Supply Of Petroleum Hydrocarbon Solvent.Petroleum Hydrocarbon Solvent.,Petroleum Hydrocarbon Solvent. Specification:- Low Aromatic Grade Solvent 145/205To Is : 1745/2018, (Third Revision) With Additional Requirements Of Icf/Md/Spec.-045, Issue Status-02,
Tender Overview
Project Description
Supply Of Petroleum Hydrocarbon Solvent.Petroleum Hydrocarbon Solvent.,Petroleum Hydrocarbon Solvent. Specification:- Low Aromatic Grade Solvent 145/205To Is : 1745/2018, (Third Revision) With Additional Requirements Of Icf/Md/Spec.-045, Issue Status-02, Rev.-03Dated 14.06.2007 With Rdso Amendment No. 1A (Rev.1.0) As An Additional Requirement. Special Terms &Condition:- (I) Material Shall Be Packed In 20 Ltrs. Metal Containers Confirming To Is:1407/1980 (Second Revision)(Reaffirmed 2016) Or Is: 2552/1989_Amend.1(Third Revision) (Reaffirmed 2018) Grade B-1. (Ii) The GoodsShould Be Dispatched Within 02 Months From The Date Of Manufacturing And Firm Will Give An Undertaking That TheMaterial Supplied Is Not More Than 60 Days Old. (Iii) Suppliers Have To Write On The Container Batch No., Date,Month, Year Of Manufacturing And Also Write The Paint Can Be Used Before 12 Months From The Date OfManufacturing. (Iv) Keeping Properties - Not Less Than One Year From The Date Of Manufacturing.Dy.Cmmamv/Lko Uttar Pradesh 16740.00 LitreDy.Chief Material Haryana 66320.00 Litre
BOQ
| Sl. No. | Item Description |
| 1 | PETROLEUM HYDROCARBON SOLVENT. |
| 2 | PETROLEUM HYDROCARBON SOLVENT. Specification:- Low Aromatic Grade Solvent 145/205to IS : 1745/2018, (Third revision) with additional requirements of ICF/MD/Spec.-045, issue Status-02, Rev.-03dated 14.06.2007 with RDSO amendment no. 1A (Rev.1.0) as an additional requirement. Special terms &condition:- (i) Material shall be packed in 20 Ltrs. metal containers confirming to IS:1407/1980 (Second Revision)(Reaffirmed 2016) OR IS: 2552/1989_amend.1(Third Revision) (Reaffirmed 2018) Grade B-1. (ii) The goodsshould be dispatched within 02 months from the date of manufacturing and firm will give an undertaking that thematerial supplied is not more than 60 days old. (iii) Suppliers have to write on the container Batch No., Date,Month, Year of Manufacturing and also write the paint can be used before 12 months from the date ofmanufacturing. (iv) Keeping Properties - Not less than One Year from the date of manufacturing.Dy.CMMAMV/LKO Uttar Pradesh 16740.00 LitreDy.Chief Material Haryana 66320.00 Litre |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender