| 1 | 1 | Supply of 100 micron polythene under bed lining as per drawing design and as per approved designed section and PWD specification(N.S.)(As per CADA) | | 47 | Kg |
|---|
| 2 | 2 | Dressing bed & preparation of subgrade for lining. HSR item No. 19.1 | | 503.33 | Sqm |
|---|
| 3 | 3 | Laying of 100 micron polythene under bed lining as per drawing, design and PWD specification (N.S.item)(As per CADA). | | 503.33 | Sqm |
|---|
| 4 | 4 | Ist.class brick work laid in cement sand mortar 1:5 in foundation and plinth (Bed Lining). HSR item No. 11.3 | | 503.33 | Sqm |
|---|
| 5 | 5 | Cement conc. 1:4:8 with brick ballast 40mm nominal size in foundation and plinth.(For Nakka,Culvert etc). HSR item No. 10.36 | | 7.43 | Cum |
|---|
| 6 | 6 | First class brick laid in cement sand mortar 1:5 in foundation and plinth (For Side Lining, Nakka & Culverts). HSR item No. 11.3 | | 95.81 | Cum |
|---|
| 7 | 7 | Extra for brick work in arches including cost of shuttering up to 1.5m span. HSR item No. 11.44 (a) | | 2.44 | Cum |
|---|
| 8 | 8 | Laying 1st class brick work in 1:3 cement sand mortar in foundation and plinth as per approved design,drawing & PWD Specification i/c supply & carriage of material Complete in all respact. HSR item No. 11.5 | | 2.44 | Cum |
|---|
| 9 | 9 | Plasterting on walls Nakka & Culverts 10mm thick cement plaster 1:4 (laying fillet Gola ). HSR item No. 15.5 | | 181.8 | Sqm |
|---|
| 10 | 10 | E/work excavation in ordinary soil exclusive of compensation of earth- Earth- work undressd with combined lead upto 15 meters including breaking of clods and dressing of earth work- new work or remodelling work for Undressed/trenches. HSR item No. 6.2 (b) + 6.3 (i) | | 23.38 | 100 Cum |
|---|
| 11 | 11 | Kassi work undressed involving an average horizontal throw upto 2 metres, and an average vertical lift upto 0.50 metre i/c breaking of clods. HSR item No. 6.2 (a) | | 7.75 | 100 Cum |
|---|
| 12 | 12 | E/work excavation in ordinary soil exclusive of compensation of earth- Earth- work undressd with combined lead upto 15 meters including breaking of clods as per approved design, drawing & PWD specifications. HSR item No. 6.2 (b) + 6.3 (i) | | 579.31 | 100 Cum |
|---|
| 13 | 13 | E/work (exclusive of compensation for earth) in excavation in ordinary soil and filling , in 15 cm layers , in foundation & plinth i/c ramming, watering & consolidation under flors, with earth brought from a distance not exceeding 30 mtrs.(under Bed). HSR item No. 6.13 (b) | | 134.19 | 100 Cum |
|---|
| 14 | 14 | Supply of RCC pannel of requisite sizes 30\"X30\" at site of work as per approved drawing design & PWD specification (As per CADA) | | 15 | Each |
|---|
| 15 | 15 | Fixing of RCC pannel of requisite sizes 30\"X30\" at site of work as per approved drawing design & PWD specification (As per CADA) | | 15 | Each |
|---|
| 16 | 16 | Supply carriage and fixing of RCC lid of requisite sizes 24\" dia as per approved drawing design & PWD specification (as per CADA) | | 8 | Each |
|---|