General-Urgent Removal Of Earth Slips And General-Urgent Removal Of Earth Slips And Boulders In Various Roads Under Roads Section , Kumily . -Urgent Removal Of Earth Slips And Boulders In Various Roads Under Roads Section , Kumily . -General Civil W
Tender Overview
Project Description
General-Urgent Removal Of Earth Slips And General-Urgent Removal Of Earth Slips AndBoulders In Various Roads Under Roads Section , Kumily . -Urgent Removal Of Earth Slips AndBoulders In Various Roads Under Roads Section , Kumily . -General Civil Work
BOQ
| Work Name:GENERAL-Urgent removal of earth slips and boulders in various roads under roads section ,Kumily.-Urgent removal of earth slips and boulders in various roads under roads section ,Kumily.-General Civil Work | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Removal of land slide. | |||
| 2 | 1.001 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | BI01010001010000000000000515BI0100001114 | 877.5 | cum |
| 3 | 1.002 | 3.7:Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. | BI01010001010000000000000515BI0100001115 | 880 | cum |
| 4 | 1.003 | 3.8.A:Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. \r\nMechanised | BI01010001010000000000000515BI0100001116 | 88 | cum |
| 5 | 1.004 | 2.1.2:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. \r\nGirth from 600 mm to 900 mm | BI01010001010000000000000515BI0100001117 | 15 | each |
| 6 | 1.005 | 10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. | BI01010001010000000000000515BI0100001118 | 440 | sqm |
| 7 | 1.006 | 10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually | BI01010001010000000000000515BI0100001119 | 600 | metre |
| 8 | 1.007 | 10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side | BI01010001010000000000000515BI0100001120 | 360 | cum |
| 9 | 1.008 | 10.13:Clearing of land slide in hard rock requiring blasting for 50 per cent of the boulders and disposal of the same on the valley side. | BI01010001010000000000000515BI0100001121 | 170 | cum |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender