Construction Of Boundary Wall In Rwh Compound Situated At Textile Center Scheme Pilkhuwa
Tender Value
9.35 Lakhs
Estimated cost
Bid Submission
29 Jun 2021
0 days left
EMD
47000
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Hapur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Boundary wall In Rwh Compound Situated At Textile Center Scheme Pilkhuwa
BOQ
| Name of Work: Construction of Boundarywall in RWH Compound Situated at Textile Center Scheme Pilkhuwa | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | PART ( A) :-- ROAD WORK | BI01010001010000000000000515BI0100001112 | ||
| 2 | 2 | Excavation in Foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m and lead upto 30m. and including filling watering and ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in- charge upto a distance of 30m from the foundation trenches. | BI01010001010000000000000515BI0100001113 | 67 | Cum |
| 3 | 3 | Concrete with 4cm. gauge brick ballast, fine sand of 1.25 FM & cement in the proportion 12:6:1 in foundation & under floors including supply of all materials labour T&P etc. required for\nproper completion of the work. | BI01010001010000000000000515BI0100001114 | 7.4 | Cum |
| 4 | 4 | Cement concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials , labour, tools & plants etcc required for proper completion of the work.In bedding of RCC\npipes,including cost of form work in the trenches | BI01010001010000000000000515BI0100001115 | 4 | cum |
| 5 | 5 | RCC work with cement, approved Coarse sand and 20mm stone grit in proportion of 1:1.5:3 in raft foundation and footings excluding supply of reinforcement and its bending but including its fixing and binding the same with 24\nB.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc. required for proper completion of the work, including cost\nof binding wire. | BI01010001010000000000000515BI0100001116 | 12.25 | Cum |
| 6 | 6 | As in item no. 4 above but in R.C.C column in proportion of\n1:1.5:3 (S.I. No. 289) | BI01010001010000000000000515BI0100001117 | 4 | Cum |
| 7 | 7 | As in item no. 4 above but in beam having span upto 6.0m. | BI01010001010000000000000515BI0100001118 | 7 | Cum |
| 8 | 8 | M-150 Brick work in 1:4 ( 1cement : 4 coarse sand) in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. | BI01010001010000000000000515BI0100001119 | 31 | Cum |
| 9 | 9 | M.S (tor steel or plain ) in work such as RCC or RB work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authories overlaping shall be measured and including cost of binding wire. | BI01010001010000000000000515BI0100001120 | 28 | Qtl. |
| 10 | 10 | M-150 brick work in 1:4 cement and coarse sand of 1.25 F.M.mortar in superstruture including necesssary thickness of brick as reqruired cutting & moulding of brick as equried thickness of walls not to be less than one brick including supply of all materieals labour tools& plants etc. reqruired for\nproper completion of the work. | BI01010001010000000000000515BI0100001121 | 54.1 | Cum |
| 11 | 11 | 12mm thick plaster with cement and coarse sand in 1:4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc.\nrequired for proper completion of the work. | BI01010001010000000000000515BI0100001122 | 472 | Sqm |
| 12 | 12 | Providing and fixing of wall putty of two coat…….work | BI01010001010000000000000515BI0100001123 | 472 | Sqm |
| 13 | 13 | Finishing walls with Acrylic Smooth exterior paint of required shade :13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer\napplied @ 2.20 kg/10 sqm) | BI01010001010000000000000515BI0100001124 | 472 | Sqm |
| 14 | 14 | M.S or iron work of small size and section such as holding down bolts, hold fast tie rods, grating etc. wrought to required from including supply of steel and its wastage including cost of bolts, nuts it required for and welding, grinding and making holes as required of completion of the work. (Based on S.I\nNo. 502) | BI01010001010000000000000515BI0100001125 | 3 | Qtl. |
| 15 | 15 | Painting or varnishing work in small areas or new wood/steel work with one coat ready mixed priming paint and one coat or approved superior quality ready mixed paint or varnish including supply of all materials, labour. T&P etc. required for proper completion of the work. Paint to be used should\nconfirm the ISI.No.103-1950. | BI01010001010000000000000515BI0100001126 | 9 | Sqm |
AI Tender Summary
Tender Timeline
Jun 19, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedJun 29, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJun 29, 2021
Bid Opening Date
Technical bids will be opened and evaluated.