Power Development Department has published Fixing Of Rate Contract For Handling And Fabrication Of Various Material In Divisional Stores At Seela (Reasi) Of Electric Division Reasi Jpdcl. Submission Date for this Tender is 14-06-2021. RCC Pole Tenders in in divisional stores seela Reasi Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 07-Jun-2021 | Date Extension | Date | 14-06-2021 |
Name of Work: <Fixing of Rate Contract for handling and fabrication of various material in Divisional stores at seela (Reasi) of Electric Division Reasi JPDCL > | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Unloading of PCC Poles 11 Mtr Long | item1 | 1 | No |
2 | 2 | Unloading of PCC Poles 9 Mtr Long | item2 | 1 | No |
3 | 3 | Unloading of PCC Poles 8/7.5 Mtr Long | item3 | 1 | No |
4 | 4 | Unloading of ST Poles 13 Mtr Long | item4 | 1 | No |
5 | 5 | Unloading of ST Poles 11Mtr Long | item5 | 1 | No |
6 | 6 | Unloading of ST Poles 9 Mtr Long | item6 | 1 | No |
7 | 7 | Unloading of ST Poles 8 Mtr Long | item7 | 1 | No |
8 | 8 | Loading of PCC Poles 11 Mtr Long | item8 | 1 | No |
9 | 9 | Loading of PCC Poles 9 Mtr Long | item9 | 1 | No |
10 | 10 | Loading of PCC Poles 8/7.5 Mtr Long | item10 | 1 | No |
11 | 11 | Loading of ST Poles 13 Mtr Long | item11 | 1 | No |
12 | 12 | Loading of ST Poles 11Mtr Long | item12 | 1 | No |
13 | 13 | Loading of ST Poles 9 Mtr Long | item13 | 1 | No |
14 | 14 | Loading of ST Poles 8 Mtr Long | item14 | 1 | No |
15 | 15 | Dragging of PCC Poles at an average distance upto 50 Mtr for stacking to accesible place for loading/Unoading Purpose and its stacking | item15 | 1 | No |
16 | 16 | Dragging of ST Poles at an average distance upto 50 Mtr for stacking to accesible place for loading/Unoading Purpose and its stacking | item16 | 1 | No |
17 | 17 | Unloading of Old /New ACSR Conductor | item17 | 1 | Qtl |
18 | 18 | Loading of Old/New ACSR Conductor | item18 | 1 | Qtl |
19 | 19 | Shifting of Old/New ACSR Conductor from unloading site to stacking site at an average distance upto 50 Mtr and its stacking | item19 | 1 | Qtl |
20 | 20 | Shifting of Old/New ACSR Conductor to other place for making space for other store material at an average distance upto 50 Mtr and its stacking | item20 | 1 | Qtl |
21 | 21 | Unloading of 25 KVA Transformer(New/Write BackTransformer) | item21 | 1 | No |
22 | 22 | Unloading of 63 KVA Transformer(New/Write BackTransformer) | item22 | 1 | No |
23 | 23 | Unloading of 100 KVA Transformer(New/Write BackTransformer) | item23 | 1 | No |
24 | 24 | Unloading of 250 KVA Transformer(New/Write BackTransformer) | item24 | 1 | No |
25 | 25 | Unloading of 400 KVA Transformer(New/Write BackTransformer) | item25 | 1 | No |
26 | 26 | Unloading of 630 KVA Transformer(New/Write BackTransformer) | item26 | 1 | No |
27 | 27 | Loading of 25 KVA Transformer | item27 | 1 | No |
28 | 28 | Loading of 63 KVA Transformer | item28 | 1 | No |
29 | 29 | Loading of 100 KVA Transformer | item29 | 1 | No |
30 | 30 | Loading of 250 KVA Transformer | item30 | 1 | No |
31 | 31 | Loading of 400 KVA Transformer | item31 | 1 | No |
32 | 32 | Loading of 630 KVA Transformer | item32 | 1 | No |
33 | 33 | Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item33 | 1 | No |
34 | 34 | Dragging of existing /New 63 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item34 | 1 | No |
35 | 35 | Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly | item35 | 1 | No |
36 | 36 | Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly | item36 | 1 | No |
37 | 37 | Dragging of existing /New/Damaged 400KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item37 | 1 | No |
38 | 38 | Dragging of existing /New/Damaged 630KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item38 | 1 | No |
39 | 39 | Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking | item39 | 1 | No |
40 | 40 | Dragging of existing /New 63 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking | item40 | 1 | No |
41 | 41 | Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking | item41 | 1 | No |
42 | 42 | Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking | item42 | 1 | No |
43 | 43 | Dragging of existing /New/Damaged 400KVA Tranformer at an average distance upto 50 Mtrfor making space for other store material and its stacking | item43 | 1 | No |
44 | 44 | Dragging of existing /New/Damaged 630KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking | item44 | 1 | No |
45 | 45 | Unloading of Channel/Angle/Flat Iron | item45 | 1 | Qtl |
46 | 46 | Loading of Channel/Angle/Flat Iron | item46 | 1 | Qtl |
47 | 47 | Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item47 | 1 | Qtl |
48 | 48 | Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr for making space for other store material and its stacking | item48 | 1 | Qtl |
49 | 49 | Unloading of Link/Knife/HG/DO/LA Set | item49 | 1 | set |
50 | 50 | Loading of Link/Knife/HG/DO/LA/GO Set | item50 | 1 | set |
51 | 51 | Unloading of CT/PT Unit | item51 | 1 | No |
52 | 52 | Loading of CT/PT Unit | item52 | 1 | No |
53 | 53 | Unloading of DPC CU/AL Wire of sorts | item53 | 1 | kg |
54 | 54 | Unloading of Bush Rods and other allied workshop material | item54 | 1 | kg |
55 | 55 | Unloading of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/fittings/bush rods/safety items etc) | item55 | 1 | No |
56 | 56 | Unloading of allied material for HT/LT Line/Substations(i.e. GI wire/Guy wire/Cu/Al.wire/ACSR conductor (old/new), mesh fencing etc) | item56 | 1 | kg |
57 | 57 | Loading of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/fittings/bush rods/safety items etc) | item57 | 1 | No |
58 | 58 | Loading of allied material for HT/LT Line/Substations/workshop material(i.e. GI wire/Guy wire/Cu/Al.wire/ACSR conductor (old/new), mesh fencing,barbed wire etc) | item58 | 1 | kg |
59 | 59 | Shifting of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/fittings/bush rods/safety items etc)from unloading site to stacking site and stacking properly in/around store premises. | item59 | 1 | No |
60 | 60 | Shifting of allied material for HT/LT Line/Substations(i.e. GI wire/Guy wire/Cu/Al.wire/ACSR conductor (old/new), mesh fencing etc)from unloading site to stacking site and stacking properly in/around store premises. | item60 | 1 | kg |
61 | 61 | Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/fittings/bush rods/safety items etc) for making space for other store material in/around store premises. | item61 | 1 | No |
62 | 62 | Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. GI wire/Guy wire/Cu/Al.wire/ACSR conductor (old/new), mesh fencing etc) for making space for other store material in/around store premises. | item62 | 1 | kg |
63 | 63 | Unloading/Loading of Bammboo Ladder | item63 | 1 | No |
64 | 64 | Unloading/Loading of Single/Three Phase Meters | item64 | 1 | No |
65 | 65 | Unloading of PVC Cable single core 95/120/185mmsq | item65 | 1 | Mtr |
66 | 66 | Unloading of PVC Cable single core 300/400/630mmsq | item66 | 1 | Mtr |
67 | 67 | Loading of PVC Cable single core 95/120/185mmsq | item67 | 1 | Mtr |
68 | 68 | Loading of PVC Cable single core 300/400/630mmsq | item68 | 1 | Mtr |
69 | 69 | Unloading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines | item69 | 1 | Mtr |
70 | 70 | Unloading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines | item70 | 1 | Mtr |
71 | 71 | Loading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines | item71 | 1 | Mtr |
72 | 72 | Loading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines | item72 | 1 | Mtr |
73 | 73 | Shifting of AB/XLPE25/35/50/70/95mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly in store premises | item73 | 1 | Mtr |
74 | 74 | Shifting of AB/XLPE120/150/185/240mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly in store premises | item74 | 1 | Mtr |
75 | 75 | Fabrication of Channel Cross Arms, V shape cross arms of sorts from MS Channel 100x50x6/75x40x5 BY WAY OF CUTTING TO SIZES, STRAIGHTING & DRILLING HOLES AS REQUIRED | item75 | 1 | Qtl |
76 | 76 | Loading of Aluminium and Copper wire | item76 | 1 | kg |
77 | 77 | loading of Bush Rods and other allied Workshop material | item77 | 1 | kg |
78 | 78 | Stacking of Single/Three phase meters in store premises | item78 | 1 | Nos |
79 | 79 | Fabrication of Angle iron braces /Belts/Guard Netting angles ,fencing posts etc from angle iron of sizes including driiling of holes at both ends | item79 | 1 | Qtl |
80 | 80 | Fabrication of fi ties ,fi clamps,BRACES AND U-CLAMPS, MUKKI CLAMPS, BACK CLAMPS, BRACE CLAMPS OF SORTS. from MS flat of different sizes including drilling of holes as required (suitable for 8 mtr, 9mtr,11 mtr and 13 mtr poles) | item80 | 1 | Qtl |
81 | 81 | Fabrication of Earthing Plates , Cable duct cover from MS plate of different sizes including holes as per REC Standards | item81 | 1 | Qtl |
82 | 82 | Fabrication of earthing spikes from MS tor steel of sorts as per REC Standards | item82 | 1 | Qtl |
83 | 83 | Fabrication of Guy rods, stay set including anchor plates and stringing screws.as per REC standards. | item83 | 1 | set |
84 | 84 | Fabrication of Guy rods | item84 | 1 | No |
85 | 85 | Fabrication of ST poles by way of drilling of extra holes | item85 | 1 | No |
86 | 86 | Making up of sort of holes in cross arms/angle iron braces/clamps as per requirement | item86 | 1 | No |
87 | 87 | Fabrication of foundation bolts from MS tor steel of sorts including threading as per REC Standards | item87 | 1 | No |
88 | 88 | Fabrication of fish plate1 mtr long as per REC Standards | item88 | 1 | No |
89 | 89 | Fabrication of Earthing pipe from GI pipe and welding of earthing plate as per REC Standards | item89 | 1 | No |
90 | 90 | Unloading/Loading of Straight jointer kit/Heat shrinkable Kit for AB/XLPE cables of HT/LT Lines | item90 | 1 | No |
91 | 91 | Unreeling of the ACSR Weasel/Squirell Conductor from the drum, measuring ,cutting ,bundling etc | item91 | 1 | Mtr |
92 | 92 | Re-reeling of the ACSR Weasel/Squirell Conductor etc | item92 | 1 | Mtr |
93 | 93 | Unreeling of the ACSR Dog/Rabbit conductor from the drum, measuring ,cutting ,bundling etc | item93 | 1 | Mtr |
94 | 94 | Re-reeling of the ACSR Dog/Rabbit conductor etc | item94 | 1 | Mtr |
95 | 95 | Unreeling of the XLPE/AB/PVC Single core cables of sizes from the drum, measuring , cutting ,bundling etc | item95 | 1 | Mtr |
96 | 96 | Re-reeling of the XLPE/AB/PVC Single core cables of sizes etc | item96 | 1 | Mtr |
97 | 97 | Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators with fittings, Pin insulators with pins etc | item97 | 1 | kg |
98 | 98 | Checking/Measuring/ Weighing of Line/Workshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc. | item98 | 1 | Kg |
99 | 99 | Unloading of Cement Bags | item99 | 1 | bag |
100 | 100 | Carrigae of Cement Bags from unloading site to stacking site\n(Upto 50 Mtr) | item100 | 1 | bag |
101 | 101 | Stacking of Cement bags | item101 | 1 | bag |
102 | 102 | Loading of Cement Bags | item102 | 1 | bag |
103 | 103 | Cutting of Green Vegetable Bushes , Wild Grass, trees in the store to avoid any mishappening of untoward incidents (covering periphery in and around the store premises) | item103 | 1 | Sqft |
104 | 104 | Carriage of Green Vegetable Bushes , Wild Grass, trees after cutting and dumping away from store (covering periphery in and around the store premises) | item104 | 1 | LS |
105 | 105 | Straightening of tilted fencing posts in the store premises for repair of fecning | item105 | 1 | No |
106 | 106 | Insertion of new fencing Posts in the store for repair of fencing | item106 | 1 | No |
107 | 107 | Dismantling of existing mesh fencing | item107 | 1 | Sqft |
108 | 108 | Fixing of mesh Fencing | item108 | 1 | Sqft |
109 | 109 | Fixiing of CGI Sheets | item109 | 1 | Sqft |
110 | 110 | Dismantling of CGI sheets | item110 | 1 | Sqft |
111 | 111 | Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 25/63/100 KVA | item111 | 1 | No |
112 | 112 | Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 250/400/630KVA | item112 | 1 | No |
113 | 113 | Lifting of Unserviceable items like, Damaged Transformers(Outer frame of DTs), Broken Insulators of sorts, ,Al/ Cu/ Scrap/ Bushrods of sorts, Empty barells, Broken CGI Sheerts, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking | item113 | 1 | Kg |
114 | 114 | Painting(Red oxide/Aluminium Paint) of Fabricated Material. | item114 | 1 | Kg |
115 | 115 | Loading of transformer oil (old/new) Barrel | item115 | 1 | No |
116 | 116 | Unloading of transformer oil (old/new) Barrel | item116 | 1 | No |
117 | 117 | Dragging of transformer oil (old/new) Barrel at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item117 | 1 | No |
118 | 118 | Dragging of transformer oil (old/new) Barrel at an average distance upto 50 Mtr for making space for other store material and its stacking | item118 | 1 | No |
119 | 119 | Unloading of old loose conductor and making bundles | item119 | 1 | Qtl |
120 | 120 | Checking & maggering of 11Kv LA set HG set GO set CT/PT unit | item120 | 1 | set |