Supplying, Installing And Commissioning Of Standard Rain Gauge 2 Supplying, Installing and Commissioning of Autographic Rain gauge Stations (325 cm2 collector pan) on site as per specifications mention in HIS manual & IS Code (5235-1992) excluding all taxes etc and complete as directed by Engineer incharge. Mode of Measurements :- The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier. 3 Supplying, Installing and Commissioning of Wind Vane on site as per specifications IS Code (5799-1970) excluding all taxes etc and complete as directed by Engineer incharge Mode of Measurements :- The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier. 4 Supplying, Installing and Commissioning of Anemometer Cup Counter on site as per specifications mention in HIS manual & IS Code (5912-1997) excluding all taxes etc and complete as directed by Engineer incharge Mode of Measurements :-The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier. 5 Supplying, Installing and Commissioning of Pan Evaporimeter on site as per specifications 6 Supplying, Installing and Commissioning of Minimum Thermometer on site as per specifications IS Code (7000-1973) excluding all taxes etc and complete as directed by Engineer incharge. Mode of Measurements :-The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier. 7 Supplying, Installing and Commissioning of Maximum Thermometer on site as per specifications IS Code (7000-1973) excluding all taxes etc and complete as directed by Engineer incharge. Mode of Measurements :-The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier 8 Supplying, Installing and Commissioning of Dry Bulb Thermometer on site as per specifications IS Code (5725-1970) excluding all taxes etc and complete as directed by Engineer incharge. Mode of Measurements :-The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier. 9 Supplying, Installing and Commissioning of Wet Bulb Thermometer on sites per 10 Supplying, Installing and Commissioning of Thermo-hygrograph on site as per specifications mention in HIS manual & IS Code (5973-1998) excluding all taxes etc and complete as directed by Engineer incharge. Mode of Measurements :-The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier. 11 Supplying, Installing and Commissioning of Thermograph on site as per specifications mention in HIS manual & IS Code (15901-1970)excluding all taxes etc and complete as directed by Engineer incharge. Mode of Measurements :-The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier 12 Supplying, Installing and Commissioning of Hygrograph on site as per specifications mention in HIS manual & IS Code (5900-1970) excluding all taxes etc and complete as directed by Engineer incharge. Mode of Measurements :-The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier. 13 Supplying, Installing and Commissioning of Sunshine Recorder on site as per 14 Supplying, Installing and Commissioning of Double Stevenson’s Screen Box with complete as directed by Engineer incharge. Assembly (Metal Stand) on site as per specifications mention in HIS manual & IS Code (5948-1970) excluding all taxes etc and complete as directed by Engineer incharge. Mode of Measurements :-The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier. 15 Supplying, Installing and Commissioning of Single Stevenson’s Screen Box with complete as directed by Engineer incharge. Assembly (Metal Stand) on site as per specifications mention in HIS manual & IS Code (5948-1970)excluding all taxes etc and complete as directed by Engineer incharge. Mode of Measurements :-The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier. 16 Supplying, Installing and Commissioning of Autographic Water Level Recorder (AWLR) with complete as directed by Engineer incharge. Assembly on site as per specifications IS Code (9116-2002) excluding all taxes etc and complete as directed by Engineer incharge. Mode of Measurements :-The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier. 17 Supplying ARG graphs of size as below on site as per specifications IS Code (5947-1970) 18 Supplying, Installing and Commissioning of Beaded Wire on site as per specifications ISO 16650-2004(en) excluding all taxes etc and complete as directed by Engineer incharge. Mode of Measurements :-The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier. 19 Supplying Graphs as below on site as per specifications IS Code (5947-1970) excluding all taxes etc and complete as directed by Engineer incharge. (A)Thermo-hygrograph (B)Thermograph (C)Hygrograph (D)Sunshine Recorder Graph – Long Curved (E)Sunshine Recorder Graph – Medium Curved (F)Sunshine Recorder Graph – Short Curved Mode of Measurements :- Theunit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier. 20 Supplying red ink bottles (10 ml) for ARG, Thermo-hygrograph, thermograph, hygrograph on site as per specifications IS Code (5947-1970) excluding all taxes etc and complete as directed by Engineer in charge Mode of Measurements :- The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier 21 Supplying thermometer with its iron stand for measuring pan water temperature on site as 22 Supplying glycerine bottles 100ml to check evaporation of red ink for ARG, Thermohygrograph, thermograph, hygrograph on site as per specifications IS Code (1796-1986) excluding all taxes etc and complete as directed by Engineer incharge. Mode of Measurements :-The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier 23 Supplying wooden platforms painted with 2 coats of white paint over primer for Pan Evaporimeter on site as per specifications IS Code (5973-1998) excluding all taxes etc and complete as directed by Engineer incharge Mode of Measurements :-The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier. 24 Supplying algaecide solution bottles 100ml for cleaning Pan Evaporimeter to remove algae on site as per specifications IS Code (14634-1999) excluding all taxes etc and complete as directed by Engineer incharge. Mode of Measurements :- The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier. 26 Supplying wiremesh cover for Pan Evaporimeter on site as per specifications IS Code (5973-1998) excluding all taxes etc and complete as directed by Engineer incharge Mode of Measurements :-The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier. 27 Supplying mechanical clocks for ARG on site as per specifications IS Code (5924-1988) excluding all taxes etc and complete as directed by Engineer incharge. Mode of Measurements :-The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier. 28 Supplying Measuring Cylinder ( Glass) for SRG on site as per specifications IS Code (4849-1992) excluding all taxes etc And complete as directed by Engineer incharge. Mode of Measurements :- The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier. 29 Supplying Measuring Cylinder for Pan Evaporimeter on site as per specifications IS Code (5973-1998) excluding all taxes etc And complete as directed by Engineer incharge. Mode of Measurements :- The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. 30 Supplying AWLR Graph (Daily) on site as per specifications IS Code (5947-1970) excluding all taxes etc And complete as directed by Engineer incharge. Mode of Measurements :-The unit of item for measurement is number The item will be measured as per supplied numbers. The payment will be made on number Basis. The supplier should carry out supply, installation commissioning and testing of instrument. Before installation of instrument, instruments should be calibrated. Original calibration report should be produced with each instrument. The charges of calibration will be paid by supplier.