| 1 | Maintenance contract for LAN and RFM service at DVC, RTPS for a period of two(02) years |
| 2 | System administrator cum site in-charge |
| 3 | Desktop troubleshooting & support |
| 4 | LAN troubleshooting & maintenance support |
| 5 | Laying of CAT-6 cable including supply of PVC Conduits/ casing. Rate is on Per meter basis. CAT-6 cable shall be supplied by DVC |
| 6 | Fixing of 9U Rack & Installation of L2- Switch, UPS, patch panel & other passive components like LIU, Patch cords, cable manager, adapter, adapter plates, pigtails. Supply of material is under DVC\"s scope |
| 7 | Repairing of various Ethernet joints with supply of connectors without compromising performance. |
| 8 | Replacement of defective/damaged cards/parts of servers, UPS & switches (Rate is for service related to replacement only; the required spares will be arranged by DVC on case to case basis). Such spares are to be listed out and to be provided to DVC. |
| 9 | Troubleshooting/ fault detecting of optical network with testing equipment, general & special tools. |
| 10 | Overhead laying of 6 cores SM outdoor OFC: The overhead cable should pass through HDPE pipes for protection of the OFC. Clamping of HDPE pipes at regular interval of 20 meters along the existing cable tray located in different places of the plant. Note: The quantity mentioned is tentative and the payment shall be made based on actual measurement, and bidder has to consider cutting /wastage etc for which no extra payment shall be made. HDPE pipe shall be provided by DVC. All other associated materials are to be supplied by the bidder. |
| 11 | Fixing & Installation of I/O box and termination of CAT6 cable at both ends including supply of complete I/O box set. Commissioning with patch panel & switch. |
| 12 | Punching of CAT-6 cables with RJ-45 connectors including supply of connectors. |
| 13 | Replacement of defective power or signal cords and otheraccessories (Rate is for service related to replacement only; the actual cost of spares will be borne by DVC on case to case basis). |
| 14 | Outdoor splicing of 6 core Single Mode OFC with supply of PVC enclosures and termination marker (The rate is for six (06) core fiber cable) |
| 15 | Repairing of switches, UPS, servers and passive components. The extent of damage will be inspected jointly. The nature of repair will be decided based on joint inspection and on actual defect basis (Rate is for service related to replacement only; the required spares will be arranged by DVC on case to case basis). Such spares are to be listed out and to be provided to DVC. |
| 16 | For new/existing Indoor splicing of 6 core Single Mode OFC (The rate is per core basis) |
| 17 | Underground laying of 6 cores SM outdoor OFC: Earth cutting, sand packing, under Ground Laying (digging & filling of Soft Soil). After laying OFC, brick lying & backfilling with earth etc. to be done properly. Note: The quantity mentioned is tentative and the payment shall be made based on actual measurement, and bidder has to consider cutting /wastage etc for which no extra payment shall be made. Route Markers to be laid at intervals of 10 meters. HDPE pipe shall be provided by DVC. All other associated materials are to be supplied by the bidder |