| 1 | 1 | Unloading of PCC Poles 11 Mtr Long | item1 | 1 | No |
|---|
| 2 | 2 | Unloading of PCC Poles 9 Mtr Long | item2 | 1 | No |
|---|
| 3 | 3 | Unloading of PCC Poles 8/7.5 Mtr Long | item3 | 1 | No |
|---|
| 4 | 4 | Unloading of ST Poles 13 Mtr Long | item4 | 1 | No |
|---|
| 5 | 5 | Unloading of ST Poles 11Mtr Long | item5 | 1 | No |
|---|
| 6 | 6 | Unloading of ST Poles 9 Mtr Long | item6 | 1 | No |
|---|
| 7 | 7 | Unloading of ST Poles 8 Mtr Long | item7 | 1 | No |
|---|
| 8 | 8 | Loading of PCC Poles 11 Mtr Long | item8 | 1 | No |
|---|
| 9 | 9 | Loading of PCC Poles 9 Mtr Long | item9 | 1 | No |
|---|
| 10 | 10 | Loading of PCC Poles 8/7.5 Mtr Long | item10 | 1 | No |
|---|
| 11 | 11 | Loading of ST Poles 13 Mtr Long | item11 | 1 | No |
|---|
| 12 | 12 | Loading of ST Poles 11Mtr Long | item12 | 1 | No |
|---|
| 13 | 13 | Loading of ST Poles 9 Mtr Long | item13 | 1 | No |
|---|
| 14 | 14 | Loading of ST Poles 8 Mtr Long | item14 | 1 | No |
|---|
| 15 | 15 | Dragging of PCC Poles at an average distance upto 50 Mtr for stacking to accesible place for loading/Unoading Purpose and its stacking | item15 | 1 | No |
|---|
| 16 | 16 | Dragging of ST Poles at an average distance upto 50 Mtr for stacking to accesible place for loading/Unoading Purpose and its stacking | item16 | 1 | No |
|---|
| 17 | 17 | Unloading of Old /New ACSR Conductor | item17 | 1 | Qtl |
|---|
| 18 | 18 | Loading of Old/New ACSR Conductor | item18 | 1 | Qtl |
|---|
| 19 | 19 | Shifting of Old/New ACSR Conductor from unloading site to stacking site at an average distance upto 50 Mtr and its stacking | item19 | 1 | Qtl |
|---|
| 20 | 20 | Shifting of Old/New ACSR Conductor to other place for making space for other store material at an average distance upto 50 Mtr and its stacking | item20 | 1 | Qtl |
|---|
| 21 | 21 | Unloading of 25 KVA Transformer(New/Write BackTransformer) | item21 | 1 | No |
|---|
| 22 | 22 | Unloading of 63 KVA Transformer(New/Write BackTransformer) | item22 | 1 | No |
|---|
| 23 | 23 | Unloading of 100 KVA Transformer(New/Write BackTransformer) | item23 | 1 | No |
|---|
| 24 | 24 | Unloading of 250 KVA Transformer(New/Write BackTransformer) | item24 | 1 | No |
|---|
| 25 | 25 | Unloading of 400 KVA Transformer(New/Write BackTransformer) | item25 | 1 | No |
|---|
| 26 | 26 | Unloading of 630 KVA Transformer(New/Write BackTransformer) | item26 | 1 | No |
|---|
| 27 | 27 | Loading of 25 KVA Transformer | item27 | 1 | No |
|---|
| 28 | 28 | Loading of 63 KVA Transformer | item28 | 1 | No |
|---|
| 29 | 29 | Loading of 100 KVA Transformer | item29 | 1 | No |
|---|
| 30 | 30 | Loading of 250 KVA Transformer | item30 | 1 | No |
|---|
| 31 | 31 | Loading of 400 KVA Transformer | item31 | 1 | No |
|---|
| 32 | 32 | Loading of 630 KVA Transformer | item32 | 1 | No |
|---|
| 33 | 33 | Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item33 | 1 | No |
|---|
| 34 | 34 | Dragging of existing /New 63 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item34 | 1 | No |
|---|
| 35 | 35 | Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly | item35 | 1 | No |
|---|
| 36 | 36 | Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly | item36 | 1 | No |
|---|
| 37 | 37 | Dragging of existing /New/Damaged 400KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item37 | 1 | No |
|---|
| 38 | 38 | Dragging of existing /New/Damaged 630KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item38 | 1 | No |
|---|
| 39 | 39 | Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking | item39 | 1 | No |
|---|
| 40 | 40 | Dragging of existing /New 63 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking | item40 | 1 | No |
|---|
| 41 | 41 | Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking | item41 | 1 | No |
|---|
| 42 | 42 | Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking | item42 | 1 | No |
|---|
| 43 | 43 | Dragging of existing /New/Damaged 400KVA Tranformer at an average distance upto 50 Mtrfor making space for other store material and its stacking | item43 | 1 | No |
|---|
| 44 | 44 | Dragging of existing /New/Damaged 630KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking | item44 | 1 | No |
|---|
| 45 | 45 | Unloading of Channel/Angle/Flat Iron | item45 | 1 | Qtl |
|---|
| 46 | 46 | Loading of Channel/Angle/Flat Iron | item46 | 1 | Qtl |
|---|
| 47 | 47 | Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item47 | 1 | Qtl |
|---|
| 48 | 48 | Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr for making space for other store material and its stacking | item48 | 1 | Qtl |
|---|
| 49 | 49 | Unloading of Link/Knife/HG/DO/LA Set | item49 | 1 | set |
|---|
| 50 | 50 | Loading of Link/Knife/HG/DO/LA/GO Set | item50 | 1 | set |
|---|
| 51 | 51 | Unloading of CT/PT Unit | item51 | 1 | No |
|---|
| 52 | 52 | Loading of CT/PT Unit | item52 | 1 | No |
|---|
| 53 | 53 | Unloading of DPC CU/AL Wire of sorts | item53 | 1 | kg |
|---|
| 54 | 54 | Unloading of Bush Rods and other allied workshop material | item54 | 1 | kg |
|---|
| 55 | 55 | Unloading of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/fittings/bush rods/safety items etc) | item55 | 1 | No |
|---|
| 56 | 56 | Unloading of allied material for HT/LT Line/Substations(i.e. GI wire/Guy wire/Cu/Al.wire/ACSR conductor (old/new), mesh fencing etc) | item56 | 1 | kg |
|---|
| 57 | 57 | Loading of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/fittings/bush rods/safety items etc) | item57 | 1 | No |
|---|
| 58 | 58 | Loading of allied material for HT/LT Line/Substations/workshop material(i.e. GI wire/Guy wire/Cu/Al.wire/ACSR conductor (old/new), mesh fencing,barbed wire etc) | item58 | 1 | kg |
|---|
| 59 | 59 | Shifting of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/fittings/bush rods/safety items etc)from unloading site to stacking site and stacking properly in/around store premises. | item59 | 1 | No |
|---|
| 60 | 60 | Shifting of allied material for HT/LT Line/Substations(i.e. GI wire/Guy wire/Cu/Al.wire/ACSR conductor (old/new), mesh fencing etc)from unloading site to stacking site and stacking properly in/around store premises. | item60 | 1 | kg |
|---|
| 61 | 61 | Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/fittings/bush rods/safety items etc) for making space for other store material in/around store premises. | item61 | 1 | No |
|---|
| 62 | 62 | Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. GI wire/Guy wire/Cu/Al.wire/ACSR conductor (old/new), mesh fencing etc) for making space for other store material in/around store premises. | item62 | 1 | kg |
|---|
| 63 | 63 | Unloading/Loading of Bammboo Ladder | item63 | 1 | No |
|---|
| 64 | 64 | Unloading/Loading of Single/Three Phase Meters | item64 | 1 | No |
|---|
| 65 | 65 | Unloading of PVC Cable single core 95/120/185mmsq | item65 | 1 | Mtr |
|---|
| 66 | 66 | Unloading of PVC Cable single core 300/400/630mmsq | item66 | 1 | Mtr |
|---|
| 67 | 67 | Loading of PVC Cable single core 95/120/185mmsq | item67 | 1 | Mtr |
|---|
| 68 | 68 | Loading of PVC Cable single core 300/400/630mmsq | item68 | 1 | Mtr |
|---|
| 69 | 69 | Unloading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines | item69 | 1 | Mtr |
|---|
| 70 | 70 | Unloading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines | item70 | 1 | Mtr |
|---|
| 71 | 71 | Loading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines | item71 | 1 | Mtr |
|---|
| 72 | 72 | Loading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines | item72 | 1 | Mtr |
|---|
| 73 | 73 | Shifting of AB/XLPE25/35/50/70/95mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly in store premises | item73 | 1 | Mtr |
|---|
| 74 | 74 | Shifting of AB/XLPE120/150/185/240mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly in store premises | item74 | 1 | Mtr |
|---|
| 75 | 75 | Fabrication of Channel Cross Arms, V shape cross arms of sorts from MS Channel 100x50x6/75x40x5 BY WAY OF CUTTING TO SIZES, STRAIGHTING & DRILLING HOLES AS REQUIRED | item75 | 1 | Qtl |
|---|
| 76 | 76 | Loading of Aluminium and Copper wire | item76 | 1 | kg |
|---|
| 77 | 77 | loading of Bush Rods and other allied Workshop material | item77 | 1 | kg |
|---|
| 78 | 78 | Stacking of Single/Three phase meters in store premises | item78 | 1 | Nos |
|---|
| 79 | 79 | Fabrication of Angle iron braces /Belts/Guard Netting angles ,fencing posts etc from angle iron of sizes including driiling of holes at both ends | item79 | 1 | Qtl |
|---|
| 80 | 80 | Fabrication of fi ties ,fi clamps,BRACES AND U-CLAMPS, MUKKI CLAMPS, BACK CLAMPS, BRACE CLAMPS OF SORTS. from MS flat of different sizes including drilling of holes as required (suitable for 8 mtr, 9mtr,11 mtr and 13 mtr poles) | item80 | 1 | Qtl |
|---|
| 81 | 81 | Fabrication of Earthing Plates , Cable duct cover from MS plate of different sizes including holes as per REC Standards | item81 | 1 | Qtl |
|---|
| 82 | 82 | Fabrication of earthing spikes from MS tor steel of sorts as per REC Standards | item82 | 1 | Qtl |
|---|
| 83 | 83 | Fabrication of Guy rods, stay set including anchor plates and stringing screws.as per REC standards. | item83 | 1 | set |
|---|
| 84 | 84 | Fabrication of Guy rods | item84 | 1 | No |
|---|
| 85 | 85 | Fabrication of ST poles by way of drilling of extra holes | item85 | 1 | No |
|---|
| 86 | 86 | Making up of sort of holes in cross arms/angle iron braces/clamps as per requirement | item86 | 1 | No |
|---|
| 87 | 87 | Fabrication of foundation bolts from MS tor steel of sorts including threading as per REC Standards | item87 | 1 | No |
|---|
| 88 | 88 | Fabrication of fish plate1 mtr long as per REC Standards | item88 | 1 | No |
|---|
| 89 | 89 | Fabrication of Earthing pipe from GI pipe and welding of earthing plate as per REC Standards | item89 | 1 | No |
|---|
| 90 | 90 | Unloading/Loading of Straight jointer kit/Heat shrinkable Kit for AB/XLPE cables of HT/LT Lines | item90 | 1 | No |
|---|
| 91 | 91 | Unreeling of the ACSR Weasel/Squirell Conductor from the drum, measuring ,cutting ,bundling etc | item91 | 1 | Mtr |
|---|
| 92 | 92 | Re-reeling of the ACSR Weasel/Squirell Conductor etc | item92 | 1 | Mtr |
|---|
| 93 | 93 | Unreeling of the ACSR Dog/Rabbit conductor from the drum, measuring ,cutting ,bundling etc | item93 | 1 | Mtr |
|---|
| 94 | 94 | Re-reeling of the ACSR Dog/Rabbit conductor etc | item94 | 1 | Mtr |
|---|
| 95 | 95 | Unreeling of the XLPE/AB/PVC Single core cables of sizes from the drum, measuring , cutting ,bundling etc | item95 | 1 | Mtr |
|---|
| 96 | 96 | Re-reeling of the XLPE/AB/PVC Single core cables of sizes etc | item96 | 1 | Mtr |
|---|
| 97 | 97 | Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators with fittings, Pin insulators with pins etc | item97 | 1 | kg |
|---|
| 98 | 98 | Checking/Measuring/ Weighing of Line/Workshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc. | item98 | 1 | Kg |
|---|
| 99 | 99 | Unloading of Cement Bags | item99 | 1 | bag |
|---|
| 100 | 100 | Carrigae of Cement Bags from unloading site to stacking site\n(Upto 50 Mtr) | item100 | 1 | bag |
|---|
| 101 | 101 | Stacking of Cement bags | item101 | 1 | bag |
|---|
| 102 | 102 | Loading of Cement Bags | item102 | 1 | bag |
|---|
| 103 | 103 | Cutting of Green Vegetable Bushes , Wild Grass, trees in the store to avoid any mishappening of untoward incidents (covering periphery in and around the store premises) | item103 | 1 | Sqft |
|---|
| 104 | 104 | Carriage of Green Vegetable Bushes , Wild Grass, trees after cutting and dumping away from store (covering periphery in and around the store premises) | item104 | 1 | LS |
|---|
| 105 | 105 | Straightening of tilted fencing posts in the store premises for repair of fecning | item105 | 1 | No |
|---|
| 106 | 106 | Insertion of new fencing Posts in the store for repair of fencing | item106 | 1 | No |
|---|
| 107 | 107 | Dismantling of existing mesh fencing | item107 | 1 | Sqft |
|---|
| 108 | 108 | Fixing of mesh Fencing | item108 | 1 | Sqft |
|---|
| 109 | 109 | Fixiing of CGI Sheets | item109 | 1 | Sqft |
|---|
| 110 | 110 | Dismantling of CGI sheets | item110 | 1 | Sqft |
|---|
| 111 | 111 | Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 25/63/100 KVA | item111 | 1 | No |
|---|
| 112 | 112 | Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 250/400/630KVA | item112 | 1 | No |
|---|
| 113 | 113 | Lifting of Unserviceable items like, Damaged Transformers(Outer frame of DTs), Broken Insulators of sorts, ,Al/ Cu/ Scrap/ Bushrods of sorts, Empty barells, Broken CGI Sheerts, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking | item113 | 1 | Kg |
|---|
| 114 | 114 | Painting(Red oxide/Aluminium Paint) of Fabricated Material. | item114 | 1 | Kg |
|---|
| 115 | 115 | Loading of transformer oil (old/new) Barrel | item115 | 1 | No |
|---|
| 116 | 116 | Unloading of transformer oil (old/new) Barrel | item116 | 1 | No |
|---|
| 117 | 117 | Dragging of transformer oil (old/new) Barrel at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item117 | 1 | No |
|---|
| 118 | 118 | Dragging of transformer oil (old/new) Barrel at an average distance upto 50 Mtr for making space for other store material and its stacking | item118 | 1 | No |
|---|
| 119 | 119 | Unloading of old loose conductor and making bundles | item119 | 1 | Qtl |
|---|
| 120 | 120 | Checking & maggering of 11Kv LA set HG set GO set CT/PT unit | item120 | 1 | set |
|---|