| 1 | 1 | FOOTBALL TURF | BI01010001010000000000000515BI0100001113 | | |
|---|
| 2 | 1.01 | 16.1 : Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. | BI01010001010000000000000515BI0100001114 | 7700 | sqm |
|---|
| 3 | 1.02 | od282397/2020_2021 : Providing and fixing PVC pipes with 5 mm dia perforations, minimum 125 perforations per running metre, in trenches at required slope, as per specifications etc complete including the cost of all materials, labour etc. and as directed by the Engineer-in-charge.Care should be taken while laying so that the perforations shall be along the bottom side of the pipe. The rate includes cost of all materials, ,labour charges for trenching carriage of surplus earth to a lead of 50m etc complete. including jointing of pipes with one step PVC solvent cement etc complete as per direction of Engineer-in-Charge 110 mm dia 6 Kgf/cm2. | BI01010001010000000000000515BI0100001115 | 726 | metre |
|---|
| 4 | 1.03 | od282399/2020_2021 : Providing ,Laying, spreading and compacting stone aggregate of specified size 20mm downgraded metal as filter media around the drainage pipes in the sides of trench without damaging the drainage pipes as per the directions of Engineer-in-charge. Rate inclusive of all materials,transportation and labour charges complete.The work has to be executed as per detailed specifications, and or as approved by Engineer-in charge. | BI01010001010000000000000515BI0100001116 | 94.811 | cum |
|---|
| 5 | 1.04 | od282405/2020_2021 : Providing ,laying and spreading of compacted fill with 20mm metal (Coarse Rubble Granite Stone) to form a contour and elevations in uniform thickness,rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, as per Drawings.Rate inclusive of all materials, transportation and labour charges complete.The work has to be completed as per detailed specifications and or as approved by Engineer-in-charge | BI01010001010000000000000515BI0100001117 | 346.5 | cum |
|---|
| 6 | 1.05 | od282408/2020_2021 : Providing ,laying and spreading of compacted fill with 10mm metal (Coarse Rubble Granite Stone) to form a contour and elevations in uniform thickness,rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, as per Drawings.Rate inclusive of all materials, transportation and labour charges complete.The work has to be completed as per detailed specifications and or as approved by Engineer-in-charge | BI01010001010000000000000515BI0100001118 | 192.5 | cum |
|---|
| 7 | 1.06 | od282409/2020_2021 : Providing and installing root zone by mixing good earth and medium fine sand of U.S.G.A specification in the ratio 2:1 to a minimum standard thickness of 125mm and manure mix layer consisting of biofibre as per manufacture specification . Mixing the above to ensure a homogenous mix and accurate mix of components. The earth ,sand and manure mix shall be compacted repeatedly by rolling to the grade & camber required and irrigating as required. The cost shall include applying pre mergence herbicide, pre plant fertilizers as per manufacture specification to the entire area, cost of all labour, material lead etc complete as directed by the Engineer in charge. Necessary deductions shall be applied if the department earth is used for root zone preparation. | BI01010001010000000000000515BI0100001119 | 7700 | sqm |
|---|
| 8 | 1.07 | od282411/2020_2021 : Deduct for using Departmentally supplied earth instead of contractor own earth for preparation of Grass root zone\n (please enter the rate but it shall be deducted from total value at time of Evaluation ie negative Quantity) | BI01010001010000000000000515BI0100001120 | 1299.38 | cum |
|---|
| 9 | 1.08 | od282416/2020_2021 : Providing & planting bermuda grass in rows of 5cm apart in both direction in proper level and camber after fine dressing the prepared ground and including watering and maintenance of the lawn for 180 days or more till the grass forms a thick lawn, free from weeds and fit for mowing and disposal of rubbish as directed. The rate including anti termite treatment of lawn area through premise 30.50% I P. one liter premise diluted in 499 liters water and applying solution @ 1.00 litre solution per sqm lawn or bed area.(two application) i/c cost of chemical). Final 20 % of total value of this item shall be paid only after the lawn makes proper thick turf after the cutting successfully, after the maintenance period is over. | BI01010001010000000000000515BI0100001121 | 7700 | sqm |
|---|