Pkg Ii/2021-22 Construction Of 30 Mtr Span Steel Bridge Over Ghattey In East Sikkim . , East SIkkim-Sikkim

Pradhan Mantri Gram Sadak Yojana-PMGSY has published Pkg Ii/2021-22 Construction Of 30 Mtr Span Steel Bridge Over Ghattey In East Sikkim . . Submission Date for this Tender is 01-07-2021. Bridge Work Tenders in East SIkkim Sikkim. Bidders can get complete Tender details and download the document.




Tender Notice

27935277
Corrigendum : Pkg Ii/2021-22 Construction Of 30 Mtr Span Steel Bridge Over Ghattey In East Sikkim .
Open Tender
Indian
Sikkim
East SIkkim
01-07-2021

Tender Details

Pkg Ii/2021-22 Construction Of 30 Mtr Span Steel Bridge Over Ghattey In East Sikkim .

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 09-Jun-2021 Addendum Other 19-06-2021
2 14-Jun-2021 POSTPONMENT Date 01-07-2021

Key Value

Document Fees
INR 30000 /-
EMD
INR 633698.0 /-
Tender Value
INR 2.53 Crore /-

BOQ Items

Name of Work:(Dochug to beng) Construction of 30 Mtr Span Steel Bridge over Ghattey in East Sikkim.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Construction of 30 Mtr Span Steel Bridge over Ghattey in East Sikkim. BI01010001010000000000000515BI0100001112
2 1.1 (ii) Excavation in Hilly Areas in Soil by mechanical means. BI01010001010000000000000515BI0100001113
3 1.101 (A) Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification Clause 1603.1 BI01010001010000000000000515BI0100001114 2100 Cum
4 1.102 Construction of Embankment with material obtained from Roadway cutting BI01010001010000000000000515BI0100001115
5 1.103 Construction of Embankment with approved material deposite at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical specification Clause 301.5 BI01010001010000000000000515BI0100001116 180 Cum
6 1.104 Compacting Original Ground. BI01010001010000000000000515BI0100001117
7 1.105 (ii) Compacting original ground supporting subgrade. BI01010001010000000000000515BI0100001118
8 1.106 Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers for subgrade construction as per Technical Specification Clause 303.5.2. BI01010001010000000000000515BI0100001119 600 Sqm
9 1.107 Granular Sub-Base with well graded material (Table 400.1) BI01010001010000000000000515BI0100001120
10 1.108 (A) By Mix in Place Method. BI01010001010000000000000515BI0100001121
11 1.109 Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix-in-place method with rotavator at OMC, and compacting with smooth wheeled roller to achieve the desired density, complete as per technical specification clause 401. BI01010001010000000000000515BI0100001122
12 1.11 (i) For Grading I Material. BI01010001010000000000000515BI0100001123 75 Cum
13 1.111 Water Bound Macadam with Crushable Screenings BI01010001010000000000000515BI0100001124
14 1.112 (2) WBM Grading 2 BI01010001010000000000000515BI0100001125
15 1.113 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. BI01010001010000000000000515BI0100001126
16 1.114 (A) By manual means. BI01010001010000000000000515BI0100001127 45 Cum
17 1.115 (3) WBM Grading 3 BI01010001010000000000000515BI0100001128
18 1.116 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. BI01010001010000000000000515BI0100001129
19 1.117 (A) By manual means. BI01010001010000000000000515BI0100001130 45 Cum
20 1.118 Prime Coat BI01010001010000000000000515BI0100001131
21 1.119 (i) Low porosity BI01010001010000000000000515BI0100001132
22 1.12 Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.2-1.5 kg/sqm using mechanical means as per Technical Specification Clause 502. BI01010001010000000000000515BI0100001133 462.5 Sqm
23 1.121 Tack Coat BI01010001010000000000000515BI0100001134
24 1.122 (iii) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with primer and cleaned with Hydraulic broom as per Technical Specification Clause 503. BI01010001010000000000000515BI0100001135 462.5 Sqm
25 1.123 20mm thick Open-Graded Premix Carpet BI01010001010000000000000515BI0100001136
26 1.124 20 mm thick Open Graded Premix Carpet using Bitumen Emulsion as per Technical Specification Clause 508.2 BI01010001010000000000000515BI0100001137
27 1.125 By Manual Means BI01010001010000000000000515BI0100001138 462.5 Sqm
28 1.126 Seal Coat BI01010001010000000000000515BI0100001139
29 1.127 Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 BI01010001010000000000000515BI0100001140
30 1.128 Type B(ii) Bitumen (S-65) BI01010001010000000000000515BI0100001141 462.5 Sqm
31 1.129 Construction of earthen shoulder. BI01010001010000000000000515BI0100001142
32 1.13 Construction of subgrade and earthen shoulder with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compavted to meet requirement of table 300.2 with lead upto 1000m as per technical specification clause 303.1. BI01010001010000000000000515BI0100001143 45.4 Cum
33 1.131 Loading and unloading of Lime, Aggregates, Stone boulder,Brick Aggregates etc. by manual means BI01010001010000000000000515BI0100001144
34 1.132 i) Loading of aggregates BI01010001010000000000000515BI0100001145 211.4 Cum
35 1.133 ii) Loading of sand BI01010001010000000000000515BI0100001146 31.5 Cum
36 1.134 Loading and unloading of Lime, Aggregates, Stone boulder,Brick Aggregates etc. by Mechanical means BI01010001010000000000000515BI0100001147
37 1.135 iii) Unloading of aggregates BI01010001010000000000000515BI0100001148 211.4 Cum
38 1.136 iii) Unloading of sand BI01010001010000000000000515BI0100001149 31.5 Cum
39 1.137 Loading and unloading of Bitumen drums by manual means including a lead upto 30m BI01010001010000000000000515BI0100001150
40 1.138 i) Loading of Bitumen drums by manual means including a lead upto 30m BI01010001010000000000000515BI0100001151 2.1 ton
41 1.139 ii) Unloading of Bitumen drums by manual means including a lead upto 30m BI01010001010000000000000515BI0100001152 2.1 ton
42 1.14 Haulage excluding Loading and Unloading BI01010001010000000000000515BI0100001153
43 1.141 Haulage of materials by tipper excluding cost of loading, unloading and stacking BI01010001010000000000000515BI0100001154
44 1.142 Case-I : Surfaced road BI01010001010000000000000515BI0100001155
45 1.143 a) Sand lead distance 50 Km BI01010001010000000000000515BI0100001156 2900 T/Km
46 1.144 b) Aggregates ad distance 50 Km BI01010001010000000000000515BI0100001157 18400 T/Km
47 1.145 c) Bitumen ad distance 125 Km BI01010001010000000000000515BI0100001158 259.3 T/Km
48 1.146 Case-III : Katcha Track BI01010001010000000000000515BI0100001159
49 1.147 a) Sand lead distance 15 Km BI01010001010000000000000515BI0100001160 870 T/Km
50 1.148 b) Aggregates lead distance 15 Km BI01010001010000000000000515BI0100001161 5520 T/Km
51 1.149 c) Bitumen lead distance 0.0 Km BI01010001010000000000000515BI0100001162
52 1.15 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps ,Dewatering,Shoring and shuttering and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. BI01010001010000000000000515BI0100001163
53 1.151 Ordinary soil BI01010001010000000000000515BI0100001164
54 1.152 Upto 3 m depth BI01010001010000000000000515BI0100001165 655.1 cum
55 1.153 3 m to 6 m depth BI01010001010000000000000515BI0100001166 125.8 cum
56 1.154 Ordinary rock BI01010001010000000000000515BI0100001167 436.7 cum
57 1.155 Hard rock (requiring blasting) BI01010001010000000000000515BI0100001168 83.9 cum
58 1.156 Hard rock (blasting prohibited) BI01010001010000000000000515BI0100001169
59 1.157 Filling annular space around footing in rock as per technical specification Clause 1203.4.3. BI01010001010000000000000515BI0100001170
60 1.158 P.C.C grade M 15 (Nominal mix 1:2.5:5) BI01010001010000000000000515BI0100001171 33.2 cum
61 1.159 Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 BI01010001010000000000000515BI0100001172
62 1.16 P.C.C grade M 15 BI01010001010000000000000515BI0100001173
63 1.161 Nominal mix (1:2.5:5) BI01010001010000000000000515BI0100001174 19.4 cum
64 1.162 R.C.C. grade M 30 BI01010001010000000000000515BI0100001175 120 cum
65 1.163 Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 BI01010001010000000000000515BI0100001176 23.1 MT
66 1.164 Sub Structure BI01010001010000000000000515BI0100001177
67 1.165 Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 BI01010001010000000000000515BI0100001178
68 1.166 For height upto 5 m BI01010001010000000000000515BI0100001179
69 1.167 R.C.C. grade M30 BI01010001010000000000000515BI0100001180 60.2 cum
70 1.168 For height 5 to 10 m BI01010001010000000000000515BI0100001181 45.2 cum
71 1.169 For height above 10 m BI01010001010000000000000515BI0100001182 45.2 cum
72 1.17 Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 BI01010001010000000000000515BI0100001183 27.1 MT
73 1.171 Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 BI01010001010000000000000515BI0100001184 156 Nos.
74 1.172 Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 BI01010001010000000000000515BI0100001185
75 1.173 Granular material BI01010001010000000000000515BI0100001186 397.7 cum
76 1.174 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 BI01010001010000000000000515BI0100001187 51.1 cum
77 1.175 Supplying, fitting and fixing in position true to line and level sliding plate bearing with PTFE surface sliding on stainless steel complete including all accessories as per drawing and Technical Specifications and BS: 5400, section 9.1 & 9.2 (for PTFE) and clause 2004 of MoRTH Specifications. BI01010001010000000000000515BI0100001188 620 tonne capacit
78 1.176 Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) Section IX complete, including all accessories as per drawings and technical specification Clause 1207.1 BI01010001010000000000000515BI0100001189
79 1.177 Super Structure BI01010001010000000000000515BI0100001190
80 1.178 Providing Bailey Bridge Complete Set as per Bailey Bridge Speecification BI01010001010000000000000515BI0100001191 30 Rm
81 1.179 P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 BI01010001010000000000000515BI0100001192
82 1.18 Nominal mix (1:2.5:5) BI01010001010000000000000515BI0100001193 3.8 cum
83 1.181 Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 BI01010001010000000000000515BI0100001194 12.2 cum
84 1.182 Providing and laying of an elastomeric slab seal expansion joint complete as per approved drawing and approved specifications to be installed by manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer’s instructions for installlation and as per technical specifications Clause 1207.2.5 BI01010001010000000000000515BI0100001195 13 Rm
85 1.183 Filler Joint BI01010001010000000000000515BI0100001196
86 1.184 Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per drawing and technical specifications BI01010001010000000000000515BI0100001197 11.6 Rm
87 1.185 River Bank Protection Work BI01010001010000000000000515BI0100001198
88 1.186 Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 BI01010001010000000000000515BI0100001199
89 1.187 For 2 m height of Gabion toe wall for Length of 20 m on both side of abutment wall BI01010001010000000000000515BI0100001200 40 Cum
90 1.188 Loading of stone aggregates BI01010001010000000000000515BI0100001201
91 1.189 M15 grade concrete BI01010001010000000000000515BI0100001202 45.2 Cum
92 1.19 M25 grade concrete BI01010001010000000000000515BI0100001203 11 Cum
93 1.191 M30 grade concrete BI01010001010000000000000515BI0100001204 287 Cum
94 1.192 Bituminous Macadam BI01010001010000000000000515BI0100001205 9.7 Cum
95 1.193 Premix carpet BI01010001010000000000000515BI0100001206 4.6 Cum
96 1.194 Seal coat BI01010001010000000000000515BI0100001207 1 Cum
97 1.195 Unloading of stone aggregates BI01010001010000000000000515BI0100001208
98 1.196 M15 grade concrete BI01010001010000000000000515BI0100001209 45.2 Cum
99 1.197 M25 grade concrete BI01010001010000000000000515BI0100001210 11 Cum
100 1.198 M30 grade concrete BI01010001010000000000000515BI0100001211 287 Cum
101 1.199 Bituminous Macadam BI01010001010000000000000515BI0100001212 9.7 Cum
102 1.2 Premix carpet BI01010001010000000000000515BI0100001213 4.6 Cum
103 1.201 Seal coat BI01010001010000000000000515BI0100001214
104 1.202 Loading of sand BI01010001010000000000000515BI0100001215
105 1.203 M15 grade concrete BI01010001010000000000000515BI0100001216 27.1 Cum
106 1.204 M25 grade concrete BI01010001010000000000000515BI0100001217 5.5 Cum
107 1.205 M30 grade concrete BI01010001010000000000000515BI0100001218 143.5 Cum
108 1.206 Bituminous Macadam BI01010001010000000000000515BI0100001219 2.4 Cum
109 1.207 Seal coat BI01010001010000000000000515BI0100001220 1 Cum
110 1.208 Unloading of sand BI01010001010000000000000515BI0100001221
111 1.209 M15 grade concrete BI01010001010000000000000515BI0100001222 27.1 Cum
112 1.21 M25 grade concrete BI01010001010000000000000515BI0100001223 5.5 Cum
113 1.211 M30 grade concrete BI01010001010000000000000515BI0100001224 143.5 Cum
114 1.212 Bituminous Macadam BI01010001010000000000000515BI0100001225 2.4 Cum
115 1.213 Seal coat BI01010001010000000000000515BI0100001226
116 1.214 Loading of cement and stacking BI01010001010000000000000515BI0100001227
117 1.215 M15 grade concrete BI01010001010000000000000515BI0100001228 15.5 MT
118 1.216 M25 grade concrete BI01010001010000000000000515BI0100001229 4.9 MT
119 1.217 M30 grade concrete BI01010001010000000000000515BI0100001230 137.1 MT
120 1.218 Unloading of cement and stacking BI01010001010000000000000515BI0100001231
121 1.219 M15 grade concrete BI01010001010000000000000515BI0100001232 18.1 MT
122 1.22 M25 grade concrete BI01010001010000000000000515BI0100001233 7.4 MT
123 1.221 M30 grade concrete BI01010001010000000000000515BI0100001234 226.4 MT
124 1.222 Loading steel and stacking BI01010001010000000000000515BI0100001235 59.1 MT
125 1.223 Unloading steel and stacking BI01010001010000000000000515BI0100001236 59.1 MT
126 1.224 Loading Bitumen Drums and stacking BI01010001010000000000000515BI0100001237
127 1.225 Bituminous Macadam BI01010001010000000000000515BI0100001238 0.6 MT
128 1.226 Premix carpet BI01010001010000000000000515BI0100001239 0.2 MT
129 1.227 Seal coat BI01010001010000000000000515BI0100001240 0.1 MT
130 1.228 Unloading Bitumen Drums and stacking BI01010001010000000000000515BI0100001241
131 1.229 Bituminous Macadam BI01010001010000000000000515BI0100001242 0.6 MT
132 1.23 Premix carpet BI01010001010000000000000515BI0100001243 0.2 MT
133 1.231 Seal coat BI01010001010000000000000515BI0100001244 0.1 MT
134 1.232 Cost of Haulage Excluding Loading and Unloading BI01010001010000000000000515BI0100001245
135 1.233 Surfaced Road BI01010001010000000000000515BI0100001246
136 1.234 a) Cement lead distance 125 Km BI01010001010000000000000515BI0100001247 19695.9 T.km
137 1.235 b) Stone Aggregates lead distance 50 Km BI01010001010000000000000515BI0100001248 17048.2 T.km
138 1.236 c) Sand lead distance 650 Km BI01010001010000000000000515BI0100001249 8975.7 T.km
139 1.237 d) Steel lead distance 125 Km BI01010001010000000000000515BI0100001250 7381.5 T.km
140 1.238 e) Bitumen lead distance 125 Km BI01010001010000000000000515BI0100001251 122.3 T.km
141 1.239 Unsurface road BI01010001010000000000000515BI0100001252
142 1.24 a) Cement lead distance 0.0 Km BI01010001010000000000000515BI0100001253
143 1.241 b) Stone Aggregates lead distance 15 Km BI01010001010000000000000515BI0100001254 1464.9 T.km
144 1.242 c) Sand lead distance 15 Km BI01010001010000000000000515BI0100001255 899.2 T.km
145 1.243 d) Steel lead distance 0.0 Km BI01010001010000000000000515BI0100001256
146 1.244 e) Bitumen lead distance 0.0 Km BI01010001010000000000000515BI0100001257
147 1.245 GST 12% on Civil Works BI01010001010000000000000515BI0100001258 1 Percentage
148 1.246 Labour Cess 1% BI01010001010000000000000515BI0100001259 1 Percentage
149 1.247 GST on Steel parts 18% BI01010001010000000000000515BI0100001260 1 Percentage
150 1.248 Labour Cess 1% BI01010001010000000000000515BI0100001261 1 Percentage
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail