| 1 | 1 | Construction of C.C Road and Drain | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 2 | Excavation in foundation in ordinary soil(Loam clay or sand) including lift up to 1.5meter (5ft) and lead upto 30m (100ft) and including filling warening & rimming of excavated earth into the trenches or into the space between the building and the sides of SI No. 251 | BI01010001010000000000000515BI0100001113 | 21.12 | cum |
|---|
| 3 | 3 | Sand fillling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km. (5mile) from the site of work and including watering dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of the work. SI. No. 255 | BI01010001010000000000000515BI0100001114 | 6.8 | cum |
|---|
| 4 | 4 | Concrete with 4 cm. gauge stone ballast fine sand of 1.25fm and cement in proportion of 1:4:8 in foundation and under floors with ass labour for completion of work SI No. 281 | BI01010001010000000000000515BI0100001115 | 32.54 | cum |
|---|
| 5 | 5 | R.C.C. works cement appoved coatsesand and 2cm gauge approved stone ballast in the proportion 1:1.5:3 in flooring of drain excluding supply of reingrcement and its binding , but including its fixing and binding the same with 24 B.W.G.I. binding wire an including necessary cantering and shuttening etc.SI. No. 282 | BI01010001010000000000000515BI0100001116 | 0.12 | cum |
|---|
| 6 | 6 | R.C.C. works cement appoved coatsesand and 2cm gauge approved stone ballast in the proportion 1:1.5:3 in wall,s and slab,s of drain excluding supply of reingrcement and its binding , but including its fixing and binding the same with 24 B.W.G.I. binding wire an including necessary cantering and shuttening etc. SI. No. 284 | BI01010001010000000000000515BI0100001117 | 13.915 | cum |
|---|
| 7 | 7 | Mild steet of iron in plain work such as reinforced concrete/brick work (which not including all over rates) wrought to required shape as necessary including bending supply of steel, its wastage and hook and authorized over lapping shall be measured. SI. No. 504 | BI01010001010000000000000515BI0100001118 | 8.814 | qtl |
|---|
| 8 | 8 | Laying of PCC in M 30 Grade with OPC Cement , sand and 25 mm Granite grit including supply of all material labour and TNP with 125 micron palstic sheet etc for proper completion of the work in road SI No. 6.4 chapter no. 6 | BI01010001010000000000000515BI0100001119 | 38.25 | cum |
|---|
| 9 | 9 | Laying pcc in 1:1.5:3 | BI01010001010000000000000515BI0100001120 | 5.1 | cum |
|---|
| 10 | 10 | Supply and fixing of granite stone withe letter writting of boards in completed one job. | | 1 | Job |
|---|
| 11 | 14 | Add 12% GST | | 1 | job |
|---|