| 1 | 1 | Drum Sheet Walling 1.40m (av.) high on Sal-bullah / Eucalyptus bullah piling 10 cm dia. and 3.25m long driven 1.75m (av.) below G.L. and 75cm centre to centre including fitting fixing 3 nos. of half bullah pieces (from 10 cm dia) and drum(empty bitumen) sheet (approved condition) of height 1.5m , cutting and straightening drum sheet (each joint must have lap length of min.50mm) including cost of necessary nails, bolts, nuts etc. and providing 2 to 3m long half bullah ties of 10cm dia. @ 2.25 m centre to centre fixed with 10 cm dia. bullah posts driven 1.5m below G.L. including cost of all materials and one coat of coal tarring to all bullah etc. complete as per direction. (i) Using Eucalyptus bullah | BI01010001010000000000000515BI0100001113 | 40 | mtr |
|---|
| 2 | 2 | Supplying empty Cement bags in good condition. @ 16 NOS BAG PER MTR | BI01010001010000000000000515BI0100001114 | 640 | no |
|---|
| 3 | 3 | Filling empty Cement bags with dry earth or sand,stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags. | BI01010001010000000000000515BI0100001115 | 640 | no |
|---|
| 4 | 4 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) \n(ii) With carried earth arranged by the contractor within a radius of 3 km. including cost of carried earth. | BI01010001010000000000000515BI0100001116 | 56.25 | cum |
|---|
| 5 | 5 | Box cutting in road embankment in all sorts of soil including spreading the soil properly over the flanks as necessary or on berm to approximate grade and camber and grade as per direction and satisfaction of EIC including uprooting and removing plants, jungles when and where necessary .... depth upto 150 mm. | BI01010001010000000000000515BI0100001117 | 403.2 | sqm |
|---|
| 6 | 6 | Brick soling with picked jhama bricks including jhama preparation of bed as necessary with bricks joints properly filled in and packed with local sand or powdered earth and including necessary cushion of similar materials below the soling and in between layers when more than one layer is used (complete as per direction) New bricks | BI01010001010000000000000515BI0100001118 | 403.2 | cum |
|---|
| 7 | 7 | Hire and labour charges of shuttering work without stagging on both side of concrete layer (properly with 25 mm thick plank with necessary support to maintain the correct allignment of the cc layer as directed.) | BI01010001010000000000000515BI0100001119 | 67.2 | cum |
|---|
| 8 | 8 | Providing & laying cement concrete without reinforcement with (1:2:4)grade concrete, in any part of foundation sub centre super structure or bridge culverts with graded stone chips of specified nominal size including screening, clening of approved stone chips as necessary and laying finishing to camber grade cutting in water with cost & carrage orf all materials and excluding cost of reinforcement (avg. thickness of 75 mm thick wooden shuttering as per decision of engineer in charge. \n | BI01010001010000000000000515BI0100001120 | 60.48 | cum |
|---|
| 9 | 9 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.PWD Building 2015,47 & It 3 | BI01010001010000000000000515BI0100001121 | 403.2 | sqm |
|---|
| 10 | 12 | Name Plate & Photo etc. (three stage photo 2 set) | BI01010001010000000000000515BI0100001124 | 1 | unit |
|---|
| 11 | 13 | ADD GST(Goods and Services taxes) @ 12.00%(50% WB GST& 50% CENTRAL) over the above total [Marked as A] asper the rules of the Govt.of India…. | BI01010001010000000000000515BI0100001125 | 1 | unit |
|---|
| 12 | 14 | ADD for LABOUR WELL FARE CESS @ 1.00% | BI01010001010000000000000515BI0100001126 | 1 | unit |
|---|