Housing Urban and Rular Development Government Departments Closing in 0 days TDR #28159221

New Construction Work At Ramnarayan Ke Khure Via Chopra To Soopa Road Under B V N

Issued by Government Departments · Mahoba, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
17 Jun 2021
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
2720
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mahoba → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

New Construction Work At Ramnarayan Ke Khure Via Chopra To Soopa Road Under B V N

BOQ

Name of Work: ????????? ?? ???? ?? ????? ???? ???? ???? ?? ????? ?? ?? ??????? (????? ?? ????)
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 50 meter as per MORD technical specification cause 301.5 MORD sepecification 301.5(i) S.No. 3.418420cum
22Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads. transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead up to 1000 m as per Technical specification cause 303.1. including Stablization with 2% slaked lime including its mixing with rotabator complete.27530cum
33Providing, Laying and spreading material (G.S.B.) on a prepared sub grade, adding cement @ 2% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to form a layer of sub base.31080cum
44Providing, Laying and spreading material (W.M.M.) on a prepared sub grade, adding cement @ 4% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to form a layer of sub base.41395cum
55Providing and applying tack coat with V.G.-10 bitumen using bitumen pressure dristributor @ 0.35 to 0.45 kg. per sqm. on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.59937.5sqm
66Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable mixall, laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat . Technical sepecification Claues 50869937.5sqm
77Providing and laying seal coat Type-C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using As per Technical Specification Clause 51079937.5sqm
88Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads. transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead up to 1000 m as per Technical specification cause 303.1. including Stablization with 2% slaked lime including its mixing with rotabator complete. (Pattri)82940cum
99C/o 1000/ 600 mm dia NP3, 350mm Gule culvert and RCC Span 1x3.00m\nExcavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. (i/c royalty)9395cum
1010Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km (5 miles) from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work. (S.I. No. 255)1046.5cum
1111Construction of granular sub-base (Grade-I) by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. for bdding1122cum
1212Cast cement concrate 4cm. (1½'') gauge approved stone ballast, coarse sand and cement in the proportion 1:4:8 in foundation including supply of all materials,labour and tools and plants etc. required for proper completion of the work. S.I. No. 2811215.8cum
1313RCC work with cement approved coarse sand and 2cm. (3/4'') gauge approved stone ballast in the proportion 1:1.5:3 in lintels of doors and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost.. but in RCC T-beam and slab roof in 1.1.5.3 (S.I. No. 288)1312.75cum
1414Mild steel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured. (S.I. No. 504)1413.5Qtl.
1515Providing weepholes in plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 617. 709, 1204.3.7 {as per road work Chp-12 (12.9)}1546.4RM
1616Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work.\n(Chpt-8 Add Item (b)16271.85cum
1717Raised pointing with cement and fine sand of 1.25 fineness modulus mortar on brick work in proportion of 1:2 including supply of all materials, labour and tools and plants etc. required for proper completion of the work S.I.No-57717232.85sqm
1818Cement concrete with 20mm gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. \n(As per Chap-5 S.I. No. 279a)181.8cum
1919Cement concrete with 40mm gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. \n(As per Chap-5 S.I. No. 279)1938.15cum
2020Plastering with cement mortar (1:4), 12 mm thick on R.C.R. work in substructure as per technical specification Clauses 613.4 & 1204 S.I.No-584201.08sqm
2121Providing and laying reinforced cement concrete 1000 mm dian NP3 hume pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.2122.5RM
2222Providing and laying reinforced cement concrete 600 mm dian NP3 hume pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.2222.5RM
2323Providing and laying reinforced cement concrete pipe 350 mm dia NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.2322.5RM
2424Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. S.I. No.-3052414cum

AI Tender Summary

OUR REF NO 28159221
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 17-06-2021
Authority
Authority Name Public Works Department
Work Description New Construction Work At Ramnarayan Ke Khure Via Chopra To Soopa Road Under B V N
Basic Detail
Tender No 648(ii)/35C-Hamirpur Circle/21 Dt. 17.05.2021
Bidding Type Tender
Location
City Mahoba
State Uttar Pradesh
Key Dates
Publish Date 10 Jun 2021
Submission Date 17 Jun 2021
Open Date 17 Jun 2021
Finance
Tender Value Ref. Documents
Tender Fee 2720
EMD Ref. Documents
Exemption Not Available
Document List
T2.pdf
84405440-838C-4714-9AF0-28CEC1EAA8ED.html
Tendernotice_1.pdf
BOQ_916076.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 10, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 17, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jun 17, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

T2.pdf

html

84405440-838C-4714-9AF0-28CEC1EAA8ED.html

pdf

Tendernotice_1.pdf

xls

BOQ_916076.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders