| 1 | 1 | App. A - Initial work | BI01010001010000000000000515BI0100001113 | | |
|---|
| 2 | 1.01 | od66277/2019_2020/IA : Providing floating plat form of size 12m x 7m on pontoon(as per drawing) in steel work riveted or bolted in built up section etc., trusses and framed work M.S angle, iron plates, tees etc. straightening cutting, fabricating and hosting including applying one coat iron primer for pontoon including cost of materials, labour charges, mobilisation charges, current charges for welding etc. hire for winch, chain, hook etc. and launching in to the river and all other incidental charges including lighting etc. complete for piling in river portion etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001114 | 602.4 | metre |
|---|
| 3 | 2 | App. B-Sub structure- Pile | BI01010001010000000000000515BI0100001115 | | |
|---|
| 4 | 2.01 | 12.22 : Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001116 | 43.02 | MT |
|---|
| 5 | 2.02 | od66275/2019_2020/IA : Bored cast-in-situ M30 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.r|nPile diameter-600 mm r|n etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001117 | 602.4 | metre |
|---|
| 6 | 3 | App C-Boat jetty | BI01010001010000000000000515BI0100001118 | | |
|---|
| 7 | 3.01 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001119 | 28096.5 | kilogram |
|---|
| 8 | 3.02 | od66276/2019_2020/IA : Chipping and removing extra length of RCC piles-Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead etc complete as directed by the departmental Engineer-in-Charge.(as per 15.3 of DSR 2016) | BI01010001010000000000000515BI0100001120 | 10.239 | cum |
|---|
| 9 | 3.03 | 20.6.1.2 : Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc complete as directed by the departmental Engineer-in-Charge.Single pile upto 50 tonne capacityRoutine test | BI01010001010000000000000515BI0100001121 | 1 | per test |
|---|
| 10 | 3.04 | 5.33.1 : Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001122 | 47.093 | cum |
|---|
| 11 | 3.05 | 5.33.2 : Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability etc complete as directed by the departmental Engineer-in-Charge.. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level | BI01010001010000000000000515BI0100001123 | 5.087 | cum |
|---|
| 12 | 3.06 | 5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size) etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001124 | 6.666 | cum |
|---|
| 13 | 3.07 | 5.22A.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001125 | 1292.83 | kg |
|---|
| 14 | 3.08 | 5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001126 | 112.166 | sqm |
|---|
| 15 | 3.09 | 5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001127 | 161.78 | sqm |
|---|
| 16 | 3.1 | 5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001128 | 45.216 | sqm |
|---|
| 17 | 3.11 | 5.23 : Smooth finishing of the exposed surface of RCC work with 6mm thick cement mortar 1:3 ( cement : 3 fine sand) etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001129 | 152.88 | sqm |
|---|
| 18 | 3.12 | 11.20.3 : Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Dark shade pigment using ordinary cement etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001130 | 170.52 | sqm |
|---|
| 19 | 3.13 | od66278/2019_2020/IA : Stone work in plain ashlar in super structure upto floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade:(as per 7.12.1 of DSR)One face dressedBlack Granite stone block etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001131 | 1728 | cud m |
|---|
| 20 | 3.14 | od66279/2019_2020/IA : Providing Granite stone post , 10x10 cm size, 100 cm long hand cut and chisel dressed accurately to line and level for hand rails on walkway fixed bottom and top in RCC beams per Architect's design including the cost of materials , labour charges, conveyance etc. complete but excluding the cost of RCC beams which is to be paid seperately ( specification as per 7.12.1.1 of DSR )- Granite post 4 side dressedOne face dressed Red sand stone etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001132 | 1740 | cud m |
|---|
| 21 | 3.15 | od66280/2019_2020/IA : Providing & fixing on roof, First class superior quality Mangalore Pattern tileofapproved size and as per approved pattern on wooden reepering work including cost ofmaterials,conveyane charges and labour charges etc complete as directed by the departmental Engineer-in-Charge. (based on dsr 12.48) | BI01010001010000000000000515BI0100001133 | 301.2 | sqm |
|---|
| 22 | 3.16 | od66281/2019_2020/IA : Providing & fixing on First quality flat clay tile of approved size and as perapprovedpattern on wooden reepering frame work including cost and conveyance of all materials, labourcharges etc complete as directed by the departmental Engineer-in-Charge. (based on 12.48) | BI01010001010000000000000515BI0100001134 | 301.2 | sqm |
|---|
| 23 | 3.17 | od66282/2019_2020/IA : Providing & laying on roof First class superior quality Mangalore Pattern ridge tileofapproved pattern and make on wooden reepering work complete including cost of materials,conveyanceand all labour charges for fixing. based on 12-49 etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001135 | 60.2 | metre |
|---|
| 24 | 3.18 | 50.9.1.2 : Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length ( hold fast lugs or dash fastener shall be paid for separately) using good quality Pincoda wood etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001136 | 4.514 | cum |
|---|
| 25 | 3.19 | od66283/2019_2020/IA : Supplying and fixing Pingoda wood reapers of size 50x25 mm with Stainlesssteelwire nails including cost and conveyance of materials etc. complete. based on 50-9-14-2 | BI01010001010000000000000515BI0100001137 | 1.432 | cum |
|---|
| 26 | 3.2 | od66284/2019_2020/IA : Providing valleys of 90 cm wide overall in plain G.I / Aluminium sheet fixed withpolymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limper and bitumen washers complete: (spec.code12.5.1)1.60 mm thick with zinc coating not less than 350 gm/ m2 etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001138 | 6.6 | metre |
|---|
| 27 | 3.21 | od66285/2019_2020/IA : Stainless steel work riveted, bolted or welded in built up sections,includingcutting,hoisting, fixing in position all complete using plates, nuts & bolts and other fixtures made ofstainless steel.Labour portion is taken as that of structural steel work item No. 10.2 etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001139 | 511.9 | kg |
|---|
| 28 | 3.22 | 13.52.2 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001140 | 291.31 | sqm |
|---|
| 29 | 3.23 | 13.50.1 : Applying priming coat:With ready mixed pink or Grey primer of approved and manufacture on wood work (hard and soft wood) etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001141 | 455.93 | sqm |
|---|
| 30 | 3.24 | 13.62.1 : Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001142 | 455.93 | sqm |
|---|
| 31 | 3.25 | 9.1.2 : Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately).Sal wood etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001143 | 0.193 | cum |
|---|
| 32 | 3.26 | 13.67.1 : Varnishing with varnish of approved brand and manufacture :Two or more coats of glue sizing with copal varnish over an under coat of flatting varnish etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001144 | 20.654 | sqm |
|---|
| 33 | 3.27 | 13.46.1 : Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001145 | 602.4 | sqm |
|---|
| 34 | 3.28 | od66286/2019_2020/IA : Deepening the river by earth work in excavation by mechanical means (Hydraulic excavator mounted on Barge ) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, all leads and lift at places pointed out by the engineer-in-charge and disposed earth to be leveled and neatly dressed. All kinds of soil etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001146 | 6810 | cum |
|---|
| 35 | 3.29 | 60.64.1 : Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001147 | 75 | metre |
|---|
| 36 | 3.3 | 60.64.4 : Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001148 | 40 | metre |
|---|
| 37 | 3.31 | 60.64.6 : Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150m etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001149 | 10 | each |
|---|
| 38 | 3.32 | od66287/2019_2020/IA : Supplying and fixing old tyre on the fender post to resist the impact of stopping boat (OBSERVED DATA) etc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001150 | 20 | each |
|---|
| 39 | 3.33 | od66288/2019_2020/IA : Providing Cast Iron Bollards with approved drawings and design including cost of all materials, moulding charges , cost of fixtures and all labor chargesetc complete as directed by the departmental Engineer-in-Charge. | BI01010001010000000000000515BI0100001151 | 5 | no |
|---|