| 1 | 1 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) By Mechanical Means In area of light jungle | BI01010001010000000000000515BI0100001113 | | |
|---|
| 2 | 2 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001114 | 3.6 | P.Hect. |
|---|
| 3 | 3 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001115 | 1.2 | P.Hect. |
|---|
| 4 | 4 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m) | BI01010001010000000000000515BI0100001116 | | |
|---|
| 5 | 5 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001117 | 3980.35 | P.Cum. |
|---|
| 6 | 6 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001118 | 1658.48 | P.Cum. |
|---|
| 7 | 7 | Excavation in Ordinary Rock using Hydraulic ExcavatorCK-90 and Tippers with disposal upto 1000 metres. (Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) | BI01010001010000000000000515BI0100001119 | | |
|---|
| 8 | 8 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001120 | 3980.35 | P.Cum |
|---|
| 9 | 9 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001121 | 829.24 | P.Cum |
|---|
| 10 | 10 | Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres (Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres ) | BI01010001010000000000000515BI0100001122 | | |
|---|
| 11 | 11 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001123 | 5307.14 | P.Cum |
|---|
| 12 | 12 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001124 | 829.24 | P.Cum |
|---|
| 13 | 13 | Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2) | BI01010001010000000000000515BI0100001125 | | |
|---|
| 14 | 14 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001126 | 10710 | P.Cum |
|---|
| 15 | 15 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001127 | 3077.5 | P.Cum |
|---|
| 16 | 16 | Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2) | BI01010001010000000000000515BI0100001128 | | |
|---|
| 17 | 17 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001129 | 4137.94 | P.Cum |
|---|
| 18 | 18 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001130 | 1166.03 | P.Cum |
|---|
| 19 | 19 | Granular Sub-base with Close Graded Material (Table:- 400-1) By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator / by mechanical means at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) for grading-III Material | BI01010001010000000000000515BI0100001131 | | |
|---|
| 20 | 20 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001132 | 3375 | P.Cum |
|---|
| 21 | 21 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001133 | 1125.01 | P.Cum |
|---|
| 22 | 22 | Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.) | BI01010001010000000000000515BI0100001134 | | |
|---|
| 23 | 23 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001135 | 3178.13 | P.Cum |
|---|
| 24 | 24 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001136 | 1082.82 | P.Cum |
|---|
| 25 | 25 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) | BI01010001010000000000000515BI0100001137 | | |
|---|
| 26 | 26 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001138 | 6750 | P.Cum |
|---|
| 27 | 27 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001139 | 2250 | P.Cum |
|---|
| 28 | 28 | Primer coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/Sqm using mechanical means as per Technical Specification Clause 502 ( Low Porosity ) | BI01010001010000000000000515BI0100001140 | | |
|---|
| 29 | 29 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001141 | 19875 | P.Sqm |
|---|
| 30 | 30 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001142 | 6937.5 | P.Sqm |
|---|
| 31 | 31 | Tack coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per Sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 | BI01010001010000000000000515BI0100001143 | | |
|---|
| 32 | 32 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001144 | 19875 | P.Sqm |
|---|
| 33 | 33 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001145 | 6937.5 | P.Sqm |
|---|
| 34 | 34 | Open - Graded Premix Surfacing (Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates @ 0.27 Cum / Sqm either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.)As per clause 510. Case - I: Mechanical method using Penetration grade Bitumen VG - 30 @ 14.6 Kg / 10 Sqm and HMP of appropriate capacity not less than 40-60 tonnes/hour . | BI01010001010000000000000515BI0100001146 | | |
|---|
| 35 | 35 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001147 | 19875 | P.Sqm |
|---|
| 36 | 36 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001148 | 6937.5 | P.Sqm |
|---|
| 37 | 37 | Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats) Case - III : Type C (Providing and laying of premix seal coat with HMP of appropriate capacity not less than 40-60 tonnes/ hours using crushed stone chipping 6.7 mm size @ 0.09 Cum / 10Sqm and penetration bitumen @ 4.5 % of Mix of suitable grade.) By VG - 30 | BI01010001010000000000000515BI0100001149 | | |
|---|
| 38 | 38 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001150 | 19875 | P.Sqm |
|---|
| 39 | 39 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001151 | 6937.5 | P.Sqm |
|---|
| 40 | 40 | Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) | BI01010001010000000000000515BI0100001152 | | |
|---|
| 41 | 41 | Ordinary Kilometer stone (Precast) | BI01010001010000000000000515BI0100001153 | | |
|---|
| 42 | 42 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001154 | 7 | Nos. |
|---|
| 43 | 43 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001155 | 3 | Nos. |
|---|
| 44 | 44 | Hectometer stone (Precast) | BI01010001010000000000000515BI0100001156 | | |
|---|
| 45 | 45 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001157 | 24 | Nos. |
|---|
| 46 | 46 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001158 | 8 | Nos. |
|---|
| 47 | 47 | Retro- reflectorised Traffic signs (Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing) 60 cm equilateral triangle | BI01010001010000000000000515BI0100001159 | | |
|---|
| 48 | 48 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001160 | 19 | Nos. |
|---|
| 49 | 49 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001161 | 17 | Nos. |
|---|
| 50 | 50 | Direction and Place Identification signs upto 0.9 Sqm size board. (Providing and erecting direction and place identification retro-reflectorised sign asper IRC:67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 Sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing) | BI01010001010000000000000515BI0100001162 | | |
|---|
| 51 | 51 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001163 | 1.8 | Sqm |
|---|
| 52 | 52 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001164 | 1.8 | Sqm |
|---|
| 53 | 53 | Providing and fixing of typical informatory sign board with Logo as per MORD specifications, drawing and as per direction of Engineer in Charge. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing . | BI01010001010000000000000515BI0100001165 | | |
|---|
| 54 | 54 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001166 | 1 | Nos. |
|---|
| 55 | 55 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001167 | 1 | Nos. |
|---|
| 56 | 56 | Providing and fixing Mukhya Mantri Sadak Yojana/Mahatma Gandhi Raiys sadak Yojana informatory sign board with ogo for roads funded by State road fund having M.S. Definition plate of 1.60MM thickness frame to stell hollow dsection of 75mmX75mm, 2.5m Long stove enamelled paint with hold fast including paint logo as per approved design and colours. The logo shall be made out of 1.6mm thick circular plate duly framed with MS angle 25X25X5 mm on back and fix on 1200mm X 150mm rectangular steel base plate 1.6mm thick, the base of circular shall be plain at the junction of base plate. The size of definition plate shall be 1500X600 MM and embedding the posts by M-15 Cement concrete block 45CM X 45CM X 60 CM, 60 CM below ground level including lettering/writing and painting etc. complete in all respect. | BI01010001010000000000000515BI0100001168 | | |
|---|
| 57 | 57 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001169 | 1 | Nos. |
|---|
| 58 | 58 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001170 | 1 | Nos. |
|---|
| 59 | 59 | Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-1967, fixed in position including finishing and lettering but excluding painting) | BI01010001010000000000000515BI0100001171 | | |
|---|
| 60 | 60 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001172 | 267 | Nos. |
|---|
| 61 | 61 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001173 | 18 | Nos. |
|---|
| 62 | 62 | White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning Scraping etc. as per specification Clause 1915 | BI01010001010000000000000515BI0100001174 | | |
|---|
| 63 | 63 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001175 | 1015.2 | Sqm. |
|---|
| 64 | 64 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001176 | 310.5 | Sqm. |
|---|
| 65 | 65 | Laying Reinforced Cement Concrete Pipe NP3/prestrssed concrete pipe on first class bedding in single row . (Laying Reinforced cement concrete pipe NP3/prestrssed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) 300 mm dia | BI01010001010000000000000515BI0100001177 | | |
|---|
| 66 | 66 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001178 | 22.5 | P.Rmt. |
|---|
| 67 | 67 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001179 | 22.5 | P.Rmt. |
|---|
| 68 | 68 | Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per Cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form , spread, compacted and finished with Screed vibrator & plate vibrator in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, finishing to lines and grades including Vaccume dewatering , all work as per drawing and specifications ) | BI01010001010000000000000515BI0100001180 | | |
|---|
| 69 | 69 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001181 | 393.75 | P.Cum |
|---|
| 70 | 70 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001182 | 84.38 | P.Cum |
|---|
| 71 | 71 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary rock (not requiring blasting) Mechanical Means | BI01010001010000000000000515BI0100001183 | | |
|---|
| 72 | 72 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001184 | 1589.25 | P.Cum |
|---|
| 73 | 73 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001185 | 454.2 | P.Cum |
|---|
| 74 | 74 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) | BI01010001010000000000000515BI0100001186 | | |
|---|
| 75 | 75 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001187 | 124.57 | P.Cum |
|---|
| 76 | 76 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001188 | 31.99 | P.Cum |
|---|
| 77 | 77 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M20 | BI01010001010000000000000515BI0100001189 | | |
|---|
| 78 | 78 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001190 | 201.91 | P.Cum |
|---|
| 79 | 79 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001191 | 57.61 | P.Cum |
|---|
| 80 | 80 | Laying Reinforced Cement Concrete Pipe NP3/prestrssed concrete pipe on first class bedding in single row . (Laying Reinforced cement concrete pipe NP3/prestrssed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) 600 mm dia | BI01010001010000000000000515BI0100001192 | | |
|---|
| 81 | 81 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001193 | 112.5 | P.Rmt |
|---|
| 82 | 82 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001194 | 45 | P.Rmt |
|---|
| 83 | 83 | Stone masonry work in cement mortar in foundation complete as drawing and Technical Specification Random Rubble Masonry in cement mortar 1:4 | BI01010001010000000000000515BI0100001195 | | |
|---|
| 84 | 84 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001196 | 790.36 | P.Cum |
|---|
| 85 | 85 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001197 | 220.17 | P.Cum |
|---|
| 86 | 86 | Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications | BI01010001010000000000000515BI0100001198 | | |
|---|
| 87 | 87 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001199 | 678.86 | P.Sqm |
|---|
| 88 | 88 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001200 | 180.4 | P.Sqm |
|---|
| 89 | 89 | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg Each complete as per drawing and Technical specification.Boulder laid dry without wire crates. | BI01010001010000000000000515BI0100001201 | | |
|---|
| 90 | 90 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001202 | 153.56 | P.Cum |
|---|
| 91 | 91 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001203 | 46.54 | P.Cum |
|---|
| 92 | 92 | Laying Reinforced Cement Concrete Pipe NP3/prestrssed concrete pipe on first class bedding in single row . (Laying Reinforced cement concrete pipe NP3/prestrssed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) 1000 mm dia | BI01010001010000000000000515BI0100001204 | | |
|---|
| 93 | 93 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001205 | 90 | P.Rmt |
|---|
| 94 | 94 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001206 | 22.5 | P.Rmt |
|---|
| 95 | 95 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications | BI01010001010000000000000515BI0100001207 | | |
|---|
| 96 | 96 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001208 | 278.8 | Each |
|---|
| 97 | 97 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001209 | 69 | Each |
|---|
| 98 | 98 | Laying Reinforced Cement Concrete Pipe NP 3 / prestrssed concrete pipe on first class bedding in double row . (Laying Reinforced cement concrete pipe NP3 /prestrssed concrete pipe for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) 1000 mm dia. | BI01010001010000000000000515BI0100001210 | | |
|---|
| 99 | 99 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001211 | 15 | P.Rmt |
|---|
| 100 | 100 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001212 | 7.5 | P.Rmt |
|---|
| 101 | 101 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification | BI01010001010000000000000515BI0100001213 | | |
|---|
| 102 | 102 | Kunwariya to Deopura | BI01010001010000000000000515BI0100001214 | 232.05 | P.Cum |
|---|
| 103 | 103 | Hati Bhatta to Kurachon ka Khera | BI01010001010000000000000515BI0100001215 | 51 | P.Cum |
|---|