Fabrication And Erection - 2 Repairing Of Belt Conveyor Roller 3 Dismantling, Fabrication,Erection Of Leak Proof Dampers At Pa, Sa,Fd & Id Fans 4 Dis, Fabrication And Erection Work Of Expansion Bellows At Fd,Id,Esp 5 M.S.Pipe Line Work 6 Steam Pipelin, SUGAR MILLS ROHTAK-Haryana

Haryana Sugar Federation-HSF has published Fabrication And Erection - 2 Repairing Of Belt Conveyor Roller 3 Dismantling, Fabrication,Erection Of Leak Proof Dampers At Pa, Sa,Fd & Id Fans 4 Dis, Fabrication And Erection Work Of Expansion Bellows At Fd,Id,Esp 5 M.S.Pipe Line Work 6 Steam Pipelin. Submission Date for this Tender is 14-06-2021. Screens and Feeding Equipments Tenders in SUGAR MILLS ROHTAK Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

28123679
Fabrication And Erection - 2 Repairing Of Belt Conveyor Roller 3 Dismantling, Fabrication,Erection Of Leak Proof Dampers At Pa, Sa,Fd & Id Fans 4 Dis, Fabrication And Erection Work Of Expansion Bellows At Fd,Id,Esp 5 M.S.Pipe Line Work 6 Steam Pipelin
Open Tender
Indian
Haryana
SUGAR MILLS ROHTAK
14-06-2021

Tender Details

Fabrication And Erection - 2 Repairing Of Belt Conveyor Roller 3 Dismantling, Fabrication, Erection Of Leak Proof Dampers At Pa, Sa, Fd & Id Fans 4 Dis, Fabrication And Erection Work Of Expansion Bellows At Fd, Id, Esp 5 M.S.Pipe Line Work 6 Steam Pipeline Work 7 Ducting Work 8 Strengthening Of Ducting Of Boiler. 9 Dis, Fab & Ere Of Airheater Expansion Bellow 10 Exhust Line Dismantling, Fabrication & Erection 11 Dis, Fabrication And Erection Of Id Fan Upper & Lower Casing 12 Weak Portion / Truff Replacement Work By M.S Plate Rbc, Mbc, Boiler 13 Dismantling, Fabrication & Erection Of Drum Type N Rotary Bagasse Feeder ( With Shalf ) N 14 Dismantling, Fabrication & Erection Of Screw Feeder 15 Dismantling, Fabrication & Erection Of Screw Feeder Casing. 16 Fabrication & Erection Of Man Hole 17 Dis., Fab & Erecting Of Aph Tubes ( Replacement ) 18 Dis, Fab & Erection Of R.O Plant Pressure Vessel Stand 19 Fab & Erection Of Fire Fighting Pipe Line Including N Valves, Bends, Flange & S - 2 Repairing Of Belt Conveyor Roller 3 Dismantling, Fabrication, Erection Of Leak Proof Dampers At Pa, Sa, Fd & Id Fans 4 Dis, Fabrication And Erection - 2 Repairing Of Belt Conveyor Roller 3 Dismantling, Fabrication, Erection Of Leak Proof Dampers At Pa, Sa, Fd & Id Fans 4 Dis, Fabrication And Erection Work Of Expansion Bellows At Fd, Id, Esp 5 M.S.Pipe Line Work 6 Steam Pipeline Work 7 Ducting Work 8 Strengthening Of Ducting Of Boiler. 9 Dis, Fab & Ere Of Airheater Expansion Bellow 10 Exhust Line Dismantling, Fabrication & Erection 11 Dis, Fabrication And Erection Of Id Fan Upper & Lower Casing 12 Weak Portion / Truff Replacement Work By M.S Plate Rbc, Mbc, Boiler 13 Dismantling, Fabrication & Erection Of Drum Type N Rotary Bagasse Feeder ( With Shalf ) N 14 Dismantling, Fabrication & Erection Of Screw Feeder 15 Dismantling, Fabrication & Erection Of Screw Feeder Casing. 16 Fabrication & Erection Of Man Hole 17 Dis., Fab & Erecting Of Aph Tubes ( Replacement ) 18 Dis, Fab & Erection Of R.O Plant Pressure Vessel Stand 19 Fab & Erection Of Fire Fighting Pipe Line Including N Valves, Bends, Flange & S Work Of Expansion Bellows At Fd, Id, Esp 5 M.S.Pipe Line Work 6 Steam Pipeline Work 7 Ducting Work 8 Strengthening Of Ducting Of Boiler. 9 Dis, Fab & Ere Of Airheater Expansion Bellow 10 Exhust Line Dismantling, Fabrication & Erection 11 Dis, Fabrication And Erection - 2 Repairing Of Belt Conveyor Roller 3 Dismantling, Fabrication, Erection Of Leak Proof Dampers At Pa, Sa, Fd & Id Fans 4 Dis, Fabrication And Erection Work Of Expansion Bellows At Fd, Id, Esp 5 M.S.Pipe Line Work 6 Steam Pipeline Work 7 Ducting Work 8 Strengthening Of Ducting Of Boiler. 9 Dis, Fab & Ere Of Airheater Expansion Bellow 10 Exhust Line Dismantling, Fabrication & Erection 11 Dis, Fabrication And Erection Of Id Fan Upper & Lower Casing 12 Weak Portion / Truff Replacement Work By M.S Plate Rbc, Mbc, Boiler 13 Dismantling, Fabrication & Erection Of Drum Type N Rotary Bagasse Feeder ( With Shalf ) N 14 Dismantling, Fabrication & Erection Of Screw Feeder 15 Dismantling, Fabrication & Erection Of Screw Feeder Casing. 16 Fabrication & Erection Of Man Hole 17 Dis., Fab & Erecting Of Aph Tubes ( Replacement ) 18 Dis, Fab & Erection Of R.O Plant Pressure Vessel Stand 19 Fab & Erection Of Fire Fighting Pipe Line Including N Valves, Bends, Flange & S Of Id Fan Upper & Lower Casing 12 Weak Portion / Truff Replacement Work By M.S Plate Rbc, Mbc, Boiler 13 Dismantling, Fabrication & Erection Of Drum Type N Rotary Bagasse Feeder ( With Shalf ) N 14 Dismantling, Fabrication & Erection Of Screw Feeder 15 Dismantling, Fabrication & Erection Of Screw Feeder Casing. 16 Fabrication & Erection Of Man Hole 17 Dis., Fab & Erecting Of Aph Tubes ( Replacement ) 18 Dis, Fab & Erection Of R.O Plant Pressure Vessel Stand 19 Fab & Erection Of Fire Fighting Pipe Line Including N Valves, Bends, Flange & Support ( Using New Pipeline N & Old Drum To Drum Tubes ) N 20 Travelling Grate Front Side Ash Discharge Plate Dis, Fab, N & Erection With Structure N 21 Fab & Erection Of Travelling Grate Rear Plate Flange Rs. L.S N ( Flange Type ) N 22 Boiling House 23 Platform Work At Various Stations Such As Mill House, Boiler, Turbine, Cranes, Boiling House, C / F House Etc. If Required Any Where. 24 Dismenling Of Electic Motor 25 Fitting Of Motor 26 Repairing Of Exhaust Valve 27 Fab & Erection Of Double Filteration System For Quad & Water Inlet Pipe In Pan Condenser. 28 Arrangement For Lifting Of Vaccum Filtered Drums-3 Nos 29 Replacement Of Exhaust And Vapour Valves In The Boiling House. Dis 30 Replacement Of Exhaust And Vapour Valves In The Boiling House Erec- 31 Fabrication Of Electric Motor Cover. 32 Strengthening Of Vapour Pipe Inside & Outside With Angle Iron Rings / M.S.Plate. 33 Manhole Work In Vapour Pipes / Headers 34 Modification In Bagacillo Chimney 35 Replacement Of Vapour Pipe. Dis 36 Exhaust And Injection 37 Fab 38 Erec. 39 Replacement Of V.Pipe Bends Dis 40 Exhaust & Injection Bends Fab- 41 Exhaust & Injection Bends Erec. 42 Dis, Fab & Ere Of Final Molasses Pipeline 43 Dis, Fab & Ere Of Suction Pipe For Injection, , Ct Pump 44 Fab & Erecdtion Of M.S.Vessels, Square & Rectangular Tank 45 Increase Of Shell Height With All The Fitting And Accessories Work. 46 Fab & Erection Of M.S.Plate Work 47 Dis, Cleaning & Ere Of Pipeline ( Juice, Massecuite, Srrup, Molasses Etc ) 48 Dis, Fab & Ere Of Coil ( Water, Juice, Ammonia, So2etc ) 49 Fab And Erection Of Motor Bed 50 Dis, Fab & Ere Of Nrv For Injection, Turbine, Sprayetc 51 Saveall Of Pan, Quad Dis 52 Saveall Of Pan, Quad Fab 53 Saveall Of Pan, Quad Ere 54 Unloading Of Material From Truck ( Ms, Ss, Ci, Accetc ) 55 Dis, Fab & Ere Of Jay Pipe 56 Fitting Of Baffle Plates 57 Fabrication Of Belt Conveyor 58 Fab & Ere Of Entrainment Catcher. 59 Roofshed For So2 Furnace And Vert. Crystalliser 60 Dismantling, Fabrication & Erection Foot Valve 61 Clarifier Coil Work A ) Dismentling 62 Clarifier Coil Work ( B ) Fabrication 63 Clarifier Coil Work ( C ) Erection 64 Dismentling, Fabrication & Erection Of Perforated M.S Plates Of Direct Contact Juice Heaters. 65 Dismentling , Fabrication & Erection Of Strainers Of Injection, Spray , C.T Pumps. 66 Dismentling , Erection ( With Allignment ) Of Planetary Gear Box Of Crystallizers. 67 Nozzles Of Spray Pond, Condenser. 68 Dismantling ( Earh Nozzle ) 69 Fitting ( Earh Nozzle ) 70 Replacement Of Double Beat Valve 71 Fabrication Of Exhaust Valve Casing 72 Opening & Fitting Of Juice Heater Covers 73 Dismantling & Fitting Of S.S Tubes In N Juice Heater & Evaporator Body N 74 Dismantling, Fabrication & Erection Of N Intercooler Of Sulphur Furnace N 75 Fabrication & Erection Cone Of Syrup Sulphiter N & Its Recovery Tower N 76 Dismantling, Fabrication & Erection Of Mud Mixture Nconveyor N 77 Dismantling, Fabrication & Erection Of Mud Mixture Ncasing N 78 Increasing The Height Of Vertical Crystallizer By 1.5 Mtrs Nalongwith Driving Arrangement, Platform, Valve, Pipe Line N& Centre Shaft Complete In All Respect N 79 Dismantling, Fabrication & Erection Of Down Take Umbrella N Of Pan N 80 Replacement Of 3’’ Coil Of Vertical Crystallizer 81 Gutter Work ( Bigger Side Will Be Treated As Dia. ) 82 Gutter Work Dismantling 83 Gutter Work Fabrication 84 Gutter Work Erection 85 Two Round Welding Work If Required Anywhere 86 Jammed Tube Falling Film Evaporator 87 Replacement Of C.I Cross 88 Dismantling And Erection Of Sluice Valve 89 Fabrication / Strenghting Of Beam, Vessel, Pipe, Channel, N Angle Etc. N 90 Dismantling Of Old Belt Conveyor Structure From N Bagasse Yard. N 91 Dismantling Of Pump 92 Erection And Alignment Of Pump 93 Replacement Of Readymade Bend 94 Replacement Of Ammonia Pipe Of Pan & Quad 95 Replacing Of .S.S Coils Of Vacumm Filter 96 Replacing Of Worn Out Brass Zig Zags & S.S Screens Of Nvaccum Filter N 97 Dismantling Of M.S Plate 98 Dismantling Of Existing Syrup Sulphitor & Shifting It N To Molasses Tank N 99 Dis., Fab & Erection Of Save All Cone Of Evaporator N And Pans N 100 Shifting Of M.S Fabricated Tank 101 Dismantling Installation And Alignment Of Reduction N Gear Box. N 102 Dismantling, Fab & Erectioning Of Agitator 103 Repairing & Assembling Of Complete Sugar Handing Rs. L.S N System With Stackers N 104 Boiler / Turbine, Cooling Tower Sugar Godown / Workshop / Store / Cane Unloader & Factory 105 Fab & Erection Of Gate 106 Strengthning Of Tress Beams, Vessel, Pipe N With Channel, Angle, Pipe Etc Any Where N 107 Roof Sheets / Acc / Iron Sheet Work. Dis- 108 Roof Sheets / Acc / Iron Sheet Work Repair- 109 Replacement & Erection 110 Fab & Erection Of M.S.Stair / Ladder A ) Single Story N N 111 Double Story 112 Cleaning Of Cooling Tower Water Line 113 Checking & Repairing Of Cooling Tower N Water Line Condenser To Cooling Tower N 114 Repair Of Hydraulic Grab Of Cane Unlaoder 115 Replacement Of Square Bar Of Cane Unlaoder 116 Repairing And Cleaning Of Cooling Tower Its Nozzle 117 Misc .Items. 118 M.S Pipeline Per Inch Dia / / Ft / Length ( A ) Dismentling Of Pipe Line. 119 Upto 1” Dia To 12’ Dai . 120 Above 12” 121 Fabrication Of Pipe Line From M.S.Plate Or Ready-Made Pipe Any Dia . 122 Erection Of Pipe Line Per Inch Dia / Ft / Length ( I ) Upto 1’ Dia To 123 Erection Of Pipe Line Per Inch Dia / Ft / Length ( Ii. Above 12” Dia 124 M.S.Pipe Accessories Work, Dismantling Of Bends, Tee, Reducder, Cross, Elbow, Nipple, Nozzle, Flanged, And Bends. ( Per Inch Dia / Ft / Length ) ( A ) Upto 1”Dia To 12” Dia 125 M.S.Pipe Accessories Work, Dismantling Of Bends, Tee, Reducder, Cross, Elbow, Nipple, Nozzle, Flanged, And Bends. ( Per Inch Dia / Ft / Length ( Ii. ) Above 12” Dia. 126 Fabrication Of Bends, Tee, Reducer Etc.- ( P.Inch Dia / Ft ) ( I ) Upto 1”Diato 12” Dia 127 Fabrication Of Bends, Tee, Reducer Etc.- ( P.Inch Dia / Ft ) ( Ii ) Above 12 Dia.. 128 Erection Of Bends, Tee Etc. ( Per Inch Dia / Ft / Length ) ( I ) Upto 1” Dia To 12” Dia 129 Erection Of Bends, Tee Etc. ( Per Inch Dia / Ft / Length ) Ii ) Above 12” Dia 130 Erection Of Valve 131 Dismantling Of Valves , ( Per Inch Dia / Ft / Length ) ( I ) Upto 1” Dia To 12” Dia 132 Dismantling Of Valves , ( Per Inch Dia / Ft / Length ( Ii ) Above 12” Dia 133 Plateform Work ( Per Sft ) 134 I ) Dismantling 135 Ii ) Fabrication And Ereection 136 A ) Patch Work With Old Material. 137 B ) Patch With New Material . 138 Purling In Work. ( Per Rft ) ( I ) Dismantling 139 Fabrication & Erection 140 Cutting Of Old Flange Repairing For Reuse & Fitting 141 Dis, Fabrication And Erection - 2 Repairing Of Belt Conveyor Roller 3 Dismantling, Fabrication, Erection Of Leak Proof Dampers At Pa, Sa, Fd & Id Fans 4 Dis, Fabrication And Erection Work Of Expansion Bellows At Fd, Id, Esp 5 M.S.Pipe Line Work 6 Steam Pipeline Work 7 Ducting Work 8 Strengthening Of Ducting Of Boiler. 9 Dis, Fab & Ere Of Airheater Expansion Bellow 10 Exhust Line Dismantling, Fabrication & Erection 11 Dis, Fabrication And Erection Of Id Fan Upper & Lower Casing 12 Weak Portion / Truff Replacement Work By M.S Plate Rbc, Mbc, Boiler 13 Dismantling, Fabrication & Erection Of Drum Type N Rotary Bagasse Feeder ( With Shalf ) N 14 Dismantling, Fabrication & Erection Of Screw Feeder 15 Dismantling, Fabrication & Erection Of Screw Feeder Casing. 16 Fabrication & Erection Of Man Hole 17 Dis., Fab & Erecting Of Aph Tubes ( Replacement ) 18 Dis, Fab & Erection Of R.O Plant Pressure Vessel Stand 19 Fab & Erection Of Fire Fighting Pipe Line Including N Valves, Bends, Flange & S Of Distance Piece

Key Value

Document Fees
INR 100 /-
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail