Fabrication And Erection - 2 Repairing Of Belt Conveyor Roller 3 Dismantling, Fabrication, Erection Of Leak Proof Dampers At Pa, Sa, Fd & Id Fans 4 Dis, Fabrication And Erection Work Of Expansion Bellows At Fd, Id, Esp 5 M.S.Pipe Line Work 6 Steam Pipeline Work 7 Ducting Work 8 Strengthening Of Ducting Of Boiler. 9 Dis, Fab & Ere Of Airheater Expansion Bellow 10 Exhust Line Dismantling, Fabrication & Erection 11 Dis, Fabrication And Erection Of Id Fan Upper & Lower Casing 12 Weak Portion / Truff Replacement Work By M.S Plate Rbc, Mbc, Boiler 13 Dismantling, Fabrication & Erection Of Drum Type N Rotary Bagasse Feeder ( With Shalf ) N 14 Dismantling, Fabrication & Erection Of Screw Feeder 15 Dismantling, Fabrication & Erection Of Screw Feeder Casing. 16 Fabrication & Erection Of Man Hole 17 Dis., Fab & Erecting Of Aph Tubes ( Replacement ) 18 Dis, Fab & Erection Of R.O Plant Pressure Vessel Stand 19 Fab & Erection Of Fire Fighting Pipe Line Including N Valves, Bends, Flange & S - 2 Repairing Of Belt Conveyor Roller 3 Dismantling, Fabrication, Erection Of Leak Proof Dampers At Pa, Sa, Fd & Id Fans 4 Dis, Fabrication And Erection - 2 Repairing Of Belt Conveyor Roller 3 Dismantling, Fabrication, Erection Of Leak Proof Dampers At Pa, Sa, Fd & Id Fans 4 Dis, Fabrication And Erection Work Of Expansion Bellows At Fd, Id, Esp 5 M.S.Pipe Line Work 6 Steam Pipeline Work 7 Ducting Work 8 Strengthening Of Ducting Of Boiler. 9 Dis, Fab & Ere Of Airheater Expansion Bellow 10 Exhust Line Dismantling, Fabrication & Erection 11 Dis, Fabrication And Erection Of Id Fan Upper & Lower Casing 12 Weak Portion / Truff Replacement Work By M.S Plate Rbc, Mbc, Boiler 13 Dismantling, Fabrication & Erection Of Drum Type N Rotary Bagasse Feeder ( With Shalf ) N 14 Dismantling, Fabrication & Erection Of Screw Feeder 15 Dismantling, Fabrication & Erection Of Screw Feeder Casing. 16 Fabrication & Erection Of Man Hole 17 Dis., Fab & Erecting Of Aph Tubes ( Replacement ) 18 Dis, Fab & Erection Of R.O Plant Pressure Vessel Stand 19 Fab & Erection Of Fire Fighting Pipe Line Including N Valves, Bends, Flange & S Work Of Expansion Bellows At Fd, Id, Esp 5 M.S.Pipe Line Work 6 Steam Pipeline Work 7 Ducting Work 8 Strengthening Of Ducting Of Boiler. 9 Dis, Fab & Ere Of Airheater Expansion Bellow 10 Exhust Line Dismantling, Fabrication & Erection 11 Dis, Fabrication And Erection - 2 Repairing Of Belt Conveyor Roller 3 Dismantling, Fabrication, Erection Of Leak Proof Dampers At Pa, Sa, Fd & Id Fans 4 Dis, Fabrication And Erection Work Of Expansion Bellows At Fd, Id, Esp 5 M.S.Pipe Line Work 6 Steam Pipeline Work 7 Ducting Work 8 Strengthening Of Ducting Of Boiler. 9 Dis, Fab & Ere Of Airheater Expansion Bellow 10 Exhust Line Dismantling, Fabrication & Erection 11 Dis, Fabrication And Erection Of Id Fan Upper & Lower Casing 12 Weak Portion / Truff Replacement Work By M.S Plate Rbc, Mbc, Boiler 13 Dismantling, Fabrication & Erection Of Drum Type N Rotary Bagasse Feeder ( With Shalf ) N 14 Dismantling, Fabrication & Erection Of Screw Feeder 15 Dismantling, Fabrication & Erection Of Screw Feeder Casing. 16 Fabrication & Erection Of Man Hole 17 Dis., Fab & Erecting Of Aph Tubes ( Replacement ) 18 Dis, Fab & Erection Of R.O Plant Pressure Vessel Stand 19 Fab & Erection Of Fire Fighting Pipe Line Including N Valves, Bends, Flange & S Of Id Fan Upper & Lower Casing 12 Weak Portion / Truff Replacement Work By M.S Plate Rbc, Mbc, Boiler 13 Dismantling, Fabrication & Erection Of Drum Type N Rotary Bagasse Feeder ( With Shalf ) N 14 Dismantling, Fabrication & Erection Of Screw Feeder 15 Dismantling, Fabrication & Erection Of Screw Feeder Casing. 16 Fabrication & Erection Of Man Hole 17 Dis., Fab & Erecting Of Aph Tubes ( Replacement ) 18 Dis, Fab & Erection Of R.O Plant Pressure Vessel Stand 19 Fab & Erection Of Fire Fighting Pipe Line Including N Valves, Bends, Flange & Support ( Using New Pipeline N & Old Drum To Drum Tubes ) N 20 Travelling Grate Front Side Ash Discharge Plate Dis, Fab, N & Erection With Structure N 21 Fab & Erection Of Travelling Grate Rear Plate Flange Rs. L.S N ( Flange Type ) N 22 Boiling House 23 Platform Work At Various Stations Such As Mill House, Boiler, Turbine, Cranes, Boiling House, C / F House Etc. If Required Any Where. 24 Dismenling Of Electic Motor 25 Fitting Of Motor 26 Repairing Of Exhaust Valve 27 Fab & Erection Of Double Filteration System For Quad & Water Inlet Pipe In Pan Condenser. 28 Arrangement For Lifting Of Vaccum Filtered Drums-3 Nos 29 Replacement Of Exhaust And Vapour Valves In The Boiling House. Dis 30 Replacement Of Exhaust And Vapour Valves In The Boiling House Erec- 31 Fabrication Of Electric Motor Cover. 32 Strengthening Of Vapour Pipe Inside & Outside With Angle Iron Rings / M.S.Plate. 33 Manhole Work In Vapour Pipes / Headers 34 Modification In Bagacillo Chimney 35 Replacement Of Vapour Pipe. Dis 36 Exhaust And Injection 37 Fab 38 Erec. 39 Replacement Of V.Pipe Bends Dis 40 Exhaust & Injection Bends Fab- 41 Exhaust & Injection Bends Erec. 42 Dis, Fab & Ere Of Final Molasses Pipeline 43 Dis, Fab & Ere Of Suction Pipe For Injection, , Ct Pump 44 Fab & Erecdtion Of M.S.Vessels, Square & Rectangular Tank 45 Increase Of Shell Height With All The Fitting And Accessories Work. 46 Fab & Erection Of M.S.Plate Work 47 Dis, Cleaning & Ere Of Pipeline ( Juice, Massecuite, Srrup, Molasses Etc ) 48 Dis, Fab & Ere Of Coil ( Water, Juice, Ammonia, So2etc ) 49 Fab And Erection Of Motor Bed 50 Dis, Fab & Ere Of Nrv For Injection, Turbine, Sprayetc 51 Saveall Of Pan, Quad Dis 52 Saveall Of Pan, Quad Fab 53 Saveall Of Pan, Quad Ere 54 Unloading Of Material From Truck ( Ms, Ss, Ci, Accetc ) 55 Dis, Fab & Ere Of Jay Pipe 56 Fitting Of Baffle Plates 57 Fabrication Of Belt Conveyor 58 Fab & Ere Of Entrainment Catcher. 59 Roofshed For So2 Furnace And Vert. Crystalliser 60 Dismantling, Fabrication & Erection Foot Valve 61 Clarifier Coil Work A ) Dismentling 62 Clarifier Coil Work ( B ) Fabrication 63 Clarifier Coil Work ( C ) Erection 64 Dismentling, Fabrication & Erection Of Perforated M.S Plates Of Direct Contact Juice Heaters. 65 Dismentling , Fabrication & Erection Of Strainers Of Injection, Spray , C.T Pumps. 66 Dismentling , Erection ( With Allignment ) Of Planetary Gear Box Of Crystallizers. 67 Nozzles Of Spray Pond, Condenser. 68 Dismantling ( Earh Nozzle ) 69 Fitting ( Earh Nozzle ) 70 Replacement Of Double Beat Valve 71 Fabrication Of Exhaust Valve Casing 72 Opening & Fitting Of Juice Heater Covers 73 Dismantling & Fitting Of S.S Tubes In N Juice Heater & Evaporator Body N 74 Dismantling, Fabrication & Erection Of N Intercooler Of Sulphur Furnace N 75 Fabrication & Erection Cone Of Syrup Sulphiter N & Its Recovery Tower N 76 Dismantling, Fabrication & Erection Of Mud Mixture Nconveyor N 77 Dismantling, Fabrication & Erection Of Mud Mixture Ncasing N 78 Increasing The Height Of Vertical Crystallizer By 1.5 Mtrs Nalongwith Driving Arrangement, Platform, Valve, Pipe Line N& Centre Shaft Complete In All Respect N 79 Dismantling, Fabrication & Erection Of Down Take Umbrella N Of Pan N 80 Replacement Of 3’’ Coil Of Vertical Crystallizer 81 Gutter Work ( Bigger Side Will Be Treated As Dia. ) 82 Gutter Work Dismantling 83 Gutter Work Fabrication 84 Gutter Work Erection 85 Two Round Welding Work If Required Anywhere 86 Jammed Tube Falling Film Evaporator 87 Replacement Of C.I Cross 88 Dismantling And Erection Of Sluice Valve 89 Fabrication / Strenghting Of Beam, Vessel, Pipe, Channel, N Angle Etc. N 90 Dismantling Of Old Belt Conveyor Structure From N Bagasse Yard. N 91 Dismantling Of Pump 92 Erection And Alignment Of Pump 93 Replacement Of Readymade Bend 94 Replacement Of Ammonia Pipe Of Pan & Quad 95 Replacing Of .S.S Coils Of Vacumm Filter 96 Replacing Of Worn Out Brass Zig Zags & S.S Screens Of Nvaccum Filter N 97 Dismantling Of M.S Plate 98 Dismantling Of Existing Syrup Sulphitor & Shifting It N To Molasses Tank N 99 Dis., Fab & Erection Of Save All Cone Of Evaporator N And Pans N 100 Shifting Of M.S Fabricated Tank 101 Dismantling Installation And Alignment Of Reduction N Gear Box. N 102 Dismantling, Fab & Erectioning Of Agitator 103 Repairing & Assembling Of Complete Sugar Handing Rs. L.S N System With Stackers N 104 Boiler / Turbine, Cooling Tower Sugar Godown / Workshop / Store / Cane Unloader & Factory 105 Fab & Erection Of Gate 106 Strengthning Of Tress Beams, Vessel, Pipe N With Channel, Angle, Pipe Etc Any Where N 107 Roof Sheets / Acc / Iron Sheet Work. Dis- 108 Roof Sheets / Acc / Iron Sheet Work Repair- 109 Replacement & Erection 110 Fab & Erection Of M.S.Stair / Ladder A ) Single Story N N 111 Double Story 112 Cleaning Of Cooling Tower Water Line 113 Checking & Repairing Of Cooling Tower N Water Line Condenser To Cooling Tower N 114 Repair Of Hydraulic Grab Of Cane Unlaoder 115 Replacement Of Square Bar Of Cane Unlaoder 116 Repairing And Cleaning Of Cooling Tower Its Nozzle 117 Misc .Items. 118 M.S Pipeline Per Inch Dia / / Ft / Length ( A ) Dismentling Of Pipe Line. 119 Upto 1” Dia To 12’ Dai . 120 Above 12” 121 Fabrication Of Pipe Line From M.S.Plate Or Ready-Made Pipe Any Dia . 122 Erection Of Pipe Line Per Inch Dia / Ft / Length ( I ) Upto 1’ Dia To 123 Erection Of Pipe Line Per Inch Dia / Ft / Length ( Ii. Above 12” Dia 124 M.S.Pipe Accessories Work, Dismantling Of Bends, Tee, Reducder, Cross, Elbow, Nipple, Nozzle, Flanged, And Bends. ( Per Inch Dia / Ft / Length ) ( A ) Upto 1”Dia To 12” Dia 125 M.S.Pipe Accessories Work, Dismantling Of Bends, Tee, Reducder, Cross, Elbow, Nipple, Nozzle, Flanged, And Bends. ( Per Inch Dia / Ft / Length ( Ii. ) Above 12” Dia. 126 Fabrication Of Bends, Tee, Reducer Etc.- ( P.Inch Dia / Ft ) ( I ) Upto 1”Diato 12” Dia 127 Fabrication Of Bends, Tee, Reducer Etc.- ( P.Inch Dia / Ft ) ( Ii ) Above 12 Dia.. 128 Erection Of Bends, Tee Etc. ( Per Inch Dia / Ft / Length ) ( I ) Upto 1” Dia To 12” Dia 129 Erection Of Bends, Tee Etc. ( Per Inch Dia / Ft / Length ) Ii ) Above 12” Dia 130 Erection Of Valve 131 Dismantling Of Valves , ( Per Inch Dia / Ft / Length ) ( I ) Upto 1” Dia To 12” Dia 132 Dismantling Of Valves , ( Per Inch Dia / Ft / Length ( Ii ) Above 12” Dia 133 Plateform Work ( Per Sft ) 134 I ) Dismantling 135 Ii ) Fabrication And Ereection 136 A ) Patch Work With Old Material. 137 B ) Patch With New Material . 138 Purling In Work. ( Per Rft ) ( I ) Dismantling 139 Fabrication & Erection 140 Cutting Of Old Flange Repairing For Reuse & Fitting 141 Dis, Fabrication And Erection - 2 Repairing Of Belt Conveyor Roller 3 Dismantling, Fabrication, Erection Of Leak Proof Dampers At Pa, Sa, Fd & Id Fans 4 Dis, Fabrication And Erection Work Of Expansion Bellows At Fd, Id, Esp 5 M.S.Pipe Line Work 6 Steam Pipeline Work 7 Ducting Work 8 Strengthening Of Ducting Of Boiler. 9 Dis, Fab & Ere Of Airheater Expansion Bellow 10 Exhust Line Dismantling, Fabrication & Erection 11 Dis, Fabrication And Erection Of Id Fan Upper & Lower Casing 12 Weak Portion / Truff Replacement Work By M.S Plate Rbc, Mbc, Boiler 13 Dismantling, Fabrication & Erection Of Drum Type N Rotary Bagasse Feeder ( With Shalf ) N 14 Dismantling, Fabrication & Erection Of Screw Feeder 15 Dismantling, Fabrication & Erection Of Screw Feeder Casing. 16 Fabrication & Erection Of Man Hole 17 Dis., Fab & Erecting Of Aph Tubes ( Replacement ) 18 Dis, Fab & Erection Of R.O Plant Pressure Vessel Stand 19 Fab & Erection Of Fire Fighting Pipe Line Including N Valves, Bends, Flange & S Of Distance Piece
BOQ
| Name of Work:-Fabrication and Erection | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 0 | BOILER HOUSE | |||
| 2 | 1 | Repairing of belt conveyor roller | Job work | 1 | Rs. Per pcs |
| 3 | 2 | Dismantling, fabrication,erection of leak proof Dampers at PA, SA,FD & ID fans | Job work0 | 1 | Rs. L.S each |
| 4 | 3 | Dis, fabrication and erection work of expansion Bellows AT FD,ID,ESP | Job work1 | 1 | Rs. L.S each |
| 5 | 4 | M.S.Pipe line work | Job work3 | 1 | Rs. S. Rates |
| 6 | 5 | Steam pipeline work | Job work4 | 1 | Rs. SR X times |
| 7 | 6 | Ducting work | Job work5 | 1 | Rs. Sft. |
| 8 | 7 | Strengthening of ducting of boiler. | Job work6 | 1 | Rs. Psq.ft |
| 9 | 8 | Dis,Fab & Ere of AirHeater Expansion bellow | Job work7 | 1 | Rs. PRFT |
| 10 | 9 | Exhust line dismantling, fabrication & erection | Job work8 | 1 | Rs. PIDPF |
| 11 | 10 | Dis, fabrication and erection of ID Fan upper & Lower Casing | Job work9 | 1 | Rs. Each |
| 12 | 11 | Weak portion/ Truff replacement work by M.S plate RBC, MBC, Boiler | Job work10 | 1 | Rs. Per Sq. feet |
| 13 | 12 | Dismantling, Fabrication & Erection of Drum type \n Rotary Bagasse feeder (with shalf)\n | Job work11 | 1 | Rs. Lumpsum each |
| 14 | 13 | Dismantling, Fabrication & Erection of Screw feeder | Job work12 | 1 | Rs. Lumpsum each |
| 15 | 14 | Dismantling, Fabrication & Erection of Screw feeder Casing. | Job work13 | 1 | Rs. Lumpsum each |
| 16 | 15 | Fabrication & Erection of Man hole | Job work14 | 1 | Rs. Lumpsum each |
| 17 | 16 | Dis., Fab & Erecting of APH tubes (Replacement) | Job work15 | 1 | Rs. P. Tube |
| 18 | 17 | Dis, fab & Erection of R.O plant pressure vessel stand | Job work16 | 1 | L.S |
| 19 | 18 | Fab & Erection of fire fighting pipe line including \n Valves, bends, flange & support ( using new pipeline \n & old drum to drum tubes)\n | Job work17 | 1 | Rs. P.inch dia/ft. |
| 20 | 19 | Travelling grate front side ash discharge plate Dis, fab, \n & erection with structure \n | Job work18 | 1 | Rs. L.S |
| 21 | 20 | Fab & Erection of travelling grate rear plate flange Rs. L.S\n ( Flange type ) \n | Job work19 | 1 | Rs. L.S |
| 22 | 21 | BOILING HOUSE | Job work20 | 1 | Total |
| 23 | 22 | Platform work at various stations such as Mill house, Boiler, Turbine,cranes, Boiling house, C/F house etc. if required any where. | Job work21 | 1 | Rs. Schedule Rate , Dis- p.sq.ft, Fab& Erec- |
| 24 | 23 | Dismenling of electic motor | Job work22 | 1 | Rs. Per HP |
| 25 | 24 | Fitting of motor | Job work23 | 1 | Rs. Per HP |
| 26 | 25 | Repairing of exhaust valve | Job work24 | 1 | Rs. Per inch dia/pcs |
| 27 | 26 | Fab & Erection of double filteration system for quad & water inlet pipe in pan condenser. | Job work25 | 1 | Rs. each |
| 28 | 27 | Arrangement for lifting of vaccum filtered drums-3 nos | Job work26 | 1 | Rs. each |
| 29 | 28 | Replacement of exhaust and vapour valves in the boiling House. Dis | Job work27 | 1 | Dis- Rs. each valve |
| 30 | 29 | Replacement of exhaust and vapour valves in the boiling House Erec- | Job work28 | 1 | Erec- Rs. do- |
| 31 | 30 | Fabrication of electric motor cover. | Job work29 | 1 | Rs. each cover |
| 32 | 31 | Strengthening of vapour pipe inside & outside with angle iron rings/ M.S.plate. | Job work30 | 1 | Rs. each ring |
| 33 | 32 | Manhole work in Vapour pipes/Headers | Job work31 | 1 | Rs Lumpsum |
| 34 | 33 | Modification in Bagacillo chimney | Job work32 | 1 | Rs Lumpsum |
| 35 | 34 | Replacement of vapour pipe. Dis | Job work33 | 1 | Rs. p.inch dia |
| 36 | 35 | Exhaust and injection | Job work34 | 1 | Rs. pft. Length |
| 37 | 36 | Fab | Job work35 | 1 | Rs. pft. Length |
| 38 | 37 | Erec. | Job work36 | 1 | Rs. pft. Length |
| 39 | 38 | Replacement of V.pipe bends Dis | Job work37 | 1 | Rs. pft. Length |
| 40 | 39 | Exhaust & Injection bends Fab- | Job work38 | 1 | Rs. pft. Length |
| 41 | 40 | Exhaust & Injection bends Erec. | Job work39 | 1 | Rs. pft. Length |
| 42 | 41 | Dis,Fab & Ere of Final Molasses pipeline | Job work40 | 1 | Rs. PIDFT |
| 43 | 42 | Dis,Fab & Ere of suction pipe for injection,,CT pump | Job work41 | 1 | Rs. each |
| 44 | 43 | Fab & Erecdtion of M.S.vessels, square & rectangular tank | Job work42 | 1 | Rs. p. mtr3 |
| 45 | 44 | Increase of shell height with all the fitting and accessories Work. | Job work43 | 1 | Rs. p.feet sq. |
| 46 | 45 | Fab & Erection of M.S.plate work | Job work44 | 1 | Rs. p.sq.ft |
| 47 | 46 | Dis,Cleaning & Ere of pipeline (Juice,Massecuite,Srrup,Molasses etc) | Job work45 | 1 | Rs. PIDFT |
| 48 | 47 | Dis,Fab & Ere of Coil(water,juice,ammonia,so2etc) | Job work46 | 1 | Rs PIDFT |
| 49 | 48 | Fab and erection of Motor bed | Job work47 | 1 | Rs PHP |
| 50 | 49 | Dis,Fab & Ere of NRV for injection,turbine,sprayetc | Job work48 | 1 | Rs Each |
| 51 | 50 | Saveall of Pan,Quad DIS | Job work49 | 1 | Rs Each |
| 52 | 51 | Saveall of Pan,Quad FAB | Job work50 | 1 | Rs Each |
| 53 | 52 | Saveall of Pan,Quad ERE | Job work51 | 1 | Rs Each |
| 54 | 53 | Unloading of Material from Truck(MS,SS,CI,ACCetc) | Job work52 | 1 | Rs p.ton |
| 55 | 54 | Dis,Fab & Ere of Jay pipe | Job work53 | 1 | Rs Each pipe |
| 56 | 55 | Fitting of Baffle plates | Job work54 | 1 | Rs Perplate |
| 57 | 56 | Fabrication of belt conveyor | Job work55 | 1 | Rs. P. Ft length |
| 58 | 57 | Fab & Ere of entrainment Catcher. | Job work56 | 1 | Rs Each |
| 59 | 58 | Roofshed for SO2 Furnace and Vert. Crystalliser | Job work57 | 1 | Rs LS |
| 60 | 59 | Dismantling, fabrication & erection foot valve | Job work58 | 1 | Rs. Each/L.S |
| 61 | 60 | Clarifier coil work a) Dismentling | Job work59 | 1 | Rs. PIDPF |
| 62 | 61 | Clarifier coil work (b) Fabrication | Job work60 | 1 | Rs. PIDPF |
| 63 | 62 | Clarifier coil work ( c) Erection | Job work61 | 1 | Rs. PIDPF |
| 64 | 63 | Dismentling, fabrication & erection of Perforated M.S plates Of Direct contact juice heaters. | Job work62 | 1 | Rs. Each plate. |
| 65 | 64 | Dismentling , fabrication & erection of strainers of Injection, spray , C.T pumps. | Job work63 | 1 | Rs. each. |
| 66 | 65 | Dismentling , erection( with allignment) of planetary gear box of crystallizers. | Job work64 | 1 | Rs. Each. |
| 67 | 66 | Nozzles of spray pond, condenser. | Job work65 | 1 | Rs. |
| 68 | 67 | Dismantling (earh nozzle) | Job work66 | 1 | Rs. |
| 69 | 68 | Fitting (earh nozzle) | Job work67 | 1 | Rs. |
| 70 | 69 | Replacement of Double beat valve | Job work68 | 1 | Rs. Each |
| 71 | 70 | Fabrication of exhaust valve casing | Job work69 | 1 | Rs. Each |
| 72 | 71 | Opening & Fitting of Juice Heater Covers | Job work70 | 1 | Rs. Each |
| 73 | 72 | Dismantling & fitting of S.S Tubes in \n Juice Heater & Evaporator Body \n | Job work71 | 1 | Rs. Per Tube |
| 74 | 73 | Dismantling, Fabrication & Erection of \n Intercooler of Sulphur Furnace\n | Job work72 | 1 | Rs. Each |
| 75 | 74 | Fabrication & Erection cone of Syrup Sulphiter \n & its Recovery Tower\n | Job work73 | 1 | Rs. Per Sq. Feet |
| 76 | 75 | Dismantling, Fabrication & Erection of Mud Mixture \nConveyor\n | Job work74 | 1 | Rs. Lumpsum |
| 77 | 76 | Dismantling, Fabrication & Erection of Mud Mixture \nCasing\n | Job work75 | 1 | Rs. Lumpsum |
| 78 | 77 | Increasing the height of vertical crystallizer by 1.5 mtrs \nalongwith driving arrangement, platform, valve, pipe line\n& centre shaft complete in all respect\n | Job work76 | 1 | Rs. Each |
| 79 | 78 | Dismantling, fabrication & erection of down take umbrella \n of Pan\n | Job work77 | 1 | Rs. Each |
| 80 | 79 | Replacement of 3’’ coil of vertical crystallizer | Job work78 | 1 | Rs. PIDFT |
| 81 | 80 | Gutter Work (bigger side will be treated as dia.) | Job work79 | 1 | Rs. PIDFT |
| 82 | 81 | Gutter Work Dismantling | Job work80 | 1 | Rs. PIDFT |
| 83 | 82 | Gutter Work Fabrication | Job work81 | 1 | Rs. PIDFT |
| 84 | 83 | Gutter Work Erection | Job work82 | 1 | Rs. PIDFT |
| 85 | 84 | Two round welding work if required anywhere | Job work83 | 1 | Rs. P.R.FT |
| 86 | 85 | Jammed tube falling film Evaporator | Job work84 | 1 | Rs. Each Tube |
| 87 | 86 | Replacement of C.I cross | Job work85 | 1 | Rs. Each |
| 88 | 87 | Dismantling and Erection of sluice valve | Job work86 | 1 | Rs. PID pcs. |
| 89 | 88 | Fabrication / strenghting of beam, vessel, pipe, channel, \n angle etc.\n | Job work87 | 1 | Rs. P.R ft |
| 90 | 89 | Dismantling of old belt conveyor structure from \n Bagasse yard.\n | Job work88 | 1 | Rs. Lumpsum |
| 91 | 90 | Dismantling of pump | Job work89 | 1 | Rs. PID per pcs. |
| 92 | 91 | Erection and alignment of pump | Job work90 | 1 | Rs. PID per pcs. |
| 93 | 92 | Replacement of readymade bend | Job work91 | 1 | Rs. PID per pcs. |
| 94 | 93 | Replacement of ammonia pipe of pan & Quad | Job work92 | 1 | Rs. Each body |
| 95 | 94 | Replacing of .S.S coils of vacumm filter | Job work93 | 1 | Each |
| 96 | 95 | Replacing of worn out brass zig zags & S.S screens of \nVaccum Filter \n | Job work94 | 1 | each |
| 97 | 96 | Dismantling of M.S plate | Job work95 | 1 | Rs. P.sq. ft’ |
| 98 | 97 | Dismantling of Existing syrup sulphitor & shifting it\n To molasses tank \n | Job work96 | 1 | L.S |
| 99 | 98 | Dis., Fab & Erection of Save all cone of evaporator \n And pans \n | Job work97 | 1 | Each |
| 100 | 99 | Shifting of M.S fabricated tank | Job work98 | 1 | Rs. P.sq.ft |
| 101 | 100 | Dismantling installation and alignment of reduction \n Gear box. \n | Job work99 | 1 | each |
| 102 | 101 | Dismantling, Fab & erectioning of agitator | Job work100 | 1 | each |
| 103 | 102 | Repairing & assembling of complete sugar handing Rs. L.S\n System with stackers \n | Job work101 | 1 | L.S |
| 104 | 103 | BOILER/TURBINE, COOLING TOWER SUGAR GODOWN/WORKSHOP/STORE/CANE UNLOADER & FACTORY | Job work102 | 1 | total |
| 105 | 104 | Fab & Erection of gate | Job work103 | 1 | Rs each gate |
| 106 | 105 | Strengthning of tress beams,vessel,pipe\n with channel,angle,pipe etc any where\n | Job work104 | 1 | Rs. P.Rft |
| 107 | 106 | Roof sheets /ACC /Iron sheet work. Dis- | Job work105 | 1 | P. sheet |
| 108 | 107 | Roof sheets /ACC /Iron sheet work Repair- | Job work106 | 1 | P. sheet |
| 109 | 108 | Replacement & Erection | Job work107 | 1 | P. sheet |
| 110 | 109 | Fab & Erection of M.S.stair/Ladder a) single story \n\n | Job work108 | 1 | Rs. Lumpsum |
| 111 | 110 | Double story | Job work109 | 1 | Rs. Lumpsum |
| 112 | 111 | Cleaning of Cooling Tower water line | Job work110 | 1 | Rs. Lumpsum |
| 113 | 112 | Checking & Repairing of Cooling Tower \n Water line condenser to Cooling Tower\n | Job work111 | 1 | Rs. Lumpsum |
| 114 | 113 | Repair of hydraulic grab of cane unlaoder | Job work112 | 1 | Rs. Each |
| 115 | 114 | Replacement of square bar of cane unlaoder | Job work113 | 1 | per mtr. |
| 116 | 115 | Repairing and cleaning of cooling tower its nozzle | Job work114 | 1 | Rs. Lumpsum |
| 117 | 116 | MISC .ITEMS. | Job work115 | 1 | Total |
| 118 | 117 | M.S Pipeline per inch dia//ft/length (a ) Dismentling of pipe line. | Job work116 | 1 | TOTAL |
| 119 | 118 | Upto 1” dia to 12’ dai . | Job work117 | 1 | Rs. |
| 120 | 119 | Above 12” | Job work118 | 1 | Rs. |
| 121 | 120 | Fabrication of pipe line from M.S.plate or ready-made pipe any dia . | Job work119 | 1 | Rs. |
| 122 | 121 | Erection of pipe line per inch dia/ft/length (i) Upto 1’ dia to | Job work120 | 1 | Rs. |
| 123 | 122 | Erection of pipe line per inch dia/ft/length (ii. Above 12” dia | Job work121 | 1 | Rs. |
| 124 | 123 | M.S.Pipe accessories work, dismantling of bends, Tee, reducder, cross, elbow,nipple,nozzle, flanged, and bends. (per inch dia/ft/length ) (a) Upto 1”dia to 12” dia | Job work122 | 1 | Rs. |
| 125 | 124 | M.S.Pipe accessories work, dismantling of bends, Tee, reducder, cross, elbow,nipple,nozzle, flanged, and bends. (per inch dia/ft/length (ii.) Above 12” dia. | Job work123 | 1 | Rs. |
| 126 | 125 | Fabrication of bends, tee, reducer etc.-(p.inch dia/ft) (i) upto 1”diato 12” dia | Job work124 | 1 | Rs. |
| 127 | 126 | Fabrication of bends, tee, reducer etc.-(p.inch dia/ft) ( ii) above 12\" dia.. | Job work125 | 1 | Rs. |
| 128 | 127 | Erection of bends, tee etc.(per inch dia/ft/length) (i) upto 1” dia to 12” dia | Job work126 | 1 | Rs. |
| 129 | 128 | Erection of bends, tee etc.(per inch dia/ft/length) ii) Above 12” dia | Job work127 | 1 | Rs. |
| 130 | 129 | ERECTION OF VALVE | Job work128 | 1 | total |
| 131 | 130 | Dismantling of valves ,(per inch dia/ft/length) (i) Upto 1” dia to 12” dia | Job work129 | 1 | Rs. |
| 132 | 131 | Dismantling of valves ,(per inch dia/ft/length( ii) Above 12” dia | Job work130 | 1 | Rs. |
| 133 | 132 | PLATEFORM WORK (Per SFT) | Job work131 | 1 | total |
| 134 | 133 | I) Dismantling | Job work132 | 1 | Rs. |
| 135 | 134 | II) Fabrication and ereection | Job work133 | 1 | Rs. |
| 136 | 135 | a) Patch work with old material. | Job work134 | 1 | Rs. – per sq.ft |
| 137 | 136 | b) patch with new material . | Job work135 | 1 | Rs. – per sq.ft |
| 138 | 137 | Purling in work.(per RFT) (i) Dismantling | Job work136 | 1 | Rs. |
| 139 | 138 | Fabrication & Erection | Job work137 | 1 | Rs. |
| 140 | 139 | Cutting of old flange repairing for reuse & fitting | Job work138 | 1 | Rs. p.inch di/a Per pc |
| 141 | 140 | Dis, fabrication and erection of distance piece | Job work139 | 1 | Rs. PIDPF Length |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender