| 1 | 1 | E/W in cutting or in embankment in ordinary soil incl. 1.5 m lift & 30 m lead at site including T&P required for proper completion of work etc all complete. | BI01010001010000000000000515BI0100001114 | 230 | cum |
|---|
| 2 | 2 | E/W in excavation in foundation in ordinary soil incl 1.5 m lift & 30 m lead. | BI01010001010000000000000515BI0100001115 | 244 | cum |
|---|
| 3 | 3 | CC in 1:6:12 with cement fine sand & 40mm gauge brick ballast in drain foundation incl. S/o all material labour T&P etc all complete. | BI01010001010000000000000515BI0100001116 | 49 | cum |
|---|
| 4 | 4 | M-150 B/W in 1:4 with cement & sand mortar in fd & plinth incl. S/o all material labour T&P etc all complete. | BI01010001010000000000000515BI0100001117 | 137 | cum |
|---|
| 5 | 5 | 12mm thick plaster in 1:4 with cement & sand mortar in drain in side incl. S/O all material labour T&P etc all complete. | BI01010001010000000000000515BI0100001118 | 763 | sqm |
|---|
| 6 | 6 | P/L CC in 1:2:4 with cement coarse sand and 20mm stone grit including material etc all complete. | BI01010001010000000000000515BI0100001119 | 5 | cum |
|---|
| 7 | 7 | Construcion of granularsub-base by providing well graded material, spreading in uniform layer with motor grader on prepared surface, mixing by mix in place method with rotavtor at OMC and compactin with vibratory roller to achieve the desire density, complete as per clause 402. | BI01010001010000000000000515BI0100001120 | 83 | cum |
|---|
| 8 | 8 | Providing & Laying 80mm thick rubber moulded inter locking paver brick incl laying etc all complete. | BI01010001010000000000000515BI0100001121 | 834 | sqm |
|---|
| 9 | 9 | RCC work in 1:2:4 with cement course sand & 11-20 mm guage stone grit in culvert slab incl all complete. | BI01010001010000000000000515BI0100001122 | 3 | cum |
|---|
| 10 | 10 | MS iron works in plain work such as RCC or RB work incl. banding, binding cutting its making hoocks all complete. | BI01010001010000000000000515BI0100001123 | 2 | qtl |
|---|
| 11 | 11 | S/F of information boad including supply of material and labour required for completion of work etc all comp. | BI01010001010000000000000515BI0100001124 | 1 | job |
|---|
| 12 | 12 | Cartage of earth work from upto 4km distance by machine truck/tractor etc all unloading at site. | BI01010001010000000000000515BI0100001125 | 208 | cum |
|---|