Haryana Sugar Federation-HSF has published Fabrication And Erection - 2 Repairing Of Belt Conveyor Roller 3 Dismantling, Fabrication,Erection Of Leak Proof Dampers At Pa, Sa,Fd & Id Fans 4 Dis, Fabrication And Erection Work Of Expansion Bellows At Fd,Id,Esp 5 M.S.Pipe Line Work 6 Steam Pipelin. Submission Date for this Tender is 14-06-2021. Screens and Feeding Equipments Tenders in SUGAR MILLS ROHTAK Haryana. Bidders can get complete Tender details and download the document.
Name of Work:-Fabrication and Erection | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 0 | BOILER HOUSE | |||
2 | 1 | Repairing of belt conveyor roller | Job work | 1 | Rs. Per pcs |
3 | 2 | Dismantling, fabrication,erection of leak proof Dampers at PA, SA,FD & ID fans | Job work0 | 1 | Rs. L.S each |
4 | 3 | Dis, fabrication and erection work of expansion Bellows AT FD,ID,ESP | Job work1 | 1 | Rs. L.S each |
5 | 4 | M.S.Pipe line work | Job work3 | 1 | Rs. S. Rates |
6 | 5 | Steam pipeline work | Job work4 | 1 | Rs. SR X times |
7 | 6 | Ducting work | Job work5 | 1 | Rs. Sft. |
8 | 7 | Strengthening of ducting of boiler. | Job work6 | 1 | Rs. Psq.ft |
9 | 8 | Dis,Fab & Ere of AirHeater Expansion bellow | Job work7 | 1 | Rs. PRFT |
10 | 9 | Exhust line dismantling, fabrication & erection | Job work8 | 1 | Rs. PIDPF |
11 | 10 | Dis, fabrication and erection of ID Fan upper & Lower Casing | Job work9 | 1 | Rs. Each |
12 | 11 | Weak portion/ Truff replacement work by M.S plate RBC, MBC, Boiler | Job work10 | 1 | Rs. Per Sq. feet |
13 | 12 | Dismantling, Fabrication & Erection of Drum type \n Rotary Bagasse feeder (with shalf)\n | Job work11 | 1 | Rs. Lumpsum each |
14 | 13 | Dismantling, Fabrication & Erection of Screw feeder | Job work12 | 1 | Rs. Lumpsum each |
15 | 14 | Dismantling, Fabrication & Erection of Screw feeder Casing. | Job work13 | 1 | Rs. Lumpsum each |
16 | 15 | Fabrication & Erection of Man hole | Job work14 | 1 | Rs. Lumpsum each |
17 | 16 | Dis., Fab & Erecting of APH tubes (Replacement) | Job work15 | 1 | Rs. P. Tube |
18 | 17 | Dis, fab & Erection of R.O plant pressure vessel stand | Job work16 | 1 | L.S |
19 | 18 | Fab & Erection of fire fighting pipe line including \n Valves, bends, flange & support ( using new pipeline \n & old drum to drum tubes)\n | Job work17 | 1 | Rs. P.inch dia/ft. |
20 | 19 | Travelling grate front side ash discharge plate Dis, fab, \n & erection with structure \n | Job work18 | 1 | Rs. L.S |
21 | 20 | Fab & Erection of travelling grate rear plate flange Rs. L.S\n ( Flange type ) \n | Job work19 | 1 | Rs. L.S |
22 | 21 | BOILING HOUSE | Job work20 | 1 | Total |
23 | 22 | Platform work at various stations such as Mill house, Boiler, Turbine,cranes, Boiling house, C/F house etc. if required any where. | Job work21 | 1 | Rs. Schedule Rate , Dis- p.sq.ft, Fab& Erec- |
24 | 23 | Dismenling of electic motor | Job work22 | 1 | Rs. Per HP |
25 | 24 | Fitting of motor | Job work23 | 1 | Rs. Per HP |
26 | 25 | Repairing of exhaust valve | Job work24 | 1 | Rs. Per inch dia/pcs |
27 | 26 | Fab & Erection of double filteration system for quad & water inlet pipe in pan condenser. | Job work25 | 1 | Rs. each |
28 | 27 | Arrangement for lifting of vaccum filtered drums-3 nos | Job work26 | 1 | Rs. each |
29 | 28 | Replacement of exhaust and vapour valves in the boiling House. Dis | Job work27 | 1 | Dis- Rs. each valve |
30 | 29 | Replacement of exhaust and vapour valves in the boiling House Erec- | Job work28 | 1 | Erec- Rs. do- |
31 | 30 | Fabrication of electric motor cover. | Job work29 | 1 | Rs. each cover |
32 | 31 | Strengthening of vapour pipe inside & outside with angle iron rings/ M.S.plate. | Job work30 | 1 | Rs. each ring |
33 | 32 | Manhole work in Vapour pipes/Headers | Job work31 | 1 | Rs Lumpsum |
34 | 33 | Modification in Bagacillo chimney | Job work32 | 1 | Rs Lumpsum |
35 | 34 | Replacement of vapour pipe. Dis | Job work33 | 1 | Rs. p.inch dia |
36 | 35 | Exhaust and injection | Job work34 | 1 | Rs. pft. Length |
37 | 36 | Fab | Job work35 | 1 | Rs. pft. Length |
38 | 37 | Erec. | Job work36 | 1 | Rs. pft. Length |
39 | 38 | Replacement of V.pipe bends Dis | Job work37 | 1 | Rs. pft. Length |
40 | 39 | Exhaust & Injection bends Fab- | Job work38 | 1 | Rs. pft. Length |
41 | 40 | Exhaust & Injection bends Erec. | Job work39 | 1 | Rs. pft. Length |
42 | 41 | Dis,Fab & Ere of Final Molasses pipeline | Job work40 | 1 | Rs. PIDFT |
43 | 42 | Dis,Fab & Ere of suction pipe for injection,,CT pump | Job work41 | 1 | Rs. each |
44 | 43 | Fab & Erecdtion of M.S.vessels, square & rectangular tank | Job work42 | 1 | Rs. p. mtr3 |
45 | 44 | Increase of shell height with all the fitting and accessories Work. | Job work43 | 1 | Rs. p.feet sq. |
46 | 45 | Fab & Erection of M.S.plate work | Job work44 | 1 | Rs. p.sq.ft |
47 | 46 | Dis,Cleaning & Ere of pipeline (Juice,Massecuite,Srrup,Molasses etc) | Job work45 | 1 | Rs. PIDFT |
48 | 47 | Dis,Fab & Ere of Coil(water,juice,ammonia,so2etc) | Job work46 | 1 | Rs PIDFT |
49 | 48 | Fab and erection of Motor bed | Job work47 | 1 | Rs PHP |
50 | 49 | Dis,Fab & Ere of NRV for injection,turbine,sprayetc | Job work48 | 1 | Rs Each |
51 | 50 | Saveall of Pan,Quad DIS | Job work49 | 1 | Rs Each |
52 | 51 | Saveall of Pan,Quad FAB | Job work50 | 1 | Rs Each |
53 | 52 | Saveall of Pan,Quad ERE | Job work51 | 1 | Rs Each |
54 | 53 | Unloading of Material from Truck(MS,SS,CI,ACCetc) | Job work52 | 1 | Rs p.ton |
55 | 54 | Dis,Fab & Ere of Jay pipe | Job work53 | 1 | Rs Each pipe |
56 | 55 | Fitting of Baffle plates | Job work54 | 1 | Rs Perplate |
57 | 56 | Fabrication of belt conveyor | Job work55 | 1 | Rs. P. Ft length |
58 | 57 | Fab & Ere of entrainment Catcher. | Job work56 | 1 | Rs Each |
59 | 58 | Roofshed for SO2 Furnace and Vert. Crystalliser | Job work57 | 1 | Rs LS |
60 | 59 | Dismantling, fabrication & erection foot valve | Job work58 | 1 | Rs. Each/L.S |
61 | 60 | Clarifier coil work a) Dismentling | Job work59 | 1 | Rs. PIDPF |
62 | 61 | Clarifier coil work (b) Fabrication | Job work60 | 1 | Rs. PIDPF |
63 | 62 | Clarifier coil work ( c) Erection | Job work61 | 1 | Rs. PIDPF |
64 | 63 | Dismentling, fabrication & erection of Perforated M.S plates Of Direct contact juice heaters. | Job work62 | 1 | Rs. Each plate. |
65 | 64 | Dismentling , fabrication & erection of strainers of Injection, spray , C.T pumps. | Job work63 | 1 | Rs. each. |
66 | 65 | Dismentling , erection( with allignment) of planetary gear box of crystallizers. | Job work64 | 1 | Rs. Each. |
67 | 66 | Nozzles of spray pond, condenser. | Job work65 | 1 | Rs. |
68 | 67 | Dismantling (earh nozzle) | Job work66 | 1 | Rs. |
69 | 68 | Fitting (earh nozzle) | Job work67 | 1 | Rs. |
70 | 69 | Replacement of Double beat valve | Job work68 | 1 | Rs. Each |
71 | 70 | Fabrication of exhaust valve casing | Job work69 | 1 | Rs. Each |
72 | 71 | Opening & Fitting of Juice Heater Covers | Job work70 | 1 | Rs. Each |
73 | 72 | Dismantling & fitting of S.S Tubes in \n Juice Heater & Evaporator Body \n | Job work71 | 1 | Rs. Per Tube |
74 | 73 | Dismantling, Fabrication & Erection of \n Intercooler of Sulphur Furnace\n | Job work72 | 1 | Rs. Each |
75 | 74 | Fabrication & Erection cone of Syrup Sulphiter \n & its Recovery Tower\n | Job work73 | 1 | Rs. Per Sq. Feet |
76 | 75 | Dismantling, Fabrication & Erection of Mud Mixture \nConveyor\n | Job work74 | 1 | Rs. Lumpsum |
77 | 76 | Dismantling, Fabrication & Erection of Mud Mixture \nCasing\n | Job work75 | 1 | Rs. Lumpsum |
78 | 77 | Increasing the height of vertical crystallizer by 1.5 mtrs \nalongwith driving arrangement, platform, valve, pipe line\n& centre shaft complete in all respect\n | Job work76 | 1 | Rs. Each |
79 | 78 | Dismantling, fabrication & erection of down take umbrella \n of Pan\n | Job work77 | 1 | Rs. Each |
80 | 79 | Replacement of 3’’ coil of vertical crystallizer | Job work78 | 1 | Rs. PIDFT |
81 | 80 | Gutter Work (bigger side will be treated as dia.) | Job work79 | 1 | Rs. PIDFT |
82 | 81 | Gutter Work Dismantling | Job work80 | 1 | Rs. PIDFT |
83 | 82 | Gutter Work Fabrication | Job work81 | 1 | Rs. PIDFT |
84 | 83 | Gutter Work Erection | Job work82 | 1 | Rs. PIDFT |
85 | 84 | Two round welding work if required anywhere | Job work83 | 1 | Rs. P.R.FT |
86 | 85 | Jammed tube falling film Evaporator | Job work84 | 1 | Rs. Each Tube |
87 | 86 | Replacement of C.I cross | Job work85 | 1 | Rs. Each |
88 | 87 | Dismantling and Erection of sluice valve | Job work86 | 1 | Rs. PID pcs. |
89 | 88 | Fabrication / strenghting of beam, vessel, pipe, channel, \n angle etc.\n | Job work87 | 1 | Rs. P.R ft |
90 | 89 | Dismantling of old belt conveyor structure from \n Bagasse yard.\n | Job work88 | 1 | Rs. Lumpsum |
91 | 90 | Dismantling of pump | Job work89 | 1 | Rs. PID per pcs. |
92 | 91 | Erection and alignment of pump | Job work90 | 1 | Rs. PID per pcs. |
93 | 92 | Replacement of readymade bend | Job work91 | 1 | Rs. PID per pcs. |
94 | 93 | Replacement of ammonia pipe of pan & Quad | Job work92 | 1 | Rs. Each body |
95 | 94 | Replacing of .S.S coils of vacumm filter | Job work93 | 1 | Each |
96 | 95 | Replacing of worn out brass zig zags & S.S screens of \nVaccum Filter \n | Job work94 | 1 | each |
97 | 96 | Dismantling of M.S plate | Job work95 | 1 | Rs. P.sq. ft’ |
98 | 97 | Dismantling of Existing syrup sulphitor & shifting it\n To molasses tank \n | Job work96 | 1 | L.S |
99 | 98 | Dis., Fab & Erection of Save all cone of evaporator \n And pans \n | Job work97 | 1 | Each |
100 | 99 | Shifting of M.S fabricated tank | Job work98 | 1 | Rs. P.sq.ft |
101 | 100 | Dismantling installation and alignment of reduction \n Gear box. \n | Job work99 | 1 | each |
102 | 101 | Dismantling, Fab & erectioning of agitator | Job work100 | 1 | each |
103 | 102 | Repairing & assembling of complete sugar handing Rs. L.S\n System with stackers \n | Job work101 | 1 | L.S |
104 | 103 | BOILER/TURBINE, COOLING TOWER SUGAR GODOWN/WORKSHOP/STORE/CANE UNLOADER & FACTORY | Job work102 | 1 | total |
105 | 104 | Fab & Erection of gate | Job work103 | 1 | Rs each gate |
106 | 105 | Strengthning of tress beams,vessel,pipe\n with channel,angle,pipe etc any where\n | Job work104 | 1 | Rs. P.Rft |
107 | 106 | Roof sheets /ACC /Iron sheet work. Dis- | Job work105 | 1 | P. sheet |
108 | 107 | Roof sheets /ACC /Iron sheet work Repair- | Job work106 | 1 | P. sheet |
109 | 108 | Replacement & Erection | Job work107 | 1 | P. sheet |
110 | 109 | Fab & Erection of M.S.stair/Ladder a) single story \n\n | Job work108 | 1 | Rs. Lumpsum |
111 | 110 | Double story | Job work109 | 1 | Rs. Lumpsum |
112 | 111 | Cleaning of Cooling Tower water line | Job work110 | 1 | Rs. Lumpsum |
113 | 112 | Checking & Repairing of Cooling Tower \n Water line condenser to Cooling Tower\n | Job work111 | 1 | Rs. Lumpsum |
114 | 113 | Repair of hydraulic grab of cane unlaoder | Job work112 | 1 | Rs. Each |
115 | 114 | Replacement of square bar of cane unlaoder | Job work113 | 1 | per mtr. |
116 | 115 | Repairing and cleaning of cooling tower its nozzle | Job work114 | 1 | Rs. Lumpsum |
117 | 116 | MISC .ITEMS. | Job work115 | 1 | Total |
118 | 117 | M.S Pipeline per inch dia//ft/length (a ) Dismentling of pipe line. | Job work116 | 1 | TOTAL |
119 | 118 | Upto 1” dia to 12’ dai . | Job work117 | 1 | Rs. |
120 | 119 | Above 12” | Job work118 | 1 | Rs. |
121 | 120 | Fabrication of pipe line from M.S.plate or ready-made pipe any dia . | Job work119 | 1 | Rs. |
122 | 121 | Erection of pipe line per inch dia/ft/length (i) Upto 1’ dia to | Job work120 | 1 | Rs. |
123 | 122 | Erection of pipe line per inch dia/ft/length (ii. Above 12” dia | Job work121 | 1 | Rs. |
124 | 123 | M.S.Pipe accessories work, dismantling of bends, Tee, reducder, cross, elbow,nipple,nozzle, flanged, and bends. (per inch dia/ft/length ) (a) Upto 1”dia to 12” dia | Job work122 | 1 | Rs. |
125 | 124 | M.S.Pipe accessories work, dismantling of bends, Tee, reducder, cross, elbow,nipple,nozzle, flanged, and bends. (per inch dia/ft/length (ii.) Above 12” dia. | Job work123 | 1 | Rs. |
126 | 125 | Fabrication of bends, tee, reducer etc.-(p.inch dia/ft) (i) upto 1”diato 12” dia | Job work124 | 1 | Rs. |
127 | 126 | Fabrication of bends, tee, reducer etc.-(p.inch dia/ft) ( ii) above 12" dia.. | Job work125 | 1 | Rs. |
128 | 127 | Erection of bends, tee etc.(per inch dia/ft/length) (i) upto 1” dia to 12” dia | Job work126 | 1 | Rs. |
129 | 128 | Erection of bends, tee etc.(per inch dia/ft/length) ii) Above 12” dia | Job work127 | 1 | Rs. |
130 | 129 | ERECTION OF VALVE | Job work128 | 1 | total |
131 | 130 | Dismantling of valves ,(per inch dia/ft/length) (i) Upto 1” dia to 12” dia | Job work129 | 1 | Rs. |
132 | 131 | Dismantling of valves ,(per inch dia/ft/length( ii) Above 12” dia | Job work130 | 1 | Rs. |
133 | 132 | PLATEFORM WORK (Per SFT) | Job work131 | 1 | total |
134 | 133 | I) Dismantling | Job work132 | 1 | Rs. |
135 | 134 | II) Fabrication and ereection | Job work133 | 1 | Rs. |
136 | 135 | a) Patch work with old material. | Job work134 | 1 | Rs. – per sq.ft |
137 | 136 | b) patch with new material . | Job work135 | 1 | Rs. – per sq.ft |
138 | 137 | Purling in work.(per RFT) (i) Dismantling | Job work136 | 1 | Rs. |
139 | 138 | Fabrication & Erection | Job work137 | 1 | Rs. |
140 | 139 | Cutting of old flange repairing for reuse & fitting | Job work138 | 1 | Rs. p.inch di/a Per pc |
141 | 140 | Dis, fabrication and erection of distance piece | Job work139 | 1 | Rs. PIDPF Length |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail