Construction Of Bsl 2 Plus Lab Setup Negative Pressure Room At Riims Ranchi
Tender Overview
Project Description
Construction Of Bsl 2 Plus Lab Setup Negative Pressure Room At Riims Ranchi
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 28-May-2021 | Corrigendum | Other | 01-Jun-2021 |
BOQ
| Name of Work:Construction of BSL 2 + Lab setup(Negative Pressure Room ) at RIIMS Ranchi | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Supply AHU\nØ Capacity: 3000 CFM\nØ Double skin AHU complete with mixing box, Cooling coil, fan, volume control dampers for Supply, fresh air, fresh air filter. \nØ Static Pressure (mm wg) - 100 \nØ Construction – 28 mm Puf Moulded Double Skin Detachable Panels\nØ Structural - Extruded Spl Alloy Al Profiles filled with PUF\nØ Panel - External Skin - 0.6 mm Pre plasticised Sheet \nØ Panel - Internal Skin - 0.6 mm Plain GI Sheet \nØ Insulation Material/thickness - 25mm Thick Puf with 45kg/m3 density \nØ Fan Make & Type - Nicotra/Kruger make DIDW Backward Curve Centrifugal Fan\nØ Fan Wheel size & No. of Fans - RDH 315R #1 \nØ Fan Speed in RPM – 2381, Critical Fan Speed in RPM – 3100\nØ Fan Outlet Velocity in mps - 8.68\nØ Motor \nØ Drive Arrangement - Taper Lock Pulleys for Fan & Motor Both\nØ Type of Balancing/Test Procedure - Statically & Dynamically/AMCA Tested \nØ Type of Vibration Isolators - Rubberized Mounts \nØ Filters Provision - Pre-Filters & HEPA filters \nØ Coil Type - Cooling Coil \nØ Coil Surface Area - Sq. ft - 6.11\nØ No. of. Coil Rows- 6 \nØ Face Velocity Across the coil - 491 \nØ Coil Specification - 1/2 \" OD 27SWG Copper & 36 SWG AI Fin at FPI \nØ Canvass - SRF make Flexible Fire-Retardant Canvass\nØ Hardware - Galvanized, Operation Wt (Kgs) - Approx. – 240\nAHU Control Panel\nØ Temperature, Humidity, Day Clock, Elapsed Clock, Gas Alarm and Telephone / FM Set\nØ Condensing unit: Supply and Installation of Condensing unit with 11 Tr capacity Including, Gas, Copper tubing, Drier & expansions valves etc\nØ Dampers: Galvanized steel Volume controlled damper, Opposed / parallel Blade Dampers are used to carry out a rough air system balance with closer control being carried out at the individual grilles or diffusers.\nSupply & Return Air Grills \nØ MOC: CRCA powder Coated, 1.2 mm thick with perforation\n\nWith complete Installation, freight , packaging and miscellaneous\n | 1 | Nos | |
| 2 | 2 | Exhaust AHU \nØ Capacity: 3500 CFM\nØ Double skin AHU complete with mixing box, volume control dampers for return, fresh air \nØ Static Pressure (mm wg) - 100 \nØ Construction - 28mm Puf Moulded Double Skin Detachable Panels\nØ Structural - Extruded Spl Alloy Al Profiles filled with PUF\nØ Panel - External Skin - 0.6 mm Pre plasticised Sheet \nØ Panel - Internal Skin - 0.6 mm Plain GI Sheet \nØ Insulation Material/thickness - 25mm Thick Puf with 45kg/m3 density \nØ Fan Make & Type - Nicotra/Kruger make DIDW Backward Curve Centrifugal Fan\nØ Fan Wheel size & No. of Fans - RDH 315R #1 \nØ Fan Speed in RPM - 2381 \nØ Critical Fan Speed in RPM – 3100\nØ Fan Outlet Velocity in mps - 8.68\nØ Motor \nØ Drive Arrangement - Taper Lock Pulleys for Fan & Motor Both\nØ Type of Balancing/Test Procedure - Statically & Dynamically/AMCA Tested \nØ Type of Vibration Isolators - Rubberized Mounts \nØ Filters Provision - Pre-Filters, HEPA filters Hardware etc\nØ Ducting: Ventilation ducting will be made out of minimum 24-gauge GI sheet, exhaust duct from the lab to the AHU will be 24 Gauge GI Duct. All the ventilation ducting including return air riser will be leak proof. Insulation material with Nit Rile foam/cross linked Polyethylene material (Aluminum Foil insulation)\nØ With complete Installation, freight and forwarding\n | 1 | Non | |
| 3 | 3 | Ceiling Panel: Modular ceiling: Modular ceiling will be made for Clean Room application, pre-engineered 50 mm thick PUF panels with PCGI Sheets with PUF insulation of minimum 38-40 kg/m3. Both surfaces should be power coated 0.6 mm thick PCGI sheet and will be installed along the outer walls, partitions and false ceiling to create an impervious shell which is fully sealed. With complete Installation, freight and forwarding | 640 | Sq.ft | |
| 4 | 4 | Modular wall: Modular wall will be made for Clean Room application, pre-engineered 50 mm thick PUF panels with PCGI Sheets with PUF insulation of minimum 38-40 kg/m3. Both surfaces should be power coated 0.8 mm thick PCGI sheet and will be installed along the outer walls, partitions and false ceiling to create an impervious shell which is fully sealed. With complete Installation, freight and forwarding | 1540 | Sq.ft | |
| 5 | 5 | Covings: Extruded aluminum anodized R75 clip-on type (Male & Female connectors) covings for entire wall to floor, wall to wall & wall to ceiling joints. Extruded aluminum double cove integrated with top track of the partition panels. Corner internal & external cove joining pieces in aluminum anodized finish. Having similar construction and finish as the walls and properly sealed with silicon sealant with wall & ceiling. With complete Installation, freight and forwarding | 180 | Rmt | |
| 6 | 6 | Epoxy Flooring: Flooring shall be of 3 mm of industrial epoxy including screed compound for adhesion with bubble free perfect smooth finishing completed into two steps: Hardening and smoothening. Epoxy used for this application will be self-leveling and clean room compatible. With complete Installation, freight and forwarding | 640 | Sq.ft | |
| 7 | 7 | Epoxy coving | 240 | Rft | |
| 8 | 8 | 3D internal corners coves at corners | 33 | No | |
| 9 | 9 | 2D internal corners coves at corners | 5 | No | |
| 10 | 10 | Modular Clean Room Door | |||
| 11 | 10.01 | Flush Door finishes shall be 50 mm thick 1.2mm thick PCGI sheet suitable to fix on 50 mm thick wall panel with provisions for double glazing glass for all door and hardware like push plate. PUF Panels will be with PCGI Sheets, powder coated on both sides and PUF insulation of minimum 38-40 kg/m3. Concealed hardware for fixing of door frames, door closure, SS hinges, SS Door handle, SS ball bearing butt hinges, automatic drop seal, concealed tower bolt for the double door, both sides lock and key arrangement etc. With complete Installation, freight, packaging and miscellaneous | |||
| 12 | 10.02 | Size: (Single Door) 900 x 2100 mm | 8 | No | |
| 13 | 10.3 | Size: (Double Door) 1200 x 2100 mm | 1 | No | |
| 14 | 11 | Differential Pressure Gauge | |||
| 15 | 11.01 | Supply, Installation of Dwyer make Magnahelic Pressure gauges 0 – 10 mm for monitoring differential room pressures. With complete Installation, freight and forwarding | 3 | No | |
| 16 | 12 | Door Interlocking System\nStatic Pass Box: \n | 2 | No | |
| 17 | 13 | MOC: SS 304 Size: 2’ x 2’ x 2’, \n\nDoor, Interlocking system, UV light, Fluorescent Lamp etc. With complete Installation, freight and forwarding\n | 1 | No | |
| 18 | 14 | Electricals: Required electrical arrangements for the purpose of energizing the BSL-3 Laboratory facility All the electrical fittings and fixtures in the laboratory’s areas shall be suitable for clean room application and shall be sealed (all conduits, outlets shall be sealed with silicon sealant), leak proof and capable to withstand chemical exposures during fumigation with LAN wiring (Internet connection points). With complete Installation, freight and forwarding | 1 | Lot | |
| 19 | 15 | Drain: All liquid drain coming out from the laboratory will be connected to a single drain with back flow prevention. With complete Installation, freight and forwarding | 1 | Lot | |
| 20 | 16 | Water Supply: Water supply to the BSL-3 Laboratory shall be provided through the existing Water distribution network in campus. All the necessary and required arrangements for tapping and extension of existing water line from the adjacent building. With complete Installation, freight and forwarding | 1 | Lot | |
| 21 | 17 | Bio Safety Cabinet Class II Type B2 Unit\n\nSize: 4 Feet, \n\nMOC: CRCA Powder Coated\n | 2 | No | |
| 22 | 18 | Vertical Laminar Airflow Unit\n\nSize: 4 Feet, \n\nMOC: CRCA Powder Coated\n | 1 | No | |
| 23 | 19 | Supply and Installation of 1.5 TR Split AC\n\nBrand: Hitachi / Samsung or Equal\n | 5 | No | |
| 24 | 20 | LED Lights Size: 6” x 6”\n\nBrand: Phillips / Syska / Orbit or Equal\n | 30 | No | |
| 25 | 21 | Bio Metric System | 1 | No | |
| 26 | 22 | Computer with Table\n\nBrand: Dell/HP / Lenovo or Equal\n | 1 | No | |
| 27 | 23 | ESD Lab Chairs ( protects from electric discharge)\n\nBrand- Fullstock, Accumen and equivalent\n\nWith transportation and packaging\n | 5 | No | |
| 28 | 24 | Shoe Rack: Size – 1’ x 2’ ( with installation, packing and transportation) | 1 | No | |
| 29 | 25 | Work Table: Size – 4’ x 2’ ( with transportation, packing and installation) | 1 | No | |
| 30 | 26 | SS Rack: Size – 5’ x 2'x3’ ( with installation and transportation) | 1 | No | |
| 31 | 27 | Clean Room Hanger | 2 | No | |
| 32 | 28 | 12 % GST | BI01010001010000000000000515BI0100001157 | 12 | GST |
| 33 | 29 | 1% Labour Cess | BI01010001010000000000000515BI0100001158 | 1 | Cess |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.