Rki_Phase Ii_247/20_Umbikaram Jetty To East Janakiya Thodu East End Footpath In Ward 2 Of Kainakary Gp
Tender Value
8.90 Lakhs
Estimated cost
Bid Submission
10 Jun 2021
0 days left
EMD
13370
Bank guarantee accepted
Document Fee
1782
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
CHAMPAKULAM → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Rki_Phase Ii_247/20_Umbikaram Jetty To East Janakiya Thodu East End Footpath In Ward 2 Of Kainakary Gp
BOQ
| Work Name:RKI_PHASE II_247/20_UMBIKARAM JETTY TO EAST JANAKIYA THODU EAST END FOOTPATH IN WARD 2 OF KAINAKARY GP | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | foot path | BI01010001010000000000000515BI0100001113 | ||
| 2 | 1.001 | od1079798/2020_2021 : Filling up low laying and water logged areas with local material/quarry muck,spreading in layers,leveling the top at site and consolidation by ramming etc.complete. | BI01010001010000000000000515BI0100001114 | 85.5 | cum |
| 3 | 1.002 | od1079799/2020_2021 : Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead up to 1000 m as per Technical Specification Clause 301.5 | BI01010001010000000000000515BI0100001115 | 114 | cum |
| 4 | 1.003 | od1080038/2020_2021 : Supplying and fixing Bamboo post 2.0 m long 1.00m below bed level 30 cm c/c and 1/2 split bailing pieces 5 nos 10 m long tying with cross yarn and fixing polythene fabric nylon inside above<br>screening including all cost and conveyance etc complete for screening work of bund (1.0x10m=10m2)<br> | BI01010001010000000000000515BI0100001116 | 18 | sqm |
| 5 | 1.004 | od1083052/2020_2021 : Supply and filling kayalkatta from available source including all cost of hire charges and other labor charge etc .complete. | BI01010001010000000000000515BI0100001117 | 513 | cum |
| 6 | 2 | Retainig wall ( Thodu side protection ) | BI01010001010000000000000515BI0100001118 | ||
| 7 | 2.001 | 60.7.3 : DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | BI01010001010000000000000515BI0100001119 | 27.82 | cum |
| 8 | 2.002 | 60.7.8 : DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | BI01010001010000000000000515BI0100001120 | 22.256 | cum |
| 9 | 2.003 | 60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | BI01010001010000000000000515BI0100001121 | 65.056 | cum |
| 10 | 2.004 | 5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001122 | 7.276 | cum |
| 11 | 2.005 | 5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | BI01010001010000000000000515BI0100001123 | 21.4 | sqm |
| 12 | 2.006 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | BI01010001010000000000000515BI0100001124 | 363.8 | kilogram |
| 13 | 2.007 | 7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | BI01010001010000000000000515BI0100001125 | 17.013 | cum |
AI Tender Summary
Tender Timeline
Jun 03, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedJun 10, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJun 16, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender