South Central Railway has published Guntakal Division- Sw-I: Gy-Wd Section: Proposed Construction Of Road Under Bridge ( Subway ) In Lieu Of Lc No 210 At Km 542 / 5-6 Between Malm-Mtu Stations As 1X6.00X5.00M Rcc Box By Box Pushing Methodsw-Ii: Gy-Wd Section: Proposed Construction Of. Submission Date for this Tender is 11-06-2021. Road Work Tenders in Andhra Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Guntakal Division- SW-I: GY-WD Section: Proposed construction of Road Under Bridge (Subway)in lieu of LC no 210 at km 542/5-6 between MALM-MTU stations as 1x6.00x5.00m RCC Box by Box Pushing method SW-II: GY-WD Section: Proposed construction of Road Under Bridge (Subway)in lieu of LC no 212 at km 546/3-4 between MALM-MTU stations as 2x4.50x5.00m RCC Box by Box Pushing method SW-III: GY-WD Section: Proposed construction of Road Under Bridges (Subway)in lieu of LC No. 223 at km 593/1-2 between KSN-CGTA stations as 1x6.00x5.00m RCC Box by Box Pushing method (Two Packet System). |
2 |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail