| 1 | 1 | Routine maintenance work of 13 Nos. HT and 38 Nos. LT Transformers of 3x210 MW 'A'TPS, Anpara, as per scope of work | BI01010001010000000000000515BI0100001099 | 12 | Per Job. |
|---|
| 2 | 2 | Arresting oil leakage from radiators and associated pipe lines of the transformers. | | 2 | Per Pt. |
|---|
| 3 | 3 | Replacement of HT/LT, Neutral Bushing/ gaskets of HT/LT transformers (Excluding GT):-LT Transformers (Up to 1.6 MVA) | | 2 | Per Ph. |
|---|
| 4 | 4 | Replacement of HT/LT, Neutral Bushing/ gaskets of HT/LT transformers (Excluding GT):-HT/LT side of HT Transformers (16 MVA to 40 MVA). | | 2 | Per Ph. |
|---|
| 5 | 5 | Replacement of HT/LT side turret gasket of LT Transformer for arresting oil leakage. | | 2 | Per Job. |
|---|
| 6 | 6 | Checking of test plugs and CT terminals of HT transformers (All the three phases & neutral). | | 2 | Per Job. |
|---|
| 7 | 7 | Arresting oil leakage from spindle bush of tap changer of GT. | | 2 | Per Job. |
|---|
| 8 | 8 | Arresting oil leakage from top/bottom inspection cover of the transformer or back inspection cover of bushing by even tightening of nuts & bolts and applying M-seal etc. thereafter. | | 2 | Per Job. |
|---|
| 9 | 9 | Disconnection & Re-connection of HT transformer from HV side by opening jumpers & removing carbon deposits and cleaning by CTC. | | 2 | Per Job. |
|---|
| 10 | 10 | Replacement of Expansion Bellows of UAT | | 2 | Per Ph. |
|---|
| 11 | 11 | Cleaning of LT side links of G.T. as per Scope of Work. | | 2 | Per Job. |
|---|
| 12 | 12 | Overhauling of Tap changer as per Scope of work. | | 2 | Per Job. |
|---|
| 13 | 13 | Overhauling of cooling fan of HT transformer | | 2 | Per Job. |
|---|
| 14 | 14 | Replacement of Cooling Fan of HT Transformers. | | 2 | Per Job. |
|---|
| 15 | 15 | Rewinding of damaged motor stators of Cooling Fan. | | 2 | Per Motor |
|---|
| 16 | 16 | Overhauling of circulating pumps :- | | 2 | Per Job. |
|---|
| 17 | 17 | Rewinding of damaged motor stators of circulating pumps. | | 2 | Per Motor |
|---|
| 18 | 18 | Centrifuging of transformer oil of HT/ LT transformer/ Storage tank. | | 8 | Per day |
|---|
| 19 | 19 | Overhauling of marshalling boxes for transformers:-From 1.0 MVA upto 16 MVA. | | 2 | Per Job. |
|---|
| 20 | 20 | Overhauling of marshalling boxes for transformers:-From 40 MVA upto 250 MVA. | | 2 | Per Job. |
|---|
| 21 | 21 | Thorough cleaning of transformers after completion of work during overhauling/ breakdown:-From 1.0 MVA upto 16 MVA. | | 2 | Per Job. |
|---|
| 22 | 22 | Thorough cleaning of transformers after completion of work during overhauling/ breakdown:-From 40 MVA upto 250 MVA. | | 2 | Per Job. |
|---|
| 23 | 23 | Erection & commissioning of LT Transformer (1.0 MVA /1.6MVA, 6.6KV/0.4KV) in place of damaged one. | | 2 | Per Job. |
|---|
| 24 | 24 | De-watering and cleaning of oil pit in transformer yard & CW pump house. | | 2 | Per Pit. |
|---|
| 25 | 25 | Cleaning/Cutting of grass of Transformer Yard including plinth area (Total area of transformer yard = 12561.38 M²). | | 54735 | Per Sq. Mtr. |
|---|
| 26 | 26 | Replacement of phase side Seal Off bushing of IP Bus duct at GT LV side. | | 1 | Per Job |
|---|
| 27 | 27 | Dismantling and Assembly of LV & Neutral Bushing, LV Turret etc. (proper replacement of gaskets /‘O’ rings). | | 1 | Per Job |
|---|
| 28 | 28 | Replacement of Pressure Relief Valve of HT Transformers. | | 1 | Per Job |
|---|
| 29 | 29 | Replacement of Expansion Bellow of GT | | 1 | Per Job |
|---|
| 30 | 30 | Replacement of Cooling Fan with Cooler of GT-1 | | 1 | Per Job |
|---|
| 31 | 31 | Opening and reclosing of LV turret after work of HT transformer | | 3 | Per Job |
|---|
| 32 | 32 | Dismantling and Reinstalation of HT Bushing(Single Phase). | | 1 | Per Job |
|---|