Supply And Installation Of Flue Gas Desulphurisation System At Kstps Kota
Tender Overview
Project Description
Supply And Installation Of Flue Gas Desulphurisation System At Kstps Kota
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 29-Jul-2021 | Date_Corrigendum_I | Date | 16-Aug-2021 |
| 2 | 03-Aug-2021 | Techno_commercial_Amendment | Technical Bid | 16-Aug-2021 |
| 3 | 16-Aug-2021 | Date_Corrigendum_II | Date | 26-Aug-2021 |
BOQ
| Name of Work: EPC Package for Supply and Installation of Wet Flue Gas Desulphurisation (FGD) system for KSTPS, Unit#5 (1X210 MW), 6 & 7 (2X195 MW) Kota | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | KOTA SUPER THERMAL POWER STATION (KSTPS) Unit#5 (1X210 MW), 6 & 7 (2X195 MW) KOTA | |||
| 2 | 1.1 | SCHEDULE NO. 1:- Plant and Equipment including Type Test Charges, Mandatory Spares and Transportation (PART-A of FIRST CONTRACT) | |||
| 3 | 1.11 | Main Equipment: Lumpsum Supply Prices of complete Plant & Equipment (Mechanical, Electrical and Control & Instrumentation items etc.) including Factory Fabricated Steel Structure for Flue Gas Desulphurisation System Package including Special Tools & Tackles and Type Test charges | |||
| 4 | 1.12 | FGD System | item1 | 15 | Lot |
| 5 | 1.13 | Limestone and Gypsum Handling System | item2 | 62 | Lot |
| 6 | 1.14 | Items related to Chimney | item3 | 43 | Lot |
| 7 | 1.15 | Any Other (Please Specify) | item4 | 43 | Lot |
| 8 | 1.2 | Lumpsum Supply Prices For MANDATORY SPARES (As specified in Annexure-1.5 of Vol-II, Section-1 of General Technical Specifications) | item5 | 43 | Lot |
| 9 | 1.3 | Lumpsum Charges towards Local Transportation and Inland Transit Insurance including Port Handling Charges, Port Clearances and other Port Charges/costs incidental to delivery of Plant & Equipment including Mandatory Spares to Power Plant site | |||
| 10 | 1.31 | FGD System | item6 | 15 | Lot |
| 11 | 1.32 | Limestone and Gypsum Handling System | item7 | 62 | Lot |
| 12 | 1.33 | Item related to Chimney | item8 | 43 | Lot |
| 13 | 1.34 | Mandatory Spares | item9 | 62 | Lot |
| 14 | 1.35 | Any Other (Please Specify) | item10 | 43 | Lot |
| 15 | 1.4 | SCHEDULE NO. 2:- Installation Services including SCE Insurance (other than transit insurance (PART-B of FIRST CONTRACT) | |||
| 16 | 1.41 | Lumpsum Prices towards Erection, Testing, Integration & Hooking Up of the FGD System, Commissioning and conducting PG test including, Handling & Storage at site in respect of all material supplied under PART-A of FIRST CONTRACT. Quoted prices include prices towards Storage cum Erection insurance (including PG Test & to cover period up to handing over of the plant) and Insurance towards Civil works and other services as specified in the bidding Documents excluding Inland Transit Insurance already covered under Schedule 1 above. | item11 | 15 | Lot |
| 17 | 1.5 | SCHEDULE NO. 3:- Civil, Structural & Architectural works (PART-C of FIRST CONTRACT) | |||
| 18 | 1.51 | Lumpsum Prices towards Civil & Architectural works portion (Including Construction material, Cement and Labour etc.) including Design & Engineering works related to construction works for all the required buildings, foundations and super-structures for the FGD System. | item12 | 15 | Lot |
| 19 | 1.52 | Lumpsum Prices towards Structural Steel works portion including cost of material, fabrication and erection including Design & Engineering works related to Structural Steel works for the FGD System. | item13 | 15 | Lot |
| 20 | 1.6 | Total of Schedule (Schedule 1 + Schedule 2 + Schedule 3) for KSTPS Kota Project | item72 | 1 | Non |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender