Ttps Mech Ii Tm I Overhaul 2021 22 Unit Iii Overhauling Of Turbine Lub Oil System Seal Oil System Valves And Equipments, TTPS-Tamil Nadu

Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Ttps Mech Ii Tm I Overhaul 2021 22 Unit Iii Overhauling Of Turbine Lub Oil System Seal Oil System Valves And Equipments. Submission Date for this Tender is 16-06-2021. Mechanical engineering Service Tenders in TTPS Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

28052532
Ttps Mech Ii Tm I Overhaul 2021 22 Unit Iii Overhauling Of Turbine Lub Oil System Seal Oil System Valves And Equipments
National Competitive Bid
Indian
Tamil Nadu
TTPS
16-06-2021

Tender Details

Ttps Mech Ii Tm I Overhaul 2021 22 Unit Iii Overhauling Of Turbine Lub Oil System Seal Oil System Valves And Equipments - 1 Overhauling Of Seal Oil Cooler : Ndraining Of Oil From Soc, Shifting Oil Barrels, After Attending Hydraulic Testing Of Tube Nest, Top Up Oil To Mot Through Centrifuge Etc. N 2 Dismantling Of Top Water Box, Brush Cleaning Of All Tubes, Hydraulic Testing Of Tube Nest, Plugging Of Punctured Tubes, Cleaning Of Top And Bottom Water Box, Cleaning Of All Flange Seating Areas, Providing New Oil And Water Gaskets, Assembling And Tightening Of All Parts And Charging Of Oil & Water Side Etc. 3 Overhauling Of Lub Oil Cooler: Dismantling Of Existing Turbine Lub Oil Cooler Top Water Box, Draining Of Oil From Loc , Cleaning Of Tube Nest And Shifting Oil Barrels After Overhauling Of Tube Nest And Top Up Oil To Mot Through Centrifuge. 4 Inspection Of Loc / Soc Bottom Water Box: Inspection Of Loc / Soc Bottom Water Box & Rectification Work Including Cost Of Welding Rods, Epoxy Paints Etc. 5 Inspection And Cleaning Of Mot: Draining The Oil To Clean Oil Tank Through Centrifuge, Removal Of Mot Strainers, Cleaning The Tank After Removing The Slag, Drawl Of New Oil And Devolution Of Empty Barrel, Topping Up Of Oil From Clean Oil Tank Through Centrifuge. 6 Overhauling Of Clean Oil Tank: Complete Cleaning Of Slag And Painting Of Internals. 7 Overhauling Of Nrv: Overhauling Of Pnrv 100 / 250 Ata , Glv 100 / 40 , 16 Ata, Glv 4” / 600, 300 Class Ho / Mo , Scnrv 150 / 40, 16 Ata, Srv 2.5 ” X4 ” / 300 Class , Gv 350 / 125 Class & Gv 300 / 125 Class, Gv150 / 64 Ata Ho, Scnrv 350 / 125 Class : Dismantling The Valve, Cleaning All The Parts, Checking The Seating Surfaces, Bearing, Yoke Bush Etc., Lapping The Gate / Seat / Disc / Flap For Perfect Blue Matching. Re-Assembling The Valve With New Gland Packing Rings And Bonnet Gaskets Without Any Leak. Checking The Actuator Thrust Base Bearing And Apply Lubrication. 8 Overhauling Of Nrv: Overhauling Of Gv 150 / 64, 40, 16 Ata Ho, Gv 6 / 600, 300, 150 Class Ho, Glv 150 / 40 Ata , Glv 6 ” / 300 Class Ho / Mo, Scnrv 200 / 40, 16 Ata. Ndismantling The Valve, Cleaning All The Parts, Checking The Seating Surfaces, Bearing, Yoke Bush Etc., Lapping The Gate / Seat / Disc / Flap For Perfect Blue Matching. Re-Assembling The Valve With New Gland Packing Rings And Bonnet Gaskets Without Any Leak. Checking The Actuator Thrust Base Bearing And Apply Lubrication. N 9 Overhauling Of Gv 150 / 64, 40, 16 Ata Ho, Gv 6 / 600, 300, 150 Class Ho, Glv 150 / 40 Ata , Glv 6 ” / 300 Class Ho / Mo, Scnrv 200 / 40, 16 Ata Cooling Water Line Valve. Ndismantling The Valve, Cleaning All The Parts, Checking The Seating Surfaces, Bearing, Yoke Bush Etc., Lapping The Gate / Seat / Disc / Flap For Perfect Blue Matching. Re-Assembling The Valve With New Gland Packing Rings And Bonnet Gaskets Without Any Leak. Checking The Actuator Thrust Base Bearing And Apply Lubrication . N 10 Overhauling Of Gv 10 / 1500 Class Ho And Pnrv 250 / 250 Ata, Scnrv 300 / 150 Class. Gv / Gvl 10 / 150 Class, 12 / 150, 300 Class Cw Line Valve. Dismantling The Valve, Cleaning All The Parts, Checking The Seating Surface. Lapping The Gate / Seat & Flap / Disc For Perfect Blue Matching. Reassembling The Valves With New Self Sealing Ring And Bonnet Gaskets And Gland Packing Rings. 11 Overhauling Of Gv 20 ( 400 / 500Mm ) 150 Class H.O: Dismantling The Valve, Cleaning All The Parts, Checking The Bearings And Seating Surfaces. Lapping The Gate / Seat For Perfect Blue Matching. Re-Assembling The Valve With New Bonnet Gasket And Packings. 12 Replacement Of 400 / 500 Mm Gate Valve By Butterfly Valve In Lub Oil Cooler Hdpe Cooling Water Lines: This Activities Invloves Dismantling Of Old Valves From Hdpe Lines , Position , Aligning New Valves With Hdpe Lines And Tightening With Flanges Including Rectification If Any In The Hdpe Pipe Ends. 13 Overhauling Of Vapour Extraction Fan: Dismantling Of Vef Complete Assembly, Inspection And Renewal Of Worn-Out Spares And Assembling And Commissioning. 14 Repair Of Frp Lining : Repair Of Frp Lining In The Lub / Seal Oil Coolers Bottom Water Boxes Including Cost Of Frp Materials . 15 Inspection Of Coupling Bearing And Mechanical Seal In Ac Lub Oil / Dc / Ac / Dc Seal Oil Pumps Pump: Dismantling Of Bearing And Mechanical Seal Assembly And Renewal If Required And Assembling. 16 Cleaning And Painting Works Including Cost Of Paint: Cleaning And Painting With Two Coat Of Enamel Paint Of Mot / Lo / So Cooler Strainer And Related Valves, Pipelines In Turbine Oil System. 17 Repairing Of Gear Pump In Turbine Lub Oil Centrifuge System: Complete Dismantling And Renewal Of Worn-Out Spares And Assembling.

Key Value

Document Fees
Refer document
EMD
INR 5200.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: TTPS – Mech.II – TM-I - Overhaul 2021-22- Unit-III - Overhauling of Turbine Lub oil system, seal oil system, Valves and equipments
Sl. No. Item Description Item Code / Make Quantity Units
1 1 OVERHAULING OF SEAL OIL COOLER :\nDraining of oil from SOC, shifting oil barrels, after attending hydraulic testing of tube nest, top up oil to MOT through centrifuge etc.\n item1 2 Nos
2 2 Dismantling of top water box, brush cleaning of all tubes, hydraulic testing of tube nest, plugging of punctured tubes, cleaning of top and bottom water box, cleaning of all flange seating areas, providing new oil and water gaskets, assembling and tightening of all parts and charging of oil & water side etc. item2 2 Nos
3 3 OVERHAULING OF LUB OIL COOLER: Dismantling of existing Turbine Lub oil cooler top water box, Draining of oil from LOC ,cleaning of tube nest and shifting oil barrels after overhauling of tube nest and top up oil to MOT through centrifuge. item3 5 Nos
4 4 Inspection of LOC/SOC Bottom water box: Inspection of LOC/SOC Bottom water box & rectification work including cost of welding rods, epoxy paints etc. item4 2 Nos
5 5 Inspection and cleaning of MOT: Draining the oil to clean oil tank through centrifuge, Removal of MOT strainers, Cleaning the tank after removing the slag, Drawl of new oil and devolution of empty barrel, Topping up of oil from clean oil tank through centrifuge. item5 1 No
6 6 Overhauling of clean oil tank: complete cleaning of slag and painting of internals. item6 1 No
7 7 Overhauling of NRV: Overhauling of PNRV 100/250 ATA , GLV 100 / 40 , 16 ATA, GLV 4” / 600, 300 class HO / MO , SCNRV 150/ 40, 16 ATA, SRV 2.5 ” X4 ” / 300 Class ,GV 350/125 class & GV 300/125 class, GV150/64 ATA HO, SCNRV 350/125 class : Dismantling the valve, cleaning all the parts, checking the seating surfaces, bearing, yoke bush etc., Lapping the gate/seat/disc/flap for perfect blue matching. Re-assembling the valve with new gland packing rings and bonnet gaskets without any leak. Checking the Actuator thrust base bearing and apply lubrication. item7 2 Nos
8 8 Overhauling of NRV: Overhauling of GV 150/64, 40, 16 ATA HO, GV 6 "/ 600, 300, 150 class HO, GLV 150 /40 ATA , GLV 6 ” / 300 class HO/MO, SCNRV 200/40, 16 ATA.\nDismantling the valve, cleaning all the parts, checking the seating surfaces, bearing, yoke bush etc., Lapping the gate/seat/disc/flap for perfect blue matching. Re-assembling the valve with new gland packing rings and bonnet gaskets without any leak. Checking the Actuator thrust base bearing and apply lubrication.\n item8 3 Nos
9 9 Overhauling of GV 150/64, 40, 16 ATA HO, GV 6 "/ 600, 300, 150 class HO, GLV 150 /40 ATA , GLV 6 ” / 300 class HO/MO, SCNRV 200/40, 16 ATA cooling water line valve.\nDismantling the valve, cleaning all the parts, checking the seating surfaces, bearing, yoke bush etc., Lapping the gate/seat/disc/flap for perfect blue matching. Re-assembling the valve with new gland packing rings and bonnet gaskets without any leak. Checking the Actuator thrust base bearing and apply lubrication .\n item9 9 Nos
10 10 Overhauling of GV 10"/1500 Class HO and PNRV 250/250 ATA, SCNRV 300/150 Class. GV/GVL 10 "/150 class,12 "/150,300 class CW line valve. Dismantling the valve, cleaning all the parts, Checking the seating surface. Lapping the gate/seat & flap/disc for perfect blue matching. Reassembling the valves with new self sealing ring and bonnet gaskets and gland packing rings. item10 11 Nos
11 11 Overhauling of GV 20"(400/500mm) 150 class H.O: Dismantling the valve, cleaning all the parts, checking the bearings and seating surfaces. Lapping the gate / seat for perfect blue matching. Re-assembling the valve with new bonnet gasket and packings. item11 6 Nos
12 12 Replacement of 400/500 mm Gate valve by Butterfly valve in lub oil cooler HDPE cooling water lines: This activities invloves dismantling of old valves from HDPE lines , position , aligning new valves with HDPE lines and tightening with flanges including rectification if any in the HDPE pipe ends. item12 1 No
13 13 Overhauling of vapour extraction fan: Dismantling of VEF complete assembly, Inspection and renewal of worn-out spares and assembling and commissioning. item13 3 Nos
14 14 Repair of FRP lining : Repair of FRP lining in the lub/seal oil coolers bottom water boxes including cost of FRP materials . item14 15
15 15 Inspection of coupling Bearing and mechanical seal in AC lub Oil/ DC/ AC/DC seal oil pumps pump: Dismantling of bearing and mechanical seal assembly and renewal if required and assembling. item15 1 No
16 16 Cleaning and painting works including cost of paint: Cleaning and painting with two coat of enamel paint of MOT/LO/SO cooler strainer and related valves, pipelines in turbine oil system. item16 150
17 17 Repairing of gear pump in Turbine lub Oil centrifuge system: Complete dismantling and renewal of worn-out spares and assembling. item17 1 No
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail