| 1 | 1 | concreting | BI01010001010000000000000515BI0100001113 | | |
|---|
| 2 | 1.001 | od1063543/2020_2021 : Construction of Embankment wih meterial obtained from borrow pit with a lift up to 1.5m, transporting to<br>site, spreading, grading to required slope and compacted to meet requirement of Table 300.1 &300.2with<br>lead upto 1000 m as per Technical Specification Clause 301.5.(3.4 Modified with increased<br>compensation and additional actual conveyance) without roller compaction | BI01010001010000000000000515BI0100001114 | 191.131 | cum |
|---|
| 3 | 1.002 | od1063544/2020_2021 : Filling up low laying and water logged areas with local materials/quarry muck spreading in layers ,levelling the top at site and consolidation by ramming etc compleate for improving the CBR value of subgrade. | BI01010001010000000000000515BI0100001115 | 96.281 | cum |
|---|
| 4 | 1.003 | 11.4.3.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203III.P.C.C. grade M 20 (i)Nominal mix (1:2:4) | BI01010001010000000000000515BI0100001116 | 75.075 | cum |
|---|
| 5 | 1.004 | od1071092/2020_2021 : supply and filling kayalkatta from available source i cluding all cost hire charges and other labour charges etc | BI01010001010000000000000515BI0100001117 | 40.2 | cum |
|---|
| 6 | 2 | retaining wall thodu side | BI01010001010000000000000515BI0100001118 | | |
|---|
| 7 | 2.001 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | BI01010001010000000000000515BI0100001119 | 4.66 | cum |
|---|
| 8 | 2.002 | 60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | BI01010001010000000000000515BI0100001120 | 92.164 | cum |
|---|
| 9 | 2.003 | 5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001121 | 2.176 | cum |
|---|
| 10 | 2.004 | 5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | BI01010001010000000000000515BI0100001122 | 9.6 | sqm |
|---|
| 11 | 2.005 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | BI01010001010000000000000515BI0100001123 | 108.8 | kilogram |
|---|
| 12 | 2.006 | 13.33.1 : Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | BI01010001010000000000000515BI0100001124 | 64.4 | sqm |
|---|
| 13 | 2.007 | 4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001125 | 0.8 | cum |
|---|
| 14 | 2.008 | 60.64.2 : Coconut Pile - Supplying and stacking well matured 1/2 split and straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. | BI01010001010000000000000515BI0100001126 | 119 | metre |
|---|
| 15 | 2.009 | 60.64.5 : Coconut Pile- Driving down half split coconut pile to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end | BI01010001010000000000000515BI0100001127 | 102 | metre |
|---|