| 1 | 1 | Maintenance of water supply and gardening and allied works in all applicable days including all T& P's and safety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc., | item 1 | 365 | Operation |
|---|
| 2 | 2 | Cleaning the toilet & utilities in Power House, office building for 300 days including safety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc.,etc.( except sundays and national holidays) but excluding cost of T&P and consumbales. | item 2 | 6000 | No |
|---|
| 3 | 3 | Sweeping, cleaning the inside (150 days) the power house , Offices and other buildings and clear away the debris from the location including safety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc., complete but excluding cost of T&P and consumbales.( Inner area) | item 3 | 264150 | Sqm |
|---|
| 4 | 4 | Sweeping, cleaning the out side (once in a week) the power house , Offices and other buildings and clear away the debris from the location including safety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc., complete but excluding cost of T&P and consumbales.( Outside area) | item 4 | 286468 | Sqm |
|---|
| 5 | 5 | Thorough cleaning of cob web and dirts on wall inside, outside and ceiling of Power House and other office buildings and clear away the debris from the location including safety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc., complete. ( Once in 4 months - 3 operations - inside 60% of the total area and outside 25% of the total area) but excluding cost of T&P and consumbales. | item 5 | 10964 | Sqm |
|---|
| 6 | 6 | Cleaning of open drain in Power House, Office and quaters building etc, and clearing away the debris from the location including safety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc.,complete.( Camp drains once in a week and Power House & Rain water once in a month) but excluding cost of T&P and consumbales. | item 6 | 53712 | RM |
|---|
| 7 | 7 | Cleaning of silt traps and inspection chamber/man holes clear away the debris from the location including safety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc., complete.( 4 Operations per year) but excluding cost of T&P and consumbales. | item 7 | 80 | Nos |
|---|
| 8 | 8 | Attending Masonry work / carpentry works including all safety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc., | item 8 | 12 | Operation |
|---|
| 9 | 9 | Cleaning of sewer line including removing the block wherever required and clear away the debris from the location including all safety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc.,complete but excluding cost of T&P and consumbales. | item 9 | 200 | RM |
|---|
| 10 | 10 | Cleaning of ground level water tanks and over head water tanks by removing and placing in position of cover slabs and through cleaning of inner wall surfaces using bleaching powder etc., once in a month as directed by the Engineer in charge etc., complete including all safety appliances as required.but excluding cost of T&P and consumbales. | item 10 | 1337 | Sqm |
|---|
| 11 | 11 | Cleaning of Soil chutes and dust bins, twice in a week and depositing the same as directed by the Engineer in charge etc., complete including all safety appliances as required.but excluding cost of T&P and consumbales. | item 11 | 1872 | No |
|---|