Name of Work: MW (P) to Sabha Mantapa & Sub Shrine at Virupaksha Temple at Hampi.
Sl.No.
Item Description
Item Code / Make
Quantity
Units
1
1
Sub Heading 1
2
1.01
Removal of Cement concrete over the existing ancient flooring slabs and disposing the unwanted stuff to a distance of 1 to 2 Kilometers from the Work spot (Near West side of the Krishna Temple) etc., complete.
item1
166.16
Cum
3
1.02
Carefully Removal of props, steps and Brick masonry and platforms constructed in size stone masonry and stacking the useful materials and disposing the unwanted material away from the site etc., complete
item2
44.86
Cum
4
1.03
Carefully removal of existing dead lime concrete consisting of brick bats and stocking the useful materials and disposing the debris out side the site area including cost of disposing the same away from the monument for the distance of 1 to 2 kilometer (West side of the Krishna Temple)
item3
35.81
cum
5
1.04
Dismantling the out of plumb, roof slabs, beam, capital, pillars etc., with the help of High Skilled labour, mechanical equipment, hydraulic machinery chainpully block and derric pole after proper documentation like numbering etc., complete.
item4
65.09
cum
6
1.05
Providing fresh granite stone beam, capital and pillar including cost of dressing charges as per original and erection charges with the help of chainpully, derric pole, High skilled labourers etc., complete.
item5
9.18
cum
7
1.06
Reconstruction of the dismantled architecture members by using the hydraulic machineries, chainpully block derric pole where ever necessary depending the dimension of the stone architectural members carefully without causing any damage to it further re erecting the members to the original alignment with reference to the bench mark available at site with the help of the total station survey instrument after necessary cleaning the architectural members with sailable detergent and water etc., complete as per the direction of the Conservation Assistant
item6
65.09
cum
8
1.07
Removing the existing uneven/undulated flooring slabs and keeping them away at a distance for resue etc., complete.
item7
830.81
Sqm
9
1.08
Removal of earthwork excavation to a depth of 10 to 12 cms average for laying of lime concrete for fixing of the stons slabs etc., complete.
item8
166.16
cum
10
1.09
Providing bed concrete in Lime mortar for uniform flooring of ratio 1:1:1 for fixing of the stone flooring slabs
item9
83.08
cum
11
1.1
Resetting the dismantled undulated flooring slabs in its original by providing necessary slope for easy discharge of rain water and easy movement of visitors by levelling the slabs by providing necessary gravel bed etc., complete
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.