Construction Of M . R . F . Center , Boundary Wall , Interlocking And Lichid Collection Tanks Construction Of M . R . F . Center , Boundary Wall Of Scientific Land , Interlocking And Liched Collection Tanks
Tender Value
41 Lakhs
Estimated cost
Bid Submission
26 May 2021
0 days left
EMD
82002
Bank guarantee accepted
Document Fee
4838
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Shahabad → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of M . R . F . Center , Boundary Wall , Interlocking And Lichid Collection Tanks Construction Of M . R . F . Center , Boundary Wall Of Scientific Land , Interlocking And Liched Collection Tanks
BOQ
| Name of Work: Construction Of Material Recovery Facility ( M.R.F.) Centre & Scientific Land Filled Site With Boundary Wall & Interlocking Liched Collection Tank In Moh. Tajpura Shahabad | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | M.R.F. Center Construction & Boundary Wall With Interlocking Collection Tank Work | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.01 | Earthwork in excavation for structures As Per Drawing And technical specification clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitablr material\n1X81X0.90X1.70 =123.93\n1X110.00X1.30X1.00 = 143.00\n1X5.40X5.40X3.00 = 87.48 Total - 354.41 | BI01010001010000000000000515BI0100001113 | 354.41 | cum. |
| 3 | 1.02 | Plan cement cocrement 1:6:12 nominal mix in foundation with crushed aggregate 40mm nominal size mechanically mixed, placed in foundation and compected by vibration including curing for 14 days .\n1X81X0.90X0.15 = 10.94\n1X110X1.30X0.15 =21.45\n1X5.40X5.40 0.20 =5.83 Total - 38.217 | BI01010001010000000000000515BI0100001114 | 38.217 | cum. |
| 4 | 1.03 | Constructtion of granular sub-base by providing well graded material, spreading in uniform layers wih motor grade on prepared surface, mixing by mix in place method with rotavtor at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.\n1X30X8.20X0.15= 36.90\n1X41X16.20X0.15 = 99.63 Total- 136.53 | BI01010001010000000000000515BI0100001115 | 136.53 | cum. |
| 5 | 1.04 | Brick Masonry work in 1:4 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications clauses 600,1202,&1203\n1X81X0.69X0.30 = 16.77\n1X81X0.58X0.45= 21.14\n1X81X0.46X0.45 = 16.77\n1X81X0.35X0.30 =8.51\n1X110X1.30X0.12= 17.16\n2X110X0.35X0.30= 23.10\n2X110X0.23X0.45 = 22.77 Total - 126.21\n | BI01010001010000000000000515BI0100001116 | 126.21 | cum. |
| 6 | 1.05 | Brick Masonry work in 1:3 cement mortar in super structure complete excluding pointing and plastering as per drawing and technical specifications clauses 600,1202,&1203\n1X81X0.23X3 = 55.89\n2X5X0.23X2.80 = 6.44\n2X4.54X0.23X2.80 = 5.85\nDeduction\n2X5X0.23X3= -6.90 Total - 61.27752 | BI01010001010000000000000515BI0100001117 | 61.2775 | cum. |
| 7 | 2 | Furnishing and placing reinforced cement concrement in super structure as per drawing and Technical Specification . M20 (1:2:4) \n27X0.69X0.69X0.60=7.71\n27X0.58X0.58X0.45 = 4.09\n27X0.46X0.46X0.45 = 2.57\n27X0.35X0.35X0.30 = 0.99\n27X0.35X0.35X3 = 9.92\nPlinth band\n1X81X0.35X0.35 = 9.92\nCover on Drainage\n1X110X1X0.10 = 11\n1X5.25X5.25X0.12= 3.31\n1X5X5X0.12= 3 Total = 52.51577\n\n | BI01010001010000000000000515BI0100001118 | 52.5158 | cum. |
| 8 | 3 | Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specification clauses.\n1%\[email protected] Qtls 41.22 \n Total - 41.22488 | BI01010001010000000000000515BI0100001119 | 41.2249 | cum. |
| 9 | 4 | Plastering with cement mortar (1:4) 15mm thick on brickwork in substructure/ superstracture as per technical specification.\n1X81X3 =243\n1X110X2.50 =275\n1X5X5= 25\n2X5X2.80=28\n2X4.54X2.80= 25.42\nDeduction\n2X5X3 = -30 Total- 566.4240 | BI01010001010000000000000515BI0100001120 | 566.424 | cum. |
| 10 | 5 | Providing and fixing of MS steel structure under G.I. Sheet including cost of material labour and T&P and all completion of work\nGate\n2X5X3 = 30\n55kg per Sqm.\n 55kg per Sqm. Qtls. 16.50 | BI01010001010000000000000515BI0100001121 | 16.5 | Qtls |
| 11 | 6 | Finnishing walls with water profing cement paint ………including all labbour material and T&P and proper completion of the work\n2X81X3=486\nDeduction\n2X5X3 = -30 Total = 456 | BI01010001010000000000000515BI0100001122 | 456 | sqm. |
| 12 | 7 | Providing and applying white cement based putty …….including all labour materials and T&P and proper completion of the work.\nQty same as above item =456 | BI01010001010000000000000515BI0100001123 | 456 | sqm. |
| 13 | 8.01 | White washing two coat ….. Including all labour material and T&P and proper completion of the work.\n Qty same as above item = 456 | BI01010001010000000000000515BI0100001124 | 456 | sqm. |
| 14 | 8.02 | Laying of 80 mm thick pre moulded inter locking paver tiles including 4cm thick coarse sand bed over prepared surface including all labour T&P etc. required for proper complection of work.\n1X30X8.20 = 246\n1X41X16.20 = 664.20 Total - 910.20 | BI01010001010000000000000515BI0100001125 | 910.2 | sqm. |
| 15 | 8.03 | Grand Total | BI01010001010000000000000515BI0100001126 | 1 | Nos |
| 16 | 9 | Others Work as Electrification & Miscellenous Work\nfrom S.No. 8.03 X4% | BI01010001010000000000000515BI0100001127 | 3.52001e+06 | Percentange |
| 17 | 10 | GST on Construction Work @12% | BI01010001010000000000000515BI0100001128 | 3.66081e+06 | Percentange |
AI Tender Summary
Tender Timeline
May 20, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedMay 26, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMay 26, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender