}

Procurement Of Solar Power Supply System Procurement Of Solar Power Supply System , Supply Installation Testing & Commissioningof Solar Powersystem With Battery Back-Up , Solar Panel System For Golaghat TerminalLsolar Power Supply System -5 Kva, 415 V, A, Golaghat-Assam

Assam Gas Company Limited has published Procurement Of Solar Power Supply System Procurement Of Solar Power Supply System , Supply Installation Testing & Commissioningof Solar Powersystem With Battery Back-Up , Solar Panel System For Golaghat TerminalLsolar Power Supply System -5 Kva, 415 V, A. Submission Date for this Tender is 03-07-2021. Electrical Maintenance Tenders in Golaghat Assam. Bidders can get complete Tender details and download the document.




Tender Notice

28246090
Procurement Of Solar Power Supply System Procurement Of Solar Power Supply System , Supply Installation Testing & Commissioningof Solar Powersystem With Battery Back-Up , Solar Panel System For Golaghat TerminalLsolar Power Supply System -5 Kva, 415 V, A
Open Tender
Indian
Assam
Golaghat
03-07-2021

Tender Details

Procurement Of Solar Power Supply System Procurement Of Solar Power Supply System , Supply Installation Testing & Commissioningof Solar Powersystem With Battery Back-Up , Solar Panel System For Golaghat TerminalLsolar Power Supply System -5 Kva, 415 V, Ac, 3 Ph, N, (Solar Panels Have Redundancy Parallel Redundant 2 Nosx 100 % Rating& Charge Controller Have 2 Nos X 200% Ratings) Along With Additional Battery Charger & Nickel Cadmium Battery Bank Withbattery Rack(Suitable For Solar Charging, As Per Specification And Datasheet). Batterybank Suitable For Sufficient Backup Time At Full Load Shall Be Provided For Meeting Critical Loads That Cannot Withstand Even A Momentary Interruption In Voltage. Battery Banks -(2Nos. X 50% Ni-Cd Battery Bank - Total 10 Hours Battery Backup For 4 Kw Continious Load & 15 Minute Back-Up For 4 Kw Intermittent Load ):Delivery Of Complete Solar Power System Shall Be At Golaghatterminal ,Agcl.Refer Sld -1009-Gg-El- Sld -4001 _0.Solar Power System Shall Be Complete In All Respect.& Systems Functional Responsibility Shall Be In Vendors Scope.Construction Of Battery Room (Building ) Including Complete Civil Work And Electrical Work As Per Dwg-1009-Cs -Arc-6003 Rev -C1.Shall Be In Contractors Scope. , Solar Panel System For Uriumghat TerminalSolar Power Supply System -5 Kva, 415 V, Ac, 3 Ph, N, (Solar Panels Have Redundancy Parallel Redundant 2 Nosx 100 % Rating& Charge Controller Have 2 Nos X 200% Ratings) Along With Additional Battery Charger & Nickel Cadmium Battery Bank Withbattery Rack(Suitable For Solar Charging, As Per Specification And Datasheet). Batterybank Suitable For Sufficient Backup Time At Full Load Shall Be Provided For Meeting Critical Loads That Cannot Withstand Even A Momentary Interruption In Voltage. Battery Banks -(2Nos. X 50% Ni-Cd Battery Bank - Total 10 Hours Battery Backup For 4 Kw Continious Load & 15 Minute Back-Up For 4 Kw Intermittent Load):Delivery Of Complete Solar Power System Shall Be At Urimghat Terminal ,Agcl.Refer Sld -1009-Ur-El- Sld -4001 _0.Solar Power System Shall Be Complete In All Respect.& Systems Functional Responsibility Shall Be In Vendors Scope.Construction Of Battery Room (Building ) Including Complete Civil Work And Electrical Work As Per Dwg-1009-Cs -Arc-6003 Rev -C1.Shall Be In Contractors Scope , Solar Panel System For Numaligarh TerminalSolar Power Supply System -5 Kva, 415 V, Ac, 3 Ph, N, (Solar Panels Have Redundancy Parallel Redundant 2 Nosx 100 % Rating& Charge Controller Have 2 Nos X 200% Ratings) Along With Additional Battery Charger & Nickel Cadmium Battery Bank With Battery Rack(Suitable For Solar Charging, As Per Specification And Datasheet). Batterybank Suitable For Sufficient Backup Time At Full Load Shall Be Provided For Meeting Critical Loads That Cannot Withstand Even A Momentary Interruption In Voltage. Battery Banks -(2Nos. X 50% Ni-Cd Battery Bank - Total10 Hours Battery Backup For 4 Kw Continious Load & 15 Minute Back-Up For 4 Kw Intermittent Load):Delivery Of Complete Solar Power System Shall Be At Naumaligharterminal ,Agcl.Refer Sld -1009-Nu-El- Sld -4001 _0.Solar Power System Shall Be Complete In All Respect.& Systems Functional Responsibility Shall Be In Vendors Scope.Construction Of Battery Room (Building ) Including Complete Civil Work And Electrical Work As Per Dwg-1009-Cs -Arc-6003 Rev -C1.Shall Be In Contractors Scope , Solar Panel System For Halmiramukh TerminalSolar Power Supply System -5 Kva, 415 V, Ac, 3 Ph, N, (Solar Panels Have Redundancy Parallel Redundant 2 Nosx 100 % Rating& Charge Controller Have 2 Nos X 200% Ratings) Along With Additional Battery Charger & Nickel Cadmium Battery Bank With Battery Rack(Suitable For Solar Charging, As Per Specification And Datasheet). Batterybank Suitable For Sufficient Backup Time At Full Load Shall Be Provided For Meeting Critical Loads That Cannot Withstand Even A Momentary Interruption In Voltage. Battery Banks -(2Nos. X 50% Ni-Cd Battery Bank - Total 10 Hours Battery Backup For 4 Kw Continious Load & 15 Minute Back-Up For 3 Kw Intermittent Load):Delivery Of Complete Solarpower System Shall Be At Halmiramukhterminal ,Agcl.Refer Sld -1009-Ha-El- Sld -4001 _0.Solar Power System Shall Be Complete In All Respect.& Systems Functional Responsibility Shall Be In Vendors Scope.Construction Of Battery Room (Building ) Including Complete Civil Work And Electrical Work As Per Dwg-1009-Cs -Arc-6003 Rev -C1.Shall Be In Contractors Scope , Solar Panel System For Thoramukh TerminalSolar Power Supply System -5 Kva, 415 V, Ac, 3 Ph, N, (Solar Panels Have Redundancy Parallel Redundant 2 Nosx 100 % Rating& Charge Controller Have 2 Nos X 200% Ratings) Along With Additional Battery Charger & Nickel Cadmium Battery Bank With Battery Rack(Suitable For Solar Charging, As Per Specification And Datasheet). Batterybank Suitable For Sufficient Backup Time At Full Load Shall Be Provided For Meeting Critical Loads That Cannot Withstand Even A Momentary Interruption In Voltage. Battery Banks -(2Nos. X 50% Ni-Cd Battery Bank - Total10 Hours Battery Backupfor 4 Kw Continious Load & 15 Minute Back-Up For 3 Kw Intermittent Load):Delivery Of Complete Solarpower System Shall Beat Thoramukhterminal ,Agcl.Refer Sld -1009-Th-El- Sld -4001 _0.Solar Power System Shall Be Complete In All Respect.& Systems Functional Responsibility Shall Be In Vendors Scope.Construction Of Battery Room (Building ) Including Complete Civil Work And Electrical Work As Per Dwg-1009-Cs -Arc-6003 Rev -C1.Shall Be In Contractors Scope , Solar Panel System For Sectionalizing Valve Station (Between Thoramukh And Numaligarh)Solar Power Supply System -3 Kva, 415 V, Ac, 3 Ph, N, (Solar Panels Have Redundancy- Parallel Redundant 2 Nosx 100 % Rating& Charge Controller Have 2 Nos X 200% Ratings) Along With Additional Battery Charger & Nickel Cadmium Battery Bank With Battery Rack(Suitable For Solar Charging, As Per Specification And Datasheet). Batterybank Suitable For Sufficient Backup Time At Full Load Shall Be Provided For Meeting Critical Loads That Cannot Withstand Even A Momentary Interruption In Voltage. Battery Banks -(2Nos. X 50% Ni-Cd Battery Bank For Total 10 Hours Battery Backup For 3 Kw Continious Load & 15 Minute Back-Up For 2 Kw Intermittent Load) .Delivery Of Complete Solarpower System Shall Be At Sv-1(Between Thoramukh And Numalighar) ,Agcl .Refer Sld -1009-Sv-1-El- Sld -4001 _0. Solar Power System Shall Be Complete In All Respect.& Systems Functional Responsibility Shall Be In Vendors Scope.Construction Of Battery Room (Building ) Including Complete Civil Work And Electrical Work As Per Dwg-1009-Cs -Arc-6003 Rev -C1.Shall Be In Contractors Scope. , Solar Panel System For Sectionalizing Valve Station (Between Uriumghat And Golaghat) Solar Power Supply System -3 Kva, 415 V, Ac, 3 Ph, N, (Solar Panels Have Redundancy- Parallel Redundant 2 Nosx 100 % Rating& Charge Controller Have 2 Nos X 200% Ratings) Along With Additional Battery Charger & Nickel Cadmium Battery Bank Withbattery Rack(Suitable For Solar Charging, As Per Specification And Datasheet). Batterybank Suitable For Sufficient Backup Time At Full Load Shall Be Provided For Meeting Critical Loads That Cannot Withstand Even A Momentary Interruption In Voltage. Battery Banks -(2Nos. X 50% Ni-Cd Battery Bank For Total10 Hours Battery Backup For 3 Kw Continious Load & 15 Minute Back-Up For 2 Kw Intermittent Load) .Delivery Of Complete Solarpower System Shall Beat Sv-2 (Between Urimghat And Golaghat ) ,Agclrefer Sld -1009-Sv-2-El- Sld -4001 _0.Solar Power System Shall Be Complete In All Respect.& Systems Functional Responsibility Shall Be In Vendors Scope.Construction Of Battery Room (Building ) Including Complete Civil Work And Electrical Work As Per Dwg-1009-Cs -Arc-6003 Rev -C1.Shall Be In Contractors Scope. , Supply And Installation Of Battery Set For Ups , Battery Setfor Golaghat Terminal2 Nos. X 50% Nickel Cadmium Battery Bank Suitable For Total 6Hours Battery Back-Up For 2 X 100 % 5 Kva Ups System Along With Battery Rack (For 2 X 100% 5 Kva Ups).Delivery Of Completebatteryset Shall Be At Golaghatterminal , Battery Set Forgolaghat Office2 Nos. X 50% Nickel Cadmium Battery Bank Suitable For Total 6Hours Battery Back-Up For 2 X 100 % 5 Kva Ups System Along With Battery Rack (For 2 X 100% 5 Kva Ups).Delivery Of Completebatteryset Shall Be At Golaghatoffice. , Battery Setfor Uriumghat Terminal 2 Nos. X 50% Nickel Cadmium Battery Bank Suitable For 6Hours Battery Back-Up For 2X 100 % 5 Kva Ups System Along With Battery Rack (For 2 X 100% 5 Kva Ups).Delivery Of Complete Battery Set Shall Be At Urimghat Terminal. , Battery Set For Numaligarh Terminal 2 Nos. X 50% Nickel Cadmium Battery Bank Suitable For Total 6Hours Battery Back-Up For 2 X 100 %5 Kva Ups System Along With Battery Rack (For 2 X 100% 5 Kva Ups).Delivery Of Complete Battery Set Shall Be At Naumaligharterminal. , Battery Set For Halmiramukh Terminal 2 Nos. X 50% Nickel Cadmium Battery Bank Suitable For Total 6Hours Battery Back-Up For 2 X100 % 5 Kva Ups System Along With Battery Rack (For 2 X 100% 5 Kva Ups).Delivery Of Complete Battery Setshall Be At Halmiramukhterminal. , Battery Set For Thoramukh Terminal 2 Nos. X 50% Nickel Cadmium Battery Bank Suitable For Total 6Hours Battery Back-Up For 2X 100 % 5 Kva Ups System Along With Battery Rack (For 2 X 100% 5 Kva Ups).Delivery Of Complete Battery Set Shall Beat Thoramukhterminal. , Battery Set For Nambar Station2 Nos. X 50% Nickel Cadmium Battery Bank Suitable For Total 6Hours Battery Back-Up For 2 X 100 % 5 Kva Ups System Along With Battery Rack (For 2 X 100% 5 Kva Ups).Delivery Of Complete Battery Set Shall Beat Namborterminal. , Battery Set For Khoraghat Station2 Nos. X 50% Nickel Cadmium Battery Bank Suitable For 6Hours Battery Back-Up For 2 X 100 %5 Kva Ups System Along With Battery Rack (For 2 X 100% 5 Kva Ups).Delivery Of Complete Battery Set Shall Beat Khoraghatterminal. , Battery Setfor Sectionalizing Valve Station (Between Thoramukh And Numaligarh)2 Nos. X 50% Nickel Cadmium Battery Bank Suitable For Total 6Hours Battery Back-Up For 2X 100 % 3 Kva Ups System Along With Battery Rack (For 2 X 100% 3 Kva Ups).Delivery Of Complete Battery Set Shall Be At Sv-1(Between Thoramukh And Numalighar). , Battery Set For Sectionalizing Valve Station (Between Uriumghat And Golaghat)2 Nos. X 50% Nickel Cadmium Battery Bank Suitable For Total 6Hours Battery Back-Up For 2X 100 % 3 Kva Ups System Along With Battery Rack (For 2 X 100% 3 Kva Ups). Delivery Of Complete Battery Setshall Beat Sv-2 (Between Urimghat And Golaghat ).

Key Value

Document Fees
INR 8000 /-
EMD
INR 800000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail