bodies 5.36 1 Rs………………Each
202 5.37 Dismantling, fabrication & erection of External catcher/ saveall of Quad Uttam set. 5.37 1 Rs………………Each
203 5.38 Replacement of worn-out top conical portion of Quad with proper strengthening with associated machinery 5.38 1 Rs………………..L.S.
204 5.39 Dismantling, Repair, & erection of worn out Juice heater partition plate with ribs. 5.39 1 Rs. ………Each side
205 5.4 Dismantling of worn out arms and shell ( out side & inside) of juice sulphiter drum, fabrication & erection with satisfactory trial. 5.4 1 Rs…………………L.S.
206 5.41 Dismantling of worn out central drum & bed of juice sulphiter, fabrication & erection with satisfactory trial. 5.41 1 Rs…………………L.S.
207 5.42 To replace worn out clear juice box / mud discharge box with valve of new door followed by satisfactory trial 5.42 1 Rs…………Each box
208 5.43 Dismantling of wear out juice heater cover, fitting of new 12 mm thick MS plate by welding & bolting including repair of lever & erection of cover followed by satisfactory water trial. 5.43 1 Rs………...Each cover
209 5.44 To replace worn out mud scrapper plate with support & vacuum filter fitting to be done. 5.44 1 Rs…………Each filter
210 5.45 To replace worn out juice baffle plate / partition plate of dorr compartment 5.45 1 Rs………Each comp.
211 5.46 Fabrication & erection of new sulphur furnace after dismantling of old furnace with successful water/Air trial. 5.46 1 Rs………..L.S. each
212 5.47 Major repair of lime slaker with proper alignment & trial 5.47 1 Rs……………L.S.
213 5.48 Dismantling of old worn-out vapour cell 950 sq mtr. H.S. calendria after providing proper support arrangement and erection of newly supplied calendria with proper welding & connections etc. and to give successful vaccum/ water tank 5.48 1 Rs……………L.S.
214 5.49 Dismantaling & erection of New QuadVLJH including all connection with successful trial. 5.49 1 Each
215 5.5 Dismantling & erection of Quad 440 sq. mtr. calendria include all connection with successful trail 5.5 1 Each
216 6 Centrifugal House 6
217 6.01 To replace worn-out molasses Jacket of B & C Continuous Centrifugal Machine followed by proper Trial. 6.01 1 Each
218 6.02 To Replace worn-out “A” Centrifugal Machine Molasses Chute/housing chute followed by satisfactory trial. 6.02 1 Each
219 6.03 To replace worn out half portion of horizontal sugar melter in Centrifugal house with steam & juice connection followed by satisfactory trial. 6.03 1 Each
220 6.04 Dismantling of worn out B & C centrifugal m/c, Magma mixture shaft, fabrication of complete new shaft with 12mm plate, fitting of arms etc. with successful trial. 6.04 1 Rs…………….LS
221 6.05 Replacement of damaged portion of hopper 6.05 1 Rs / ------------Running metres
222 6.06 Broken shaft of crystallizer to be made correct or replaced by new one and their proper alignment to be done. 6.06 1 Rs…………….LS Each
223 6.07 Fabrication & fitting of damper in gutter. 6.07 1 Rs…………….LS Each
224 6.08 Replacement of wornout bushes & arms of sugar melter with satisfactory trial. 6.08 1 Each
225 6.09 Replacement of cooling jackt pipe of C & B mono crystallizer. 6.09 1 Rs…………….Each Pipe.
226 6.1 Replacement of wornout suction mouth piece of MF-50x50/40x40 injection & spray pump. 6.1 1 Rs…………….LS Each
227 6.11 C- Pugmill, Mugma mixer, broken shaft to be takenout and to be repaired/ to be changed new, bush, support & Aram to be fitted a satisfactory trial. 6.11 1 Rs…………….LS Each
228 6.12 Repairing of B & C massecuite mono Cryst. Leakage coil with Hydraulic testing & successful trial. 6.12 1 Rs……………Each Coil
229 6.13 B & C Mamga Mixer, Pugmill worn-out broken Shell to be replaced, work to be completed with satisfactory trial. 6.13 1 Rs…………...Per Mtr.2
230 6.14 Dis. Of worn-out B & C magma mixer shaft, fab.& erection of the shaft with 12mm M.S. Plate, fitting and successful trial. 6.14 1 Rs…………….LS Each
231 6.15 Replacement of worn-out juice ring of 1350 KT C/F Machine. 6.15 1 Rs…………….LS Each
232 6.16 Dis., Fab. & Erection of E.T.P. aerator. 6.16 1 Rs…………….LS Each
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail