Survey, Investigation, Design And Construction Of Piped Water Supply Scheme And Retrofitting Of Piped Water Supply Scheme In Villages- Suswa, Mate (Portitola) And Sarad (Three Villages) Block Kirnapur, Including Construction Of Rcc Oht 100 Kl 12 Mtr. Stag
Tender Overview
Project Description
Survey, Investigation, Design and Construction of Piped Water Supply Scheme and Retrofitting of Piped Water Supply Scheme in Villages- Suswa, Mate (Portitola) and Sarad (Three Villages) Block Kirnapur, Including Construction of RCC OHT 100 KL 12 Mtr. Staging, At Village - Suswa and RCC OHT 100 KL 12 Mtr. Staging At Village - Sarad. Construction of RCC Sumpwell 20 KL At Village - Mate and Sarad .Construction of RCC Sumpwell 30KL At Village - Suswa . Providing, Laying, Jointing & Testing of HDPE Pipe of Risingmain, Distribution Pipeline 100% House Hold Tap Connection & Electric Power Connections at Tubewells & Sumpwell and Fabrication, providing & fixing of typical information board Including Cost of Material and Labour with 90 Days Trialrun/ Comissioning Successfully of Entire Scheme
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 23-Jun-2021 | 1st Corrigendum | Date | 12-Jul-2021 |
BOQ
| Name of Work: Survey, Investigation, Design and Construction of Piped Water Supply Scheme and Retrofitting of Piped Water Supply Scheme in Villages- Suswa, Mate (Portitola) and Sarad (Three Villages) Block Kirnapur, Including Construction of RCC OHT 100 KL 12 Mtr. Staging, At Village - Suswa and RCC OHT 100 KL 12 Mtr. Staging At Village - Sarad. Construction of RCC Sumpwell 20 KL At Village - Mate and Sarad .Construction of RCC Sumpwell 30KL At Village - Suswa . Providing, Laying, Jointing & Testing of HDPE Pipe of Risingmain, Distribution Pipeline 100% House Hold Tap Connection & Electric Power Connections at Tubewells & Sumpwell and Fabrication, providing & fixing of typical information board Including Cost of Material and Labour with 90 Days Trialrun/ Comissioning Successfully of Entire Scheme. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Item Description | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.01 | Survey, Investigation, Design and Construction of Piped Water Supply Scheme and Retrofitting of Piped Water Supply Scheme in Villages- Suswa, Mate (Portitola) and Sarad (Three Villages) Block Kirnapur, Including Construction of RCC OHT 100 KL 12 Mtr. Staging, At Village - Suswa and RCC OHT 100 KL 12 Mtr. Staging At Village - Sarad. Construction of RCC Sumpwell 20 KL At Village - Mate and Sarad .Construction of RCC Sumpwell 30KL At Village - Suswa . Providing, Laying, Jointing & Testing of HDPE Pipe of Risingmain, Distribution Pipeline 100% House Hold Tap Connection & Electric Power Connections at Tubewells & Sumpwell and Fabrication, providing & fixing of typical information board Including Cost of Material and Labour with 90 Days Trialrun/ Comissioning Successfully of Entire Scheme. | BI01010001010000000000000515BI0100001113 | 1 | Job |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender