| 1 | 1 | Dismantling cement concrete including disposal of material within 50 m lead, inclusive of de-watering wherever required. | | 102 | cum |
|---|
| 2 | 2 | Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required.IN CEMENT MORTAR | | 72.9 | cum |
|---|
| 3 | 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respectHard soil mixed with Kankar / boulders, Morrum | | 8.1 | cum |
|---|
| 4 | 4 | Preparation and dressing the sub grade including removal of irregularities up to 7.5 cm in soil, morrum mixed with pebbles, small boulders and and kankar & murrum for BED | | 1222.5 | SQM |
|---|
| 5 | 5 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using.TOR OR RIBBED BARS | | 4218.43 | kgs |
|---|
| 6 | 6 | Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto(For mix design Cement content considered 400 kg/ cum of concrete) | | 195.75 | Cum |
|---|
| 7 | 7 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Top or intermediate bed plates, in between masonry or piers, abutments sluice wells etc. | | 552 | sqm |
|---|
| 8 | 8 | Labour charges for steel reinforcement including bending, binding, and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts. | | 1222.5 | sqm |
|---|
| 9 | 9 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement.Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. | | 195.75 | cum |
|---|
| 10 | 10 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm | | 121.5 | cum |
|---|