| 1 | 1 | Dismentaling of existing & damaged inter locking including all complete. | BI01010001010000000000000515BI0100001112 | 769 | M² |
|---|
| 2 | 2 | Dismentaling of brick work with cement mortar etc. all complete. | BI01010001010000000000000515BI0100001113 | 3.75 | M³ |
|---|
| 3 | 3 | E/W in cutting or filling ordinary soil 1.5m lift & 50m lead including cartage earth upto 5Km. at site etc. all complete. | BI01010001010000000000000515BI0100001114 | 403.73 | M³ |
|---|
| 4 | 4 | E/W in excavation in foundation ordinary soil 1.5m lift & 30m lead including all complete. | BI01010001010000000000000515BI0100001115 | 46.89 | M³ |
|---|
| 5 | 5 | Providing Cement concrete 1:5:10 Cement, Fine Sand & 40mm gauge brick ballast all complete. | BI01010001010000000000000515BI0100001116 | 12.5 | M³ |
|---|
| 6 | 6 | M-150 class B/W 1:4 cement, c/sand, mortar in foundation and plinth including supply of all materials, labour T&P etc. complete. | BI01010001010000000000000515BI0100001117 | 36.47 | M³ |
|---|
| 7 | 7 | 12mm thick plaster in 1:4 cement f/sand mortar including all complete. | BI01010001010000000000000515BI0100001118 | 161.82 | M² |
|---|
| 8 | 8 | S/S of 22.4-53mm gauge stone ballast Shankargarh including all complete. | BI01010001010000000000000515BI0100001119 | 76.9 | M³ |
|---|
| 9 | 9 | Supply & stacking of stone dust etc all complete. | BI01010001010000000000000515BI0100001120 | 15.38 | M³ |
|---|
| 10 | 10 | Consolidation of stone ballast 22.4-53mm gauge by road roller including hire & fuel charges of road roller etc complete. | BI01010001010000000000000515BI0100001121 | 76.9 | M³ |
|---|
| 11 | 11 | Water allowance to be allowed between 15 Nov. to 31 May all complete. | BI01010001010000000000000515BI0100001122 | 76.9 | M³ |
|---|
| 12 | 12 | Providing & fixing of 80mm thick rubber moulded reflectiv zig-zag inter locking tiles preparation of base with sand including cost of all materials labour, T&P etc. all complete. Gray | BI01010001010000000000000515BI0100001123 | 384.5 | M² |
|---|
| 13 | 13 | Red | BI01010001010000000000000515BI0100001124 | 384.5 | M² |
|---|
| 14 | 14 | R.C.C. 1:2:4 cement, C.Sand and approved stone grit excluding M.Steel for slab. | BI01010001010000000000000515BI0100001125 | 2.16 | M³ |
|---|
| 15 | 15 | Mild steel for rainforcement in R.C.C. work. | BI01010001010000000000000515BI0100001126 | 1.7 | Qtl. |
|---|
| 16 | 16 | Providing plain cement and concrete 1:2:4 cement, coarse sand with S/B all complete. | BI01010001010000000000000515BI0100001127 | 3.62 | M³ |
|---|
| 17 | 17 | Disposal of earth/malwa for side upt to 1Km. Distance etc. all comp. | BI01010001010000000000000515BI0100001128 | 61.52 | M³ |
|---|
| 18 | 18 | S/F of sign board with BG stone including etc all complete. | BI01010001010000000000000515BI0100001129 | 1 | No. |
|---|
| 19 | 19 | Deduct cost of old materials (B. Bats) | BI01010001010000000000000515BI0100001130 | 3.75 | M³ |
|---|