Carrying Out Hot Tapping And Stoppling Works For 12 . 75In Hbpl And 18In Phbpl ( M/L And L/L Sections ) At Two ( 02 ) Locations I . E . Phbpl Ch 482 . 5 Km And 483 Km Near Hathidah , Bihar , Hot-Tapping Works On Mainline Of Specified Line Size With Double Stopple In Existing Mainline & Loopline With Out Bypass Line . Mobilization Of Equipments , Hot Tapping , Stopple Machine , Sandwich Valves , Welding Machine , Split Tee , Consumables , Cutter Housing , Stopple Housing , Stopple Head , Stopple Cutter , Pilot Drill , Cutter Holder , Lock O-Ring Plus Plugs , Lor/ Lor Plus Plug Holder , Required Skilled , Semiskilled , Unskilled Manpower , Includung Supply And Delivery Of Hot Tap & Line Stopple Fittings Alongwith Split Tee , Line Stopple Plug With Scarfed Nipple / Lock O-Ring Plus Plugs , Hot Tap Bypass Fitting , Hot Tap Plug With Scarfed Nipple/Lock O-Ring , Buna N Sealing Elements , Pressure Equalization Fittings , Lock O-Ring Plus Plugs , Sealing Elements , Guide Bar , Blind Flanges , Other Tools , Fixtures Of Required Pressure Rating For 2 Nos . Hot Tap , All Accessories , Gaskets , Fasteners Etc . Required To Complete The Job , Cleaning And Removal Of The Coating If Required , Installation Of The Cutter Housing , Carrying Out Hot Tapping , Stoppling , Welding , Radiography Of Weld Joint Etc . Providing All Assistance For Hot Tapping , N2 Testing , Insertion Of The Stopple Plug And Blocking Flow In The Pipeline Section , Istallation Of Gas Bags , Installation Of Lor Plus Plug , Testing , Air Bleeding And Filling The Section With Product , Clearing The Area , Machines , Tools & Tackles Etc . , Completing The Work In All Respect With All Materials , Consumables , Tools , Tackles , Labour Etc . To Restore Normal Operation In Line With Specification Of Hot Tapping Given Including All Material Complete Under Close Supervision And As Per The Direction Of The Site-Engineer / Engineer-In-Charge . The Rates Are Inclusive Of All Manpower , Equipent , Tools & Tackles , Consumable Etc Required To Complete The Job As Per Scope Of Work . The Rates Are Exclusive Of Cold Cutting Of Mainline & Hookup Work Which Are Included In The Scope Of Mainline Laying Contractor As Per Scope Of Work . , 12 . 75 600# ( 2 Different Sections ) , Hot-Tapping Works On Mainline Of Specified Line Size With Double Stopple In Existing Mainline & Loopline With Out Bypass Line . Mobilization Of Equipments , Hot Tapping , Stopple Machine , Sandwich Valves , Welding Machine , Split Tee , Consumables , Cutter Housing , Stopple Housing , Stopple Head , Stopple Cutter , Pilot Drill , Cutter Holder , Lock O-Ring Plus Plugs , Lor/ Lor Plus Plug Holder , Required Skilled , Semiskilled , Unskilled Manpower , Includung Supply And Delivery Of Hot Tap & Line Stopple Fittings Alongwith Split Tee , Line Stopple Plug With Scarfed Nipple / Lock O-Ring Plus Plugs , Hot Tap Bypass Fitting , Hot Tap Plug With Scarfed Nipple/Lock O-Ring , Buna N Sealing Elements , Pressure Equalization Fittings , Lock O-Ring Plus Plugs , Sealing Elements , Guide Bar , Blind Flanges , Other Tools , Fixtures Of Required Pressure Rating For 2 Nos . Hot Tap , All Accessories , Gaskets , Fasteners Etc . Required To Complete The Job , Cleaning And Removal Of The Coating If Required , Installation Of The Cutter Housing , Carrying Out Hot Tapping , Stoppling , Welding , Radiography Of Weld Joint Etc . Providing All Assistance For Hot Tapping , N2 Testing , Insertion Of The Stopple Plug And Blocking Flow In The Pipeline Section , Istallation Of Gas Bags , Installation Of Lor Plus Plug , Testing , Air Bleeding And Filling The Section With Product , Clearing The Area , Machines , Tools & Tackles Etc . , Completing The Work In All Respect With All Materials , Consumables , Tools , Tackles , Labour Etc . To Restore Normal Operation In Line With Specification Of Hot Tapping Given Including All Material Complete Under Close Supervision And As Per The Direction Of The Site-Engineer / Engineer-In-Charge . The Rates Are Inclusive Of All Manpower , Equipent , Tools & Tackles , Consumable Etc Required To Complete The Job As Per Scope Of Work . The Rates Are Exclusive Of Cold Cutting Of Mainline & Hookup Work Which Are Included In The Scope Of Mainline Laying Contractor As Per Scope Of Work . , 18 ( M/L+L/L ) 600# ( 4 Different Sections )