| 1 | Providingandconstructing75mm.thickModified PenetractionMacadam(MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone layersmetal30% crusherbrokenmetal+70%Handbrokenmetal(BybreakingRubble obtainedby blasting) , heating andspraying thebitumenof specifiedgrade @2Kilogram/ Square Metre , spreading 12mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506etc.complete,including applying tackcoatof specifiedgrade ofbitumenatthe rate of 0.30KilogramSquare Metre. on existing bitumen surface. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 2 | Providingandconstructing50mm.thick Modified PenetrationMacadam(MPM)road surfaceincluding allmaterials,preparingthe existingroadsurface,spreading 40mm.stone layersmetal30% crusherbrokenmetal+70%Handbrokenmetal(BybreakingRubble obtained by blasting) , heating and spraying the bitumen of specified grade @ 1.75Kilogram/ Square Metre, spreading 12mm.size chips compacting with Static roller having weight 8 to 10 MT. to achive the desired degree of compactionas per TechnicalSpecificationClause 506 etc.complete,includingapplyingtackcoatofbitumen0fspecifiedgradeattherateof 0.30KilogramSquare Metre.(on existing bitumen surface.) |
| 3 | ProvidingandapplyingtackcoatonthepreparedsurfaceheatingbyfamesinBoilerand spraying bitumen withsprayer on Dry / Hungry B.T. surface 3 Kilogram/10 Square Metre. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 4 | Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rollingtoachievethedesiredcompactionbutexcludingprime/tackandSealcoat.For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 5 | Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materialsandbitumenofspecifiedgrade preparingexistingroadsurface,heatingand applying bitumen @ 0.98 KilogramSquare Metre. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 6 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. |
| 7 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete |
| 8 | Compactingthehardmurumsidewidthsincludinglayinginlayersoneachsidewithvibratory roller including artificial watering etc. complete. |
| 9 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff asdirected all sorts of soils. |
| 10 | Providing and fixing board displaying information, such as \"Name of work, Tender cost, Name of Contractor, Work completion and liability period etc\", having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angleof size 35 x 35 x 3 mm frame with properly cross braced M.S.angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including,excavation, refilling, transportation, and labour etc complete.Spec. No. As directed by Engineer in Charge |
| 11 | Charges for Testing of Material in Vigilance Quality Control laboratory etc Complete.For Metal Water Absorption,Specific gravity,Impact value |
| 12 | Charges for Testing of Material in Vigilance Quality Control laboratory etc Complete.For Metal & SandSieve Analysis |
| 13 | Charges for Testing of Material in Vigilance Quality Control laboratory etc Complete.For Murum Liquid Limit & Plastic Limit |
| 14 | Charges for Testing of Material in Vigilance Quality Control laboratory etc Complete For Bitumen - Penetration etc |
| 15 | Royalty Charges for Murum,Soil 60 mm /40 mm metal (Hand Broken) etc. |