| 1 | 1 | DSITC Pre heaters | item1 | 4 | No |
|---|
| 2 | 2 | DSITC HIGH HEATERS | item2 | 2 | No |
|---|
| 3 | 3 | PUMP SEAL WATER RECIRCULATION SYSTEM | item3 | 1 | Job |
|---|
| 4 | 4 | CONDENSATE RECOVERY SYSTEM | item4 | 1 | Job |
|---|
| 5 | 5 | Automation of complete plant complete including field instruments and other allied accessories | item5 | 1 | Job |
|---|
| 6 | 6 | Electtrical system and panels complete in all respects including switchgears, panels , cable tray etc. | item6 | 1 | Job |
|---|
| 7 | 7 | Homogenizer cum pressure pump along with accessories | item7 | 1 | No |
|---|
| 8 | 8 | DSITC conversion of existing setup into dual drying nozzle / Rotary setup including necessary modifications in drying chamber | item8 | 1 | Set |
|---|
| 9 | 9 | DSITC nozzle atomizer setup ( Complete ) | item9 | 1 | Set |
|---|
| 10 | 10 | DSITC rotary atomizer | item10 | 1 | No |
|---|
| 11 | 11 | DSITC stack loss recovery Setup including allied accessories as per requirment of 30 TPD Plant | item11 | 1 | No |
|---|
| 12 | 12 | DSITC Fire Existinguishing setup | item12 | 1 | Job |
|---|
| 13 | 13 | Powder conveying and 25 kg bag packing setup | item13 | 1 | No |
|---|
| 14 | 14 | DSITC semi Automatic powder packing in tin | item14 | 1 | No |
|---|
| 15 | 15 | REFURBISHMENT OF Drying CHAMBER | item15 | 1 | Job |
|---|
| 16 | 16 | DSITC SAFETY DOORS for Drying CHAMBER | item16 | 2 | No |
|---|
| 17 | 17 | DSITC DOORS AND MANHOLES | item17 | 1 | Set |
|---|
| 18 | 18 | DSITC Holding Coil for evaporator | item18 | 1 | No |
|---|
| 19 | 19 | Repair/Refurbishment of Fluidized Bed Drier | item19 | 1 | Lot |
|---|
| 20 | 20 | DSITC LIFT IN POWDER PLANT | item20 | 1 | No |
|---|
| 21 | 21 | DSITC LIFT IN Drying CHAMBER | item201 | 1 | No |
|---|
| 22 | 22 | Instrumention and Control ( Calibration of all existing field instruments/ replacement of faulty ones ) | item21 | 1 | Lot |
|---|
| 23 | 23 | Repair of MVR frame/foundation including civil works | item22 | 1 | Job |
|---|
| 24 | 24 | DSITC Exhaust Fan as per plant requirements | item23 | 1 | No |
|---|
| 25 | 25 | DSITC of Wet Cleaning System | item25 | 1 | Set |
|---|
| 26 | 26 | VFD for Powder Plant | item26 | 1 | Lot |
|---|
| 27 | 27 | VFDs on Vibro Fludized Bed | item27 | 2 | no |
|---|
| 28 | 28 | Clean Air Room for supply of air to entire plant | item28 | 1 | set |
|---|
| 29 | 29 | Complete Overhauling of Milk Pumps | item29 | 1 | Job |
|---|
| 30 | 30 | DSITC of vacuum pumps | item30 | 2 | Nos. |
|---|
| 31 | 31 | DSITC of hot and cold air blowers for vibro fluidzer | item31 | 1 | Job |
|---|
| 32 | 32 | Lightening of Powder PLant | item32 | 1 | Job |
|---|
| 33 | 33 | Pipes, Valves and fittings SS 304, MS , GI including necessary insulation on hot, chilled and product lines, wherever suitable as per standard industry norms | item33 | 1 | lot |
|---|