| 1 | 1 | Survey of H.T. & L.T. cable route as per instruction of the site engineer and submission of route survey drawing incribing different land marks | BI01010001010000000000000515BI0100001113 | 300 | Mtr |
|---|
| 2 | 2 | Excavation of soil for making of trial hole (Min size 1.1 X 0.5 X 1.2 m depth) as per instruction of the site engineer including backfilling of excavated soil | BI01010001010000000000000515BI0100001115 | 1.32 | Cum |
|---|
| 3 | 3 | Excavation of soil along the existing cable route for formation of cable trenches along with the uprooting of protactive covers in the existing trenches & reinstatement of same cable trenches with excavated soil after erection of protective covers | BI01010001010000000000000515BI0100001116 | 12 | Cum |
|---|
| 4 | 4 | Excavation of soil for formation of cable trenches & reinstatement of same cable trenches with excavated soil as per direction of Site Engineer | BI01010001010000000000000515BI0100001117 | 20 | Cum |
|---|
| 5 | 5 | Laying and dressing of 33 KV 3X400 sqmm XLPE Cable in the excavated cable trenches as per instruction of Site Engineer | BI01010001010000000000000515BI0100001118 | 60 | MTR |
|---|
| 6 | 6 | Making & arrangement of Straight Through Joint including making of Joint Pit of 33 KV 3X400 sqmm XLPE Cable without supplying of jointing materials excluding making of \"protection ductfor cable joint\" | BI01010001010000000000000515BI0100001119 | 2 | Nos |
|---|
| 7 | 7 | Supply & erection of concrete cable markers on concrete foundation blocks for straight Run Road crossing and joint location as per specification & direction of Site Engineer | BI01010001010000000000000515BI0100001120 | 4 | Nos |
|---|
| 8 | 8 | Micritunneling work with laying of HDPE Pipe as per instruction of Site Engineer and as per site condition for laying of U.G. Cable including supply of 160 mm dia HDPE pipe of PE-80, PN-6 as per IS:4954-1995 including preparation and submission drawing for such cable laying | BI01010001010000000000000515BI0100001121 | 280 | MTR |
|---|
| 9 | 9 | Excavation of soil for formation of cable trenches & reinstatement of same cable trenches with excavated soil as per direction of Site Engineer | BI01010001010000000000000515BI0100001122 | 10 | Cum |
|---|
| 10 | 10 | Laying and dressing of 1.1 KV, 4X185 sqmm XLPE Cable in the excavated cable trenches as per instruction of Site Engineer | BI01010001010000000000000515BI0100001125 | 40 | MTR |
|---|
| 11 | 11 | Micritunneling work with laying of HDPE Pipe as per instruction of Site Engineer and as per site condition for laying of U.G. Cable including supply of 110 mm dia HDPE pipe of PE-80, PN-6 as per IS:4954-1995 including preparation and submission drawing for such cable laying | BI01010001010000000000000515BI0100001126 | 320 | MTR |
|---|
| 12 | 12 | Making of RCC/ Cement concrete Mansonary Plinth Foundation suitable for Block Junction Box | BI01010001010000000000000515BI0100001127 | 2 | Nos |
|---|
| 13 | 13 | Erection of Block Junction Box/ Service Junction Box on the existing plinth | BI01010001010000000000000515BI0100001128 | 2 | Nos |
|---|
| 14 | 14 | Making of end Termination of 4C 1.1 KV 4 Core 185 sqmm XLPE Cable including supply of Gland & Socket | BI01010001010000000000000515BI0100001129 | 1 | No |
|---|
| 15 | 15 | Supply & laying of klin-burnt 1st Class bricks having proper size & shape suitable for protective cover as per instruction of Site Engineer | BI01010001010000000000000515BI0100001130 | 480 | Nos |
|---|