Works Contract In Respect Of Yercaud I Section Survey Supply Erection Testing And Replacement Of 22 Kv Acsr 2 . 59 Mm Conductor By 22Kv Ht Abl Cable Of Size 3X50 Sq Mm Phase 1X50 Sq Mm Bare Messenger In Yercaud Feeder In Yercaud I Section
Tender Overview
Project Description
Works Contract In Respect Of Yercaud I Section Survey Supply Erection Testing And Replacement Of 22 Kv Acsr 2 . 59 Mm Conductor By 22Kv Ht Abl Cable Of Size 3X50 Sq Mm Phase 1X50 Sq Mm Bare Messenger In Yercaud Feeder In Yercaud I Section
BOQ
| Name of Work: - works for Survey Supply, Erection, Testing and Replacement of 22 KV ACSR 7/2.59 mm Conductor by Running Single Circuit 22 KV HT Aerial Bunched Cable of Size 3 x 50 Sq.mm (Phase) +1 x 50 Sq.mm Bare Messenger in Ex.Yercaud 22 K.V feeder in Yercaud I Section (From Horticulture D.P to Marapalam SS 100 KVA DT), Maravaneri Sub-Division, East Division, Salem EDC | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Supply of materials | |||
| 2 | 2 | Supply of 22 KV HT Aerial Bunched Cable of size 3x50 Sq.mm (Phase) + 1x50 Sq.mm Bare messenger (Inclusive of 5% Sag) | 3.098 | Km | |
| 3 | 3 | Suspension Clamp Assembly including Pole Clamp | 54 | Each | |
| 4 | 4 | Dead End Clamp / Anchor Clamp Assembly including brackets, Pole Clamp | 36 | Each | |
| 5 | 5 | End Termination Kits | 19 | Each | |
| 6 | 6 | Cable Straight Through Joint Kits | 2 | Each | |
| 7 | 7 | T Joint Kit | 10 | Each | |
| 8 | 8 | Pole Concreting Materials | 16 | Loc | |
| 9 | 9 | Stay Pit Concreting Materials | 20 | Loc | |
| 10 | 10 | Grounding Connection for Messenger Wire | 74 | Loc | |
| 11 | 11 | Spiral Electrodes | 74 | Loc | |
| 12 | 12 | Labour Charges | |||
| 13 | 13 | Labour Charges for Erection of 22 KV HT Aerial Bunched Cable of size 3x95 (Phase) + 1x95 Sq.mm Bare messenger (Inclusive of 5% Sag) | 3.098 | Kms | |
| 14 | 14 | Erection of Suspension Clamp Assembly including Pole Clamp | 54 | Each | |
| 15 | 15 | Erection of Dead End Clamp / Anchor Clamp Assembly including Brackets, Pole Clamp | 36 | Each | |
| 16 | 16 | Erection of End Termination Kits | 19 | Each | |
| 17 | 17 | Erecton of Cable Straight Through Joint Kit | 2 | Each | |
| 18 | 18 | Erection of T Joint Kit | 10 | Each | |
| 19 | 19 | Erection of RSJ Poles 36' (with Base Plate) | 16 | Each | |
| 20 | 20 | Erection of Stay Set/ Guy Set | 20 | Each | |
| 21 | 21 | Erection of 22 KV LAS | 4 | Set | |
| 22 | 22 | Concreting of Guy Set | 20 | Loc | |
| 23 | 23 | Concreting of Pole | 16 | Loc | |
| 24 | 24 | Grounding Connection for Messenger Wire | 74 | Loc | |
| 25 | 25 | Erection of Spiral Electrodes | 74 | Loc | |
| 26 | 26 | Dismantling of All size of Conductor | 8.85 | Km | |
| 27 | 27 | Dismantling of V Cross Arm (4' x 6\") | 46 | Nos | |
| 28 | 28 | Dismantling of Tapping Channel | 19 | Nos | |
| 29 | 29 | Dismantling of Back Clamp | 65 | Nos | |
| 30 | 30 | Dismantling of HT TI Fitting | 61 | Nos | |
| 31 | 31 | Dismantling of 22 KV Pin Insulator and GI Pin | 183 | Nos | |
| 32 | 32 | Dismantling of 11 KV Polymer Composite Disc Insulator with metal parts | 180 | Nos | |
| 33 | 33 | E.S.I. @ 3.25 % should be Entered by the Bidder. | 1 | Percentage | |
| 34 | 34 | E.P.F. @ 13 % should be Entered by the Bidder. | 1 | Percentage | |
| 35 | 35 | G.S.T. @ 18% should be Entered by the Bidder. | 1 | Percentage |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender