Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Periodical Cleaning Of All Drains In Bottom Ash Hopper Plant Area Boiler Area And Mill Area In Unit_I_Ii And Iii And C Row Drain At Power House For A Period Of Six Months From The Date Of Commencement. Submission Date for this Tender is 02-06-2021. Desilting Tenders in NCTPS I Tamil Nadu. Bidders can get complete Tender details and download the document.
Name of Work:NCTPS-I-CM-Circle -CM-I- Periodical cleaning of all drains in Bottom ash hopper plant area, boiler area and mill area in Unit-I, II & III and C row drain at Power House for a period of six months from the date of commencement. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Removal of wet ash, waste, coal and debris etc, deposited in drains and disposal of the same at a distance of 3 KM away from the site including cost of labour, lead, lift ,loading and unloading, T&P etc., complete as directed by the Engineer at site. a. Boiler area drains | Removal of wet ash, waste, coal Boiler area | 12 | Operations |
2 | 2 | (B) Power House and Mill area | Power House mill | 6 | Operations |
3 | 3 | Removal of drain cover slab from the position and stacked in one location and after cleaning of drains relaying the same in position including cost of all materials, labour, lead, lift, etc., complete | Removal of drain cover slab | 3180 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail