}

Fixing Of Rate Contract For Handling And Fabrication Of Various Material In Divisional Stores At Seela (Reasi) Of Electric Division Reasi Jpdcl, in divisional stores seela Reasi-Jammu And Kashmir

Power Development Department has published Fixing Of Rate Contract For Handling And Fabrication Of Various Material In Divisional Stores At Seela (Reasi) Of Electric Division Reasi Jpdcl. Submission Date for this Tender is 14-06-2021. RCC Pole Tenders in in divisional stores seela Reasi Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

28050181
Corrigendum : Fixing Of Rate Contract For Handling And Fabrication Of Various Material In Divisional Stores At Seela (Reasi) Of Electric Division Reasi Jpdcl
Tender
Indian
Jammu And Kashmir
In Divisional Stores Seela Reasi
14-06-2021

Tender Details

Fixing Of Rate Contract For Handling And Fabrication Of Various Material In Divisional Stores At Seela ( Reasi ) Of Electric Division Reasi Jpdcl-1 Unloading Of Pcc Poles 11 Mtr Long 2 Unloading Of Pcc Poles 9 Mtr Long 3 Unloading Of Pcc Poles 8 / 7.5 Mtr Long 4 Unloading Of St Poles 13 Mtr Long 5 Unloading Of St Poles 11Mtr Long 6 Unloading Of St Poles 9 Mtr Long 7 Unloading Of St Poles 8 Mtr Long 8 Loading Of Pcc Poles 11 Mtr Long 9 Loading Of Pcc Poles 9 Mtr Long 10 Loading Of Pcc Poles 8 / 7.5 Mtr Long 11 Loading Of St Poles 13 Mtr Long 12 Loading Of St Poles 11Mtr Long 13 Loading Of St Poles 9 Mtr Long 14 Loading Of St Poles 8 Mtr Long 15 Dragging Of Pcc Poles At An Average Distance Upto 50 Mtr For Stacking To Accesible Place For Loading / Unoading Purpose And Its Stacking 16 Dragging Of St Poles At An Average Distance Upto 50 Mtr For Stacking To Accesible Place For Loading / Unoading Purpose And Its Stacking 17 Unloading Of Old / New Acsr Conductor 18 Loading Of Old / New Acsr Conductor 19 Shifting Of Old / New Acsr Conductor From Unloading Site To Stacking Site At An Average Distance Upto 50 Mtr And Its Stacking 20 Shifting Of Old / New Acsr Conductor To Other Place For Making Space For Other Store Material At An Average Distance Upto 50 Mtr And Its Stacking 21 Unloading Of 25 Kva Transformer ( New / Write Backtransformer ) 22 Unloading Of 63 Kva Transformer ( New / Write Backtransformer ) 23 Unloading Of 100 Kva Transformer ( New / Write Backtransformer ) 24 Unloading Of 250 Kva Transformer ( New / Write Backtransformer ) 25 Unloading Of 400 Kva Transformer ( New / Write Backtransformer ) 26 Unloading Of 630 Kva Transformer ( New / Write Backtransformer ) 27 Loading Of 25 Kva Transformer 28 Loading Of 63 Kva Transformer 29 Loading Of 100 Kva Transformer 30 Loading Of 250 Kva Transformer 31 Loading Of 400 Kva Transformer 32 Loading Of 630 Kva Transformer 33 Dragging Of Existing / New / Damaged 25 Kva Tranformer At An Average Distance Upto 50 Mtr From Unloading Site To Stacking Site And Its Stacking Properly 34 Dragging Of Existing / New 63 Kva Tranformer At An Average Distance Upto 50 Mtr From Unloading Site To Stacking Site And Its Stacking Properly 35 Dragging Of Existing / New / Damaged 100 Kva Tranformer At An Average Distance Upto 50 Mtrfrom Unloading Site To Stacking Site And Its Stacking Properly 36 Dragging Of Existing / New / Damaged 250 Kva Tranformer At An Average Distance Upto 50 Mtrfrom Unloading Site To Stacking Site And Its Stacking Properly 37 Dragging Of Existing / New / Damaged 400Kva Tranformer At An Average Distance Upto 50 Mtr From Unloading Site To Stacking Site And Its Stacking Properly 38 Dragging Of Existing / New / Damaged 630Kva Tranformer At An Average Distance Upto 50 Mtr From Unloading Site To Stacking Site And Its Stacking Properly 39 Dragging Of Existing / New / Damaged 25 Kva Tranformer At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 40 Dragging Of Existing / New 63 Kva Tranformer At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 41 Dragging Of Existing / New / Damaged 100 Kva Tranformer At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 42 Dragging Of Existing / New / Damaged 250 Kva Tranformer At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 43 Dragging Of Existing / New / Damaged 400Kva Tranformer At An Average Distance Upto 50 Mtrfor Making Space For Other Store Material And Its Stacking 44 Dragging Of Existing / New / Damaged 630Kva Tranformer At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 45 Unloading Of Channel / Angle / Flat Iron 46 Loading Of Channel / Angle / Flat Iron 47 Shifting Of Channel / Angle / Flat Iron At An Average Distance Upto 50 Mtr From Unloading Site To Stacking Site And Its Stacking Properly 48 Shifting Of Channel / Angle / Flat Iron At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 49 Unloading Of Link / Knife / Hg / Do / La Set 50 Loading Of Link / Knife / Hg / Do / La / Go Set 51 Unloading Of Ct / Pt Unit 52 Loading Of Ct / Pt Unit 53 Unloading Of Dpc Cu / Al Wire Of Sorts 54 Unloading Of Bush Rods And Other Allied Workshop Material 55 Unloading Of Allied Material For Ht / Lt Line / Substations ( I.E. Disc / Pin / Shackle / Busbar Insulators / Fittings / Bush Rods / Safety Items Etc ) 56 Unloading Of Allied Material For Ht / Lt Line / Substations ( I.E. Gi Wire / Guy Wire / Cu / Al.Wire / Acsr Conductor ( Old / New ) , Mesh Fencing Etc ) 57 Loading Of Allied Material For Ht / Lt Line / Substations / Workshop Material ( I.E. Disc / Pin / Shackle / Busbar Insulators / Fittings / Bush Rods / Safety Items Etc ) 58 Loading Of Allied Material For Ht / Lt Line / Substations / Workshop Material ( I.E. Gi Wire / Guy Wire / Cu / Al.Wire / Acsr Conductor ( Old / New ) , Mesh Fencing, Barbed Wire Etc ) 59 Shifting Of Allied Material For Ht / Lt Line / Substations ( I.E. Disc / Pin / Shackle / Busbar Insulators / Fittings / Bush Rods / Safety Items Etc ) From Unloading Site To Stacking Site And Stacking Properly In / Around Store Premises. 60 Shifting Of Allied Material For Ht / Lt Line / Substations ( I.E. Gi Wire / Guy Wire / Cu / Al.Wire / Acsr Conductor ( Old / New ) , Mesh Fencing Etc ) From Unloading Site To Stacking Site And Stacking Properly In / Around Store Premises. 61 Shifting Of Allied Material For Ht / Lt Line / Substations / Workshop Material ( I.E. Disc / Pin / Shackle / Busbar Insulators / Fittings / Bush Rods / Safety Items Etc ) For Making Space For Other Store Material In / Around Store Premises. 62 Shifting Of Allied Material For Ht / Lt Line / Substations / Workshop Material ( I.E. Gi Wire / Guy Wire / Cu / Al.Wire / Acsr Conductor ( Old / New ) , Mesh Fencing Etc ) For Making Space For Other Store Material In / Around Store Premises. 63 Unloading / Loading Of Bammboo Ladder 64 Unloading / Loading Of Single / Three Phase Meters 65 Unloading Of Pvc Cable Single Core 95 / 120 / 185Mmsq 66 Unloading Of Pvc Cable Single Core 300 / 400 / 630Mmsq 67 Loading Of Pvc Cable Single Core 95 / 120 / 185Mmsq 68 Loading Of Pvc Cable Single Core 300 / 400 / 630Mmsq 69 Unloading Of Ab / Xlpe 25 / 35 / 50 / 70 / 95Mmsq Cable For Ht / Lt Lines 70 Unloading Of Ab / Xlpe 120 / 150 / 185 / 240Mmsq Cable For Ht / Lt Lines 71 Loading Of Ab / Xlpe 25 / 35 / 50 / 70 / 95Mmsq Cable For Ht / Lt Lines 72 Loading Of Ab / Xlpe 120 / 150 / 185 / 240Mmsq Cable For Ht / Lt Lines 73 Shifting Of Ab / Xlpe25 / 35 / 50 / 70 / 95Mmsq Cable For Ht / Lt Lines From Unloading Site To Stacking Site And Stacking Properly In Store Premises 74 Shifting Of Ab / Xlpe120 / 150 / 185 / 240Mmsq Cable For Ht / Lt Lines From Unloading Site To Stacking Site And Stacking Properly In Store Premises 75 Fabrication Of Channel Cross Arms, V Shape Cross Arms Of Sorts From Ms Channel 100X50x6 / 75X40x5 By Way Of Cutting To Sizes, Straighting & Drilling Holes As Required 76 Loading Of Aluminium And Copper Wire 77 Loading Of Bush Rods And Other Allied Workshop Material 78 Stacking Of Single / Three Phase Meters In Store Premises 79 Fabrication Of Angle Iron Braces / Belts / Guard Netting Angles , Fencing Posts Etc From Angle Iron Of Sizes Including Driiling Of Holes At Both Ends 80 Fabrication Of Fi Ties , Fi Clamps, Braces And U-Clamps, Mukki Clamps, Back Clamps, Brace Clamps Of Sorts. From Ms Flat Of Different Sizes Including Drilling Of Holes As Required ( Suitable For 8 Mtr, 9Mtr, 11 Mtr And 13 Mtr Poles ) 81 Fabrication Of Earthing Plates , Cable Duct Cover From Ms Plate Of Different Sizes Including Holes As Per Rec Standards 82 Fabrication Of Earthing Spikes From Ms Tor Steel Of Sorts As Per Rec Standards 83 Fabrication Of Guy Rods, Stay Set Including Anchor Plates And Stringing Screws.As Per Rec Standards. 84 Fabrication Of Guy Rods 85 Fabrication Of St Poles By Way Of Drilling Of Extra Holes 86 Making Up Of Sort Of Holes In Cross Arms / Angle Iron Braces / Clamps As Per Requirement 87 Fabrication Of Foundation Bolts From Ms Tor Steel Of Sorts Including Threading As Per Rec Standards 88 Fabrication Of Fish Plate1 Mtr Long As Per Rec Standards 89 Fabrication Of Earthing Pipe From Gi Pipe And Welding Of Earthing Plate As Per Rec Standards 90 Unloading / Loading Of Straight Jointer Kit / Heat Shrinkable Kit For Ab / Xlpe Cables Of Ht / Lt Lines 91 Unreeling Of The Acsr Weasel / Squirell Conductor From The Drum, Measuring , Cutting , Bundling Etc 92 Re-Reeling Of The Acsr Weasel / Squirell Conductor Etc 93 Unreeling Of The Acsr Dog / Rabbit Conductor From The Drum, Measuring , Cutting , Bundling Etc 94 Re-Reeling Of The Acsr Dog / Rabbit Conductor Etc 95 Unreeling Of The Xlpe / Ab / Pvc Single Core Cables Of Sizes From The Drum, Measuring , Cutting , Bundling Etc 96 Re-Reeling Of The Xlpe / Ab / Pvc Single Core Cables Of Sizes Etc 97 Checking / Counting / Meggering Of Line / Hardware Materials Viz Disc Insulators With Fittings, Pin Insulators With Pins Etc 98 Checking / Measuring / Weighing Of Line / Workshop Material Viz Nuts And Bolts, Guy Wire, Gi Wire, Al. Strips, Dpc Cu / Al Wire, Khakhi Paper, Lethoride Paper, Fevicol Etc. 99 Unloading Of Cement Bags 100 Carrigae Of Cement Bags From Unloading Site To Stacking Site N ( Upto 50 Mtr ) 101 Stacking Of Cement Bags 102 Loading Of Cement Bags 103 Cutting Of Green Vegetable Bushes , Wild Grass, Trees In The Store To Avoid Any Mishappening Of Untoward Incidents ( Covering Periphery In And Around The Store Premises ) 104 Carriage Of Green Vegetable Bushes , Wild Grass, Trees After Cutting And Dumping Away From Store ( Covering Periphery In And Around The Store Premises ) 105 Straightening Of Tilted Fencing Posts In The Store Premises For Repair Of Fecning 106 Insertion Of New Fencing Posts In The Store For Repair Of Fencing 107 Dismantling Of Existing Mesh Fencing 108 Fixing Of Mesh Fencing 109 Fixiing Of Cgi Sheets 110 Dismantling Of Cgi Sheets 111 Meggering, Tightening Of Nuts And Bolts, Oil Seals, Breathers Checkings, Visual Inspections Of Transfomers 25 / 63 / 100 Kva 112 Meggering, Tightening Of Nuts And Bolts, Oil Seals, Breathers Checkings, Visual Inspections Of Transfomers 250 / 400 / 630Kva 113 Lifting Of Unserviceable Items Like, Damaged Transformers ( Outer Frame Of Dts ) , Broken Insulators Of Sorts, , Al / Cu / Scrap / Bushrods Of Sorts, Empty Barells, Broken Cgi Sheerts, Iron Scraps, Damaged Energy Meters, Ct / Pts Sets From Existing Place To Another Suitable Place And Its Stacking 114 Painting ( Red Oxide / Aluminium Paint ) Of Fabricated Material. 115 Loading Of Transformer Oil ( Old / New ) Barrel 116 Unloading Of Transformer Oil ( Old / New ) Barrel 117 Dragging Of Transformer Oil ( Old / New ) Barrel At An Average Distance Upto 50 Mtr From Unloading Site To Stacking Site And Its Stacking Properly 118 Dragging Of Transformer Oil ( Old / New ) Barrel At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 119 Unloading Of Old Loose Conductor And Making Bundles 120 Checking & Maggering Of 11Kv La Set Hg Set Go Set Ct / Pt Unit

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 07-06-2021 Date Extension Date 14-06-2021

Key Value

Document Fees
INR 1000 /-
EMD
INR 20000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail