27/2021-2022 Mace Of Rwss To Poovar-Karichal - Rectification Of Leakages Of Pipe Line For One Year Rc-2021-2022
Tender Value
15.81 Lakhs
Estimated cost
Bid Submission
15 Jun 2021
0 days left
EMD
23800
Bank guarantee accepted
Document Fee
2500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Neyyattinkara → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
27/2021-2022 Mace Of Rwss To Poovar-Karichal - Rectification Of Leakages Of Pipe Line For One Year Rc-2021-2022
BOQ
| Work Name: Mace of RWSS to Poovar-Karichal - Rectification of leakages of pipe line for one year RC-2021-2022 | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | AC pipe leak - Up to 1.5M | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.01 | Repairing leakage/breakage of 80 mm AC pipe line by cutting and dismantling the damaged pipe portion (up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints. | BI01010001010000000000000515BI0100001113 | 10 | Leak |
| 3 | 1.02 | -DO- 100 MM AC Pipe | BI01010001010000000000000515BI0100001114 | 3 | Leak |
| 4 | 1.03 | -DO- 150MM AC Pipe | BI01010001010000000000000515BI0100001115 | 5 | Leak |
| 5 | 1.04 | -DO- 200MM AC Pipe | BI01010001010000000000000515BI0100001116 | 5 | Leak |
| 6 | 2 | AC pipe leak - Up to 3M | BI01010001010000000000000515BI0100001117 | ||
| 7 | 2.01 | Repairing leakage/breakage of 80 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 3.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints. | BI01010001010000000000000515BI0100001118 | 6 | Leak |
| 8 | 2.02 | -DO- 100 MM AC Pipe | BI01010001010000000000000515BI0100001119 | 3 | Leak |
| 9 | 2.03 | -DO- 150MM AC Pipe | BI01010001010000000000000515BI0100001120 | 7 | Leak |
| 10 | 2.04 | -DO- 200MM AC Pipe | BI01010001010000000000000515BI0100001121 | 5 | Leak |
| 11 | 3 | AC pipe leak - Up to 5M and above | BI01010001010000000000000515BI0100001122 | ||
| 12 | 3.01 | Repairing leakage/breakage of 80 mm AC pipe line by cutting and dismantling the damaged pipe portion Up to 5.0m and above length( in the case of length exceeded above 5M, the exceeded quantities if any shall be measured as concerned items items in this schedule) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints. | BI01010001010000000000000515BI0100001123 | 3 | Leak |
| 13 | 3.02 | -DO- 100 MM AC Pipe | BI01010001010000000000000515BI0100001124 | 2 | Leak |
| 14 | 3.03 | -DO- 150MM AC Pipe | BI01010001010000000000000515BI0100001125 | 1 | Leak |
| 15 | 3.04 | -DO- 200MM AC Pipe | BI01010001010000000000000515BI0100001126 | 2 | Leak |
| 16 | 4 | PVC Pipe - Socket Jointing | BI01010001010000000000000515BI0100001127 | ||
| 17 | 4.01 | Leak rectification work in 32 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. | BI01010001010000000000000515BI0100001128 | 3 | Leak |
| 18 | 4.02 | -DO- 40MM PVC Pipe | BI01010001010000000000000515BI0100001129 | 3 | Leak |
| 19 | 4.03 | -DO- 50MM PVC Pipe | BI01010001010000000000000515BI0100001130 | 8 | Leak |
| 20 | 4.04 | -DO- 63MM PVC Pipe | BI01010001010000000000000515BI0100001131 | 40 | Leak |
| 21 | 4.05 | -DO- 75MM PVC Pipe | BI01010001010000000000000515BI0100001132 | 40 | Leak |
| 22 | 4.06 | -DO- 90MM PVC Pipe | BI01010001010000000000000515BI0100001133 | 20 | Leak |
| 23 | 5 | PVC Pipe - Socket & CIR Jointing | BI01010001010000000000000515BI0100001134 | ||
| 24 | 5.01 | Leak rectification work in 90 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing. | BI01010001010000000000000515BI0100001135 | 15 | Leak |
| 25 | 5.02 | -DO- 110MM PVC Pipe | BI01010001010000000000000515BI0100001136 | 4 | Leak |
| 26 | 5.03 | -DO- 160MM PVC Pipe | BI01010001010000000000000515BI0100001137 | 15 | Leak |
| 27 | 5.04 | -DO- 200MM PVC Pipe | BI01010001010000000000000515BI0100001138 | 15 | Leak |
| 28 | 6 | LEAK RECTIFICATION IN CI PIPES with hemp and lead wool | BI01010001010000000000000515BI0100001139 | ||
| 29 | 6.01 | Rectification of minor joint leakages in 150mm CI Pipe including earth work excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged lead wool, conveying and inserting hemp and lead wool and caulking after cleaning the ends, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc. complete. | BI01010001010000000000000515BI0100001140 | 1 | Leak |
| 30 | 6.02 | -DO- 200MM C I Pipe | BI01010001010000000000000515BI0100001141 | 2 | Leak |
| 31 | 6.03 | -DO- 250MM C I Pipe | BI01010001010000000000000515BI0100001142 | 1 | Leak |
| 32 | 6.04 | -DO- 300MM C I Pipe | BI01010001010000000000000515BI0100001143 | 1 | Leak |
| 33 | 7 | LEAK RECTIFICATION IN CI PIPES with CID joint / suitable mechanical joint | BI01010001010000000000000515BI0100001144 | ||
| 34 | 7.01 | Rectification of leakages in 200mm CI Pipe of all kinds by replacing a length up to 1.5m including earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting and removing and stacking the damaged portion from the existing line without causing any damages to the line and specials and conveying and replacing with the CI pipe and conveying and jointing with CID joint / suitable mechanical joint of suitable size or any other available size suitable joints after cleaning the ends, grinding if necessary, centering the pipe inserting the joints tightening to make a water tight joint charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing,providing caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete. | BI01010001010000000000000515BI0100001145 | 1 | Leak |
| 35 | 7.02 | -DO- 300MM C I Pipe | BI01010001010000000000000515BI0100001146 | 1 | Leak |
| 36 | 8 | LEAK RECTIFICATION IN GI PIPES | BI01010001010000000000000515BI0100001147 | ||
| 37 | 8.01 | Rectification of leakages of 32 mm, 40mm & 50mm GI Pipes by replacing lengths up to 1.0m including earth work excavation in all kindss of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete. | BI01010001010000000000000515BI0100001148 | 2 | Leak |
| 38 | 8.02 | -DO- 65MM G I Pipe | BI01010001010000000000000515BI0100001149 | 1 | Leak |
| 39 | 8.03 | -DO- 80MM G I Pipe | BI01010001010000000000000515BI0100001150 | 2 | Leak |
| 40 | 8.04 | -DO- 100MM G I Pipe | BI01010001010000000000000515BI0100001151 | 5 | Leak |
| 41 | 8.05 | -DO- 125MM G I Pipe | BI01010001010000000000000515BI0100001152 | 2 | Leak |
| 42 | 9 | LEAK RECTIFICATION IN GI EXPOSED PIPES | BI01010001010000000000000515BI0100001153 | ||
| 43 | 9.01 | Rectification of leakages of 100 mm GI Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete. | BI01010001010000000000000515BI0100001154 | 3 | Leak |
| 44 | 9.02 | -DO- 125MM G I Pipe | BI01010001010000000000000515BI0100001155 | 2 | Leak |
| 45 | 9.03 | -DO- 150MM G I Pipe | BI01010001010000000000000515BI0100001156 | 2 | Leak |
| 46 | 10 | Rectifying the leakages in vertical pipe of public tap connection including earth work excavation in all kinds of soil for exposing the pipeline including concrete / tar cutting,cutting and removing damaged portion of pipe, fixing new 20/25 mm GI pipe and specials in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and specials and as per the direction of departmental officers etc. complete. | BI01010001010000000000000515BI0100001157 | 18 | Leak |
| 47 | 11 | Rectifying the leakages in boring point of public tap connection including earth work excavation in all kinds of soil for exposing the boring point including concrete / tar cutting, dismantling the damaged saddle piece,cutting and removing damaged portion of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete. | BI01010001010000000000000515BI0100001158 | 15 | Leak |
| 48 | 12 | Supplying and fixing 15 / 20 mm PVC public tap after dismantling the damaged tap including all cost of materials, labour charges, hire for tools and as per the direction of the department officers etc complete. | BI01010001010000000000000515BI0100001159 | 15 | Nos |
| 49 | 13 | Leak rectification work in all classes and all sizes of AC/GI/CI/DI pipes and 75 mm and above PVC pipes of all classes including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting, concrete cutting, rectifying leakage with saddle piece and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20 cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of departmental officers including the cost of PVC/MS/GI saddle piece. Saddle piece shall be of good quality and conforming to relevant standards: Providing Saddle piece Details of Cost for Rectification of One Leak. | BI01010001010000000000000515BI0100001160 | 15 | No |
| 50 | 14 | APP: F: Miscellaneous Items | BI01010001010000000000000515BI0100001161 | ||
| 51 | 14.01 | Washing OHSR/GLSR using brooms, brushes and bleaching powder by engaging coolies, scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab and columns, disposing the the slurry / waste materilas away from the immediate premises and within the initial lead of 50m from the periphery of the tank, without causing any damage to the exististing strucutre and installations, charges including the operation of valves, conveyance and hire charges of tools and as per the direction of the department officers etc. complete. | BI01010001010000000000000515BI0100001162 | 2328.8 | sqm |
| 52 | 14.02 | Removing the silt, mud and slushy soil from the gallery and disposing the same from the gallery with in a distance of 100 m without causing any damage to the existing structure and installations including hire and conveyance charges of tools etc complete as per the direction of the department officers etc. | BI01010001010000000000000515BI0100001163 | 650 | sqm |
| 53 | 14.03 | Charges for cleaning valve chamber and protection tube after dismantling the heavy type RCCcover slab and disposing the slushy soil 50 mt away from the chamber | BI01010001010000000000000515BI0100001164 | 6 | No |
| 54 | 14.04 | Charges for dismantling 150 mm 350 mm CI valve, lock nut, spindle, shutter, welding the shutter increasing the thickness of the spindle suitable for the valve and making new lock nut and charges for lath work and resetting the same in correct position etc complete. | BI01010001010000000000000515BI0100001165 | 8 | No |
| 55 | 14.05 | Charges for dismantling 80mm 125 mm CI valve, lock nut, spindle, shutter, welding the shutter increasing the thickness of the spindle suitable for the valve and making new lock nut and charges for lath work and resetting the same in correct position etc complete. | BI01010001010000000000000515BI0100001166 | 8 | No |
| 56 | 14.06 | Rectification the leakage in various size of valves in the distribution line and pumping main including hire for tools etc. complete including cost of specials. | BI01010001010000000000000515BI0100001167 | 5 | No |
| 57 | 14.07 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidatingeach deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :All kinds of soil (Ref. Item No. 2.10.1 of DSR) | BI01010001010000000000000515BI0100001168 | 4 | cum |
| 58 | 14.08 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001169 | 5 | cum |
| 59 | 14.09 | Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | BI01010001010000000000000515BI0100001170 | 20 | cum |
| 60 | 14.1 | Demolishing the existing RR masonry for the rectification of leakages if necessary and reconstruction of the same in C.M. 1:6 after the rectification work including cost of cement etc complete. | BI01010001010000000000000515BI0100001171 | 5 | cum |
| 61 | 14.11 | Supply ,stacking,spreading and consolidating of Quarry Muck in the trench of pipe line, including carriage, loading ,unloading & stacking up to any lead. | BI01010001010000000000000515BI0100001172 | 5 | cum |
| 62 | 14.12 | Supply ,stacking,spreading and consolidating of Red earth in the trench of pipe line for cushion including carriage, loading ,unloading & stacking up to any lead. | BI01010001010000000000000515BI0100001173 | 15 | cum |
| 63 | 14.13 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | BI01010001010000000000000515BI0100001174 | 1000 | sqm |
| 64 | 14.14 | Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | BI01010001010000000000000515BI0100001175 | 20 | hour |
| 65 | 14.15 | Disconnecting water connection from service mains along Concrete road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete. | BI01010001010000000000000515BI0100001176 | 15 | Disconnection |
| 66 | 14.16 | Disconnection/re connection of water connection exposed portion of service line including cost of all labour charges and necessary specials etc complete as per the direction of departmental officers. | BI01010001010000000000000515BI0100001177 | 5 | No |
| 67 | 14.17 | Lifting submersible pumpset with suction pipe from the Bore well/Tube well/open well with pulley block and tripod leg etc after disconnecting the power supply, removing cables NRV,CI sluice valve without making any damages to the pump set,pipe,valves and other mechanical units whenever required including hire charges of tripod,pulley block and all other equipment etc complete as per the direction of the Departmental officers | BI01010001010000000000000515BI0100001178 | 1 | No |
| 68 | 14.18 | Erecting submersible pumpset with suction pipe in the Bore well/Tube well/open well with pully block and tripod leg etc and reconnecting power connection ,Jointing the cables from the starter, Jointing the NRV,CI sluice valve,delivery line using required IR sheet,nut and bolts whenever required including hire charges of tripod,pulley block and all other equipment and cost of IR sheet,nut and bolt etc complete as per the direction of the Departmental officers | BI01010001010000000000000515BI0100001179 | 1 | No |
| 69 | 14.19 | Man mazdoor for operating the sluice valve/ GM valve up to 400 mm size already fixed in the valve chamber, exposed surface of Distribution lines and 700 mm DI/ CI distribution main interconnection valves including charges for opening, closing the vale and monitoring the water availability in pipe line etc complete as per the direction of departmental officers. | BI01010001010000000000000515BI0100001180 | 275 | Day |
| 70 | 14.2 | Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009) | BI01010001010000000000000515BI0100001181 | 30 | metre |
| 71 | 15 | APP: G: Supply of materials | BI01010001010000000000000515BI0100001182 | ||
| 72 | 15.01 | Supplying 200 mm CID joint all class | BI01010001010000000000000515BI0100001183 | 24 | set |
| 73 | 15.02 | Supplying 150 mm CID joint all class | BI01010001010000000000000515BI0100001184 | 40 | set |
| 74 | 15.03 | Supplying 100 mm CID joint all class | BI01010001010000000000000515BI0100001185 | 16 | set |
| 75 | 15.04 | Supplying 80 mm CID joint all class | BI01010001010000000000000515BI0100001186 | 56 | set |
| 76 | 15.05 | Supplying 200 mm CIR joint | BI01010001010000000000000515BI0100001187 | 40 | set |
| 77 | 15.06 | Supplying 160 mm CIR joint all class | BI01010001010000000000000515BI0100001188 | 44 | set |
| 78 | 15.07 | Supplying 110 mm CIR joint all class | BI01010001010000000000000515BI0100001189 | 8 | set |
| 79 | 15.08 | Supplying 90 mm CIR joint | BI01010001010000000000000515BI0100001190 | 40 | set |
| 80 | 15.09 | Supply of PVC Pipe, 6kg/cm2, 90mm Dia. | BI01010001010000000000000515BI0100001191 | 35 | metre |
| 81 | 15.1 | Supply of PVC Pipe, 6kg/cm2, 110mm Dia. | BI01010001010000000000000515BI0100001192 | 25 | metre |
| 82 | 15.11 | Supply of PVC Pipe, 6kg/cm2, 160mm Dia. | BI01010001010000000000000515BI0100001193 | 35 | metre |
| 83 | 15.12 | Supply of PVC Pipe, 6kg/cm2, 200mm Dia. | BI01010001010000000000000515BI0100001194 | 30 | metre |
| 84 | 15.13 | Supply of PVC Coupling 90mm, 8 kg/cm2 | BI01010001010000000000000515BI0100001195 | 62 | No |
| 85 | 15.14 | PVC Coupling 110mm, 8 kg/cm2 | BI01010001010000000000000515BI0100001196 | 16 | No |
| 86 | 15.15 | Supply of PVC Coupling 160mm, 8 kg/cm2 | BI01010001010000000000000515BI0100001197 | 46 | No |
| 87 | 15.16 | Supply of PVC Coupling 200mm, 8 kg/cm2 | BI01010001010000000000000515BI0100001198 | 24 | No |
AI Tender Summary
Tender Timeline
Jun 08, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedJun 15, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJun 18, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender