Numaligarh Refinery Limited has published Assistance In Operation And Annual Mechanical Maintenance Of Ccu. Submission Date for this Tender is 09-07-2021. Earth Moving Machinery Tenders in Numaligarh Refinery Limited Assam. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 18-Jun-2021 | Information regarding submission of Udyam registration certificate | Other | 07-07-2021 |
2 | 07-Jul-2021 | Tender date extension | Date | 09-07-2021 |
Name of Work: ASSISTANCE IN OPERATION AND ANNUAL MECHANICAL MAINTENANCE OF CCU. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Unit of measurement (UOM) | |
1 | 10 | Assistance in operation of CCU | NIL1 | ||
2 | 10.01 | Field assistance in opn belt 1,2 & 3 | NIL2 | 1980 | EA |
3 | 10.02 | Field assistance in opn belt 4,5 & 6 | NIL3 | 1980 | EA |
4 | 10.03 | Field assistance in opn belt-7 & bunker | NIL4 | 1980 | EA |
5 | 10.04 | Field assistance in opn belt-8,9,hopper | NIL5 | 1980 | EA |
6 | 10.05 | Field assistance in opn belt-1,11 & 12 | NIL6 | 960 | HR |
7 | 10.06 | Operation & Upkeepment of NRL excavator | NIL7 | 1460 | OCC |
8 | 10.07 | Deployment and operation of tipper | NIL8 | 1920 | HR |
9 | 10.08 | Periodic shifting of spillage RPC &CPC | NIL9 | 3000 | MT |
10 | 10.09 | Dechoking/cleaning of cyclone seperator | NIL10 | 72 | EA |
11 | 10.1 | Operation & Upkeepment of NRL owned eart | NIL11 | 720 | MDY |
12 | 20 | Annual maintenance of CCU | NIL12 | ||
13 | 20.01 | Clamping of conveyor belt by clamps | NIL13 | 40 | EA |
14 | 20.02 | Cold repair of conveyor belt | NIL14 | 24 | EA |
15 | 20.03 | HOT VULCANISING OF CONVEYORS BELTS | NIL15 | 20 | EA |
16 | 20.04 | MAINTENANCE OF CONVEYOR BELTS | NIL16 | 36 | EA |
17 | 20.05 | Opening & box up of Plummer Blocks | NIL17 | 144 | NOS |
18 | 20.06 | Rotary Kiln Maintenance | NIL18 | 2 | EA |
19 | 20.07 | Rotary coooler maintenance | NIL19 | 2 | EA |
20 | 20.08 | Kiln girth gear inspection & maintenance | NIL20 | 4 | EA |
21 | 20.09 | Cooler girth gear inspection & maint. | NIL21 | 4 | EA |
22 | 20.1 | PM of KILN/Skewing of Klin | NIL22 | 8 | EA |
23 | 20.11 | PM of Cooler/SKEWING OF COOLER | NIL23 | 8 | EA |
24 | 20.12 | Equipment maintenance,size :Up to 100kg | NIL24 | 4000 | KG |
25 | 20.13 | Equipment maintenance ,size:above 100kg | NIL25 | 6000 | KG |
26 | 20.14 | Transportation of different mech items | NIL26 | 24000 | KG |
27 | 20.15 | Dechoking of pipe lines | NIL27 | 200 | IM |
28 | 20.16 | Gland repacking of all type of vlvs | NIL28 | 60 | NOS |
29 | 20.17 | Valve gland tightening | NIL29 | 60 | NOS |
30 | 20.18 | Valve greasing | NIL30 | 60 | NOS |
31 | 20.19 | Strainer: dismantling, cleaning for all | NIL31 | 100 | NOS |
32 | 20.2 | Flange size up to 1.5 inch all rating | NIL32 | 300 | NOS |
33 | 20.21 | Flange size up to 4; 6; 8 inch 150# | NIL33 | 30 | NOS |
34 | 20.22 | Flange size up to 10; 12; 14 inch 150# | NIL34 | 16 | NOS |
35 | 20.23 | Flange size up to 20 inch and above 150 | NIL35 | 4 | NOS |
36 | 20.24 | Flange size up to 2;3;4 inch 300# to 600 | NIL36 | 60 | NOS |
37 | 20.25 | Flange size up to 6; 8 inch 300# to 600 | NIL37 | 30 | NOS |
38 | 20.26 | Flange size up to 10 inch 300# to 600# | NIL38 | 20 | NOS |
39 | 20.27 | Scaffolding: Rigid; well secured steel | NIL39 | 2000 | M3 |
40 | 20.28 | Rotary Soot Blower servicing | NIL40 | 36 | NOS |
41 | 20.29 | Retractable Soot Blower servicing | NIL41 | 12 | NOS |
42 | 20.3 | Fabrication & erection of steel structur | NIL42 | 10000 | KG |
43 | 20.31 | Dismenling of existing structural work | NIL43 | 4000 | KG |
44 | 20.32 | Kiln /Cooler / Incinerator/chemical dosi | NIL44 | 32 | EA |
45 | 20.33 | Vessels Hydrotesting/Pneumatic testing | NIL45 | 200 | M3 |
46 | 20.34 | Decoupling & Coupling-All spacer type | NIL46 | 40 | NOS |
47 | 20.35 | Decoupling & Coupling-All non-spacer typ | NIL47 | 40 | NOS |
48 | 20.36 | Alignment-All spacer type coupling | NIL48 | 60 | NOS |
49 | 20.37 | Alignment-All non-spacer type coupling | NIL49 | 20 | NOS |
50 | 20.38 | Constant level Oiler/sight glass/level | NIL50 | 12 | NOS |
51 | 20.39 | Dismantle,maint'nance&boxup of equipment | NIL51 | 20000 | KG |
52 | 20.4 | Motor dismantling & erection all pumps | NIL52 | 20000 | KG |
53 | 20.41 | Repacement of V belt of Pulleys . | NIL53 | 80 | NOS |
54 | 20.42 | Lube oil Changing of all equipments | NIL54 | 3000 | L |
55 | 20.43 | Rectification of faulty steam trap | NIL55 | 40 | NOS |
56 | 20.44 | Dropping & erection of PSV / TSV | NIL56 | 1200 | KG |
57 | 20.45 | Dropping/Erection of valve | NIL57 | 200 | ID |
58 | 20.46 | Internal repairing of valve | NIL58 | 20 | ID |
59 | 20.47 | CS/AS NIBR pipe flame cutting | NIL59 | 700 | ID |
60 | 20.48 | CS/AS NIBR pipe bevelling | NIL60 | 700 | ID |
61 | 20.49 | CS /AS NIBR pipe fit up and welding | NIL61 | 800 | ID |
62 | 20.5 | SS pipe cutting of different sizes | NIL62 | 100 | ID |
63 | 20.51 | SS pipe bevelling of different sizes | NIL63 | 100 | ID |
64 | 20.52 | SS pipe fit up and welding | NIL64 | 100 | ID |
65 | 20.53 | Welding/grinding of SS anchors | NIL65 | 2400 | ID |
66 | 20.54 | PM for centrifugal / Rotary pump ,FAN | NIL66 | 200 | NOS |
67 | 20.55 | PM for reciprocating / vertical pump | NIL67 | 20 | NOS |
68 | 20.56 | Preventive Maintenance of Vibrating scre | NIL68 | 48 | EA |
69 | 20.57 | Preventive Maintenance of Conveyor belts | NIL69 | 240 | EA |
70 | 20.58 | Preventive Maintenance of Weigh Feeders | NIL70 | 100 | EA |
71 | 20.59 | BAG FILTER HOUSE: Replacement of Pulse J | NIL71 | 2160 | NOS |
72 | 20.6 | Loading of chemical into the dozing tank | NIL72 | 360 | KG |
73 | 20.61 | STITCHING MACHINE: Periodic inspection | NIL73 | 192 | NOS |
74 | 20.62 | Overhauling of Heat Exchanger,oil cooler | NIL74 | 8 | EA |
75 | 20.63 | Manway opening & box up of Kiln,cooler | NIL75 | 280 | NOS |
76 | 20.64 | Spray Nozzle:Taking out of quenching wat | NIL76 | 60 | EA |
77 | 20.65 | Expansion bellow opening, replacement | NIL77 | 60 | RM |
78 | 20.66 | Damper repairing upto 500mm | NIL78 | 40 | NOS |
79 | 20.67 | Damper repairing above 500mm | NIL79 | 6 | NOS |
80 | 20.68 | CS/AS Plate cutting per mm thickness | NIL80 | 300 | RM |
81 | 20.69 | SS Plate cutting per mm thickness | NIL81 | 120 | RM |
82 | 20.7 | CS Plate welding per mm thickness | NIL82 | 300 | RM |
83 | 20.71 | SS/AS Plate welding per mm thickness | NIL83 | 100 | RM |
84 | 20.72 | Dropping of burner block,muffle box ass | NIL84 | 8 | EA |
85 | 20.73 | Burner gun maintenance:Rotary kiln, Inci | NIL85 | 16 | EA |
86 | 20.74 | Application of cold weld/magic wrap | NIL86 | 20 | OCC |
87 | 20.75 | Preventive maintenance of excavator | NIL87 | 24 | OCC |
88 | 20.76 | Major overhauling job of the excavator | NIL88 | 4 | OCC |
89 | 20.77 | Vessel overhauling:Kiln&Cooler/Incinerat | NIL89 | 12 | EA |