| 1 | 1 | Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) Grading- III (Using Screening Crushable type such as Moorum or Gravel) Using Screening Crushable type such as Moorum or Gravel | BI01010001010000000000000515BI0100001113 | 150 | P.Cum |
|---|
| 2 | 2 | Filling Pot-holes and Patch Repairs with Mix Seal Surfacing Type B , 20mm. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 511, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 | BI01010001010000000000000515BI0100001114 | 3000 | P.Sqm |
|---|
| 3 | 3 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m) | BI01010001010000000000000515BI0100001115 | 1550 | P.Cum |
|---|
| 4 | 4 | Excavation in Hard Rock (blasting prohibited) (Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) Mechanised | BI01010001010000000000000515BI0100001116 | 555 | P.Cum |
|---|
| 5 | 5 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) By Mechanical Means In area of light jungle | BI01010001010000000000000515BI0100001117 | 3 | Hect |
|---|
| 6 | 6 | Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.) | BI01010001010000000000000515BI0100001118 | 4800 | P.Sqm |
|---|
| 7 | 7 | Maintenance of Earth Shoulder (stripping excess soil) (Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor) | BI01010001010000000000000515BI0100001119 | 4700 | P.Sqm |
|---|
| 8 | 8 | Surface Drains in Ordinary Rock (Construction of unlined surface drain of average cross sectional area 0.4 sqm in ordinary rock to specified lines, grades, levels and dimensions as per approved design and to the requirement of clause 301 to 309. Excavated material to be used in embankment at site.) Mechanical Means | BI01010001010000000000000515BI0100001120 | 3000 | P.Rmt |
|---|