32/2021-2022 Jal-Jeevan Mission 2020-21-Providing Fhtcs To House Holds Through Retrofitting And Replacement Of Old Ac Pipes 1000 M From Pambukaala To Poovar Road . ( Phase2 ) Reach -2 And Giving 325 Nos Fhtcs In Poovar
Tender Overview
Project Description
32/2021-2022 Jal-Jeevan Mission 2020-21-Providing Fhtcs To House Holds Through Retrofitting And Replacement Of Old Ac Pipes 1000 M From Pambukaala To Poovar Road . ( Phase2 ) Reach -2 And Giving 325 Nos Fhtcs In Poovar
BOQ
| Work Name: Jal-Jeevan mission 2020-21-Providing FHTCS to house holds through retrofitting and Replacement of old AC pipes 1000 m from Pambukaala to Poovar road. ( phase-2) reach -2 and giving 325 nos FHTCS in Poovar Panchayat | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | APP.B. AC REPLACEMENT | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.001 | Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | BI01010001010000000000000515BI0100001113 | 45 | cum |
| 3 | 1.002 | Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffice diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | BI01010001010000000000000515BI0100001114 | 800 | metre |
| 4 | 1.003 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | BI01010001010000000000000515BI0100001115 | 10 | cum |
| 5 | 1.004 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidatingeach deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :All kinds of soil (Ref. Item No. 2.10.1 of DSR) | BI01010001010000000000000515BI0100001116 | 432 | cum |
| 6 | 1.005 | Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009) | BI01010001010000000000000515BI0100001117 | 750 | metre |
| 7 | 1.006 | Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 140 mm nominal outer dia pipes. | BI01010001010000000000000515BI0100001118 | 800 | metre |
| 8 | 1.007 | Taking connection from 160/140/110 /90 to /75/63/50/40/32 mm or nearest size.PVC/GI distribution main a<br>branch line using suitable equal Tee(suitable class),reducer, CID/CIR and reducers including cost of materials labor charge etc complete.<br> | BI01010001010000000000000515BI0100001119 | 25 | No |
| 9 | 1.008 | \"Conveying and fixing C.I. sluice valves (with cap) by providing complete with bolts, nuts, rubber insertions etc. excluding the cost of valve (the tail pieces if required will be paid separately) :125 mm diameter. Class I\"Data derived from item no.18.31.2.1 of DAR | BI01010001010000000000000515BI0100001120 | 2 | Nos |
| 10 | 1.009 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001121 | 90 | cum |
| 11 | 1.01 | Alteration/ Making re connection with the existing water connection /SF connection-Alteration using 20mm Indian Standard Class 6 uPVC pipe and uPVC / Brass specials viz. brass ferrule, Elbow, MTA(Brass Threaded,), FTA(Brass Threaded,), couplers etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, safely removing & re-fixing existing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges as per the directions of the department officers. | BI01010001010000000000000515BI0100001122 | 550 | Nos |
| 12 | 1.011 | Supply PVC Pipe, 10kg/cm2, 140mm Dia. | BI01010001010000000000000515BI0100001123 | 800 | metre |
| 13 | 1.012 | Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 125mm. | BI01010001010000000000000515BI0100001124 | 2 | No |
| 14 | 1.013 | flanges for Tail piece (Tail piece included in the specials) | BI01010001010000000000000515BI0100001125 | 4 | No |
| 15 | 1.014 | Providing 15mm PVC Tap in the water meter assembly for 15mm connection, using 20mm Indian Standard Class 6 uPVC pipes and specials including cost of materials, consumables, hire charges for tools and labour charges etc. complete and as per the direction of departmental officers. | BI01010001010000000000000515BI0100001126 | 325 | Nos |
| 16 | 1.015 | Providing 15mm (1/2 inch) house connection with 15mm (1/2 inch) water meter from existing PVC / HDPE mains up to 110 mm dia., up to a length of 5 m using 20mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule, GM full way wheel valve, Elbow, MTA, FTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges, including the cost of tested Class B Multijet water meter with ISI mark and weather resistant PP / PE meter box of minimum size 300mm x 200mm x 150mm, but excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers. | BI01010001010000000000000515BI0100001127 | 325 | Nos |
| 17 | 1.016 | Providing additional length of house connection pipe using 20 mm (1/2 inch) PE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PN16 specials and testing the joints etc., by trenching and refilling in all kinds of soil with trench of average cross section 0.3m x 0.75m for laying of connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc., including cost of materials, hire for tools, cost of consumables and labour charges etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads etc., and as per the directions of the department officers. | BI01010001010000000000000515BI0100001128 | 3000 | metre |
| 18 | 1.017 | Providing additional length of house connection pipe using 20 mm (1/2 inch) PE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PN16 specials and testing the joints etc., by trenching and refilling in all kinds of soil with trench of average cross section 0.3m x 0.75m for laying of connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc., including cost of\nmaterials, hire for tools, cost of consumables and labour charges etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads etc., and as per the directions of the department officers | BI01010001010000000000000515BI0100001129 | 1250 | metre |
| 19 | 1.018 | Application fee and connection fee for Providing FHTC | BI01010001010000000000000515BI0100001130 | 325 | No |
| 20 | 1.019 | Feasibility assessment,geotaging uptodation of GIS map in the provided soft copy of the base map. Actual number of Functional House hold tap connection(FHTC) will fully depend upon this feasibility study. The house hold tap connection must be functional while having minimum storage of water in the service reservoir. The hard copies ( 3 sets in appropriate color, in laminated sheets ) and soft copies in CD to be submitted after execution of this work ( The available GIS maps as it is & where it is condition will be provided for the contractor for uptodation of submitted of GIS map) as per direction of dept. officials. | BI01010001010000000000000515BI0100001131 | 825 | No |
| 21 | 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | BI01010001010000000000000515BI0100001132 | 4.395 | cum |
| 22 | 1.021 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | BI01010001010000000000000515BI0100001133 | 0.339 | cum |
| 23 | 1.022 | Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | BI01010001010000000000000515BI0100001134 | 10.8 | sqm |
| 24 | 1.023 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001135 | 2.564 | cum |
| 25 | 1.024 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | BI01010001010000000000000515BI0100001136 | 192 | Kg |
| 26 | 1.025 | Cost of PVC specials (Bends,Tee,coupler, Tailpiece,end caps etc )3% cost of pipe. | BI01010001010000000000000515BI0100001137 | 753320 | L.S |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.