Indian Oil Corporation Limited-IOCL has published Augmentation Of Tank Farm Management System At Srr-819. Submission Date for this Tender is 09-07-2021. Application Software Tenders in IOCL Paradip Refinery Odisha. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 01-Jul-2021 | Corrigendum-1 | Date | 09-07-2021 |
Name of Work: AUGMENTATION OF TANK FARM MANAGEMENT SYSTEM (TFMS) AT SRR-819 including Supply of all Accessories (if any) & Documentation as per the enclosed Tender specifications, Job specification, Supply Requisition etc. as per Material Requisition for Additional Storage Tanks at IOCL Paradip Refinery. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | TANK FARM MANANGEMENT SYSTEM (TFMS) FOR SRR-819-ADDITIONAL TANK ATF, MS, SULPHUR AND ALKYLATE. :\n\nComplete Augmentation of existing TFMS system as detailed in supply requisition included as minimum:\n\n- Installation , integration of necessary hardware and software along with supply if any required for TFMS augmentation.\n- Upgradation of software like additional graphics screens development and system configuration, augmentation of TFMS work stations / server’s storage capacity software licenses if any.\n- Updating inventory management software for additional tankages for alarming, user configurable tank grouping, events, manual override views, bar graphs, tank icons, tabular data and all other tank related details etc.,\n-Submission of technical documents like preliminary architecture drawing, preliminary loop wiring documents etc., along with technical bid\n- To establish data communication with ICSS system.\n- Submission of final architecture drawing/loop wiring drawing / documentation and O&M Manuals for as-built documentation\n-Site supervision , validation for termination of TRL/2 cables, verification of installed field instrument on tanks along with complete loop ,integration in TFMS system and configuration as required\n- Power on pre-SAT and SAT\n- Pre-commissioning /Commissioning /Start-up activities | item1 | 1 | Man Day |
2 | 2 | Supply cost of TFMS cabinet internal cables, terminal blocks, din rails and any other consumables/Spares/Special Tools required to carry out and complete entire scope of work/supplies/Services as detailed in Material Requisition. | item2.01 | 1 | Set |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail