Public Health Engineering Department-PHED has published Survey, Investigation, Design And Construction Of Piped Water Supply Scheme And Retrofitting Of Piped Water Supply Scheme In Villages- Bahkal, Sayal, Palhera, Chakarwahi, Tingipur, Bakiguda, Basinkhar, Baherakhar, Santapur, Gudma Block Birsa (Ten Village). Submission Date for this Tender is 12-07-2021. Survey Works Tenders in Birsa Madhya Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 23-Jun-2021 | 1st Corrigendum | Date | 12-07-2021 |
Name of Work: Survey, Investigation, Design and Construction of Piped Water Supply Scheme and Retrofitting of Piped Water Supply Scheme in Villages- Bahkal, Sayal, Palhera, Chakarwahi, Tingipur, Bakiguda, Basinkhar, Baherakhar, Santapur, Gudma Block Birsa (Ten Village) Block Birsa ,Including Constraction of OHT 75 KL 15 Mtr Staging, 50 KL 15 Mtr Staging, Constraction of 20KL Sumpwell, installation of solar pump, Installation of solar pump, Three/Single phase pump, HDPE tank with 5 mtr. staging & Repairing of RCC OHT 80 KL 12 Mtr. Staging, Old pipeline & Providing, Laying, Jointing & Testing of HDPE Pipe of Risingmain, Distribution Pipeline 100% House Hold Tap Connection & Cost of Material and Labour with 90 Days Trialrun/ Comissioning Period of Entire Scheme. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Item Description | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | Survey, Investigation, Design and Construction of Piped Water Supply Scheme and Retrofitting of Piped Water Supply Scheme in Villages- Bahkal, Sayal, Palhera, Chakarwahi, Tingipur, Bakiguda, Basinkhar, Baherakhar, Santapur, Gudma Block Birsa (Ten Village) Block Birsa ,Including Constraction of OHT 75 KL 15 Mtr Staging, 50 KL 15 Mtr Staging, Constraction of 20KL Sumpwell, installation of solar pump, Installation of solar pump, Three/Single phase pump, HDPE tank with 5 mtr. staging & Repairing of RCC OHT 80 KL 12 Mtr. Staging, Old pipeline & Providing, Laying, Jointing & Testing of HDPE Pipe of Risingmain, Distribution Pipeline 100% House Hold Tap Connection & Cost of Material and Labour with 90 Days Trialrun/ Comissioning Period of Entire Scheme. | BI01010001010000000000000515BI0100001113 | 1 | Job |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail