Department of Cooperation has published Fabrication And Erection Jobs. Submission Date for this Tender is 25-05-2021. Clothing Accessories Tenders in The Gurdaspur Co-op. Sugar Mills Ltd., Gurdaspur Punjab. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 18-May-2021 | DNIT | Other | 25-05-2021 |
Name of Work: Fabrication & Erection Jobs | |||||
---|---|---|---|---|---|
Sl. No. | Item Description(Annexure A) | Item Code / Make | Quantity | Units | |
1 | 1 | Repair of cane unloader grab arms | t1 | 1 | Per arm |
2 | 2 | Replacement of sq. bar of cane unloader. | t2 | 1 | Per running meter |
3 | 3 | Fabrication & Erection of hydraulic Grab of unloader complete. | t3 | 1 | L.S |
4 | 4 | Dismantling, Fabrication and Erection of a) Mincer Hood | t4 | 1 | L.S each |
5 | 5 | b) Cutter Hood | t5 | 1 | L.S each |
6 | 6 | c) Chopper Hood | t6 | 1 | L.S each |
7 | 7 | Replacement of cane cutting knives of cutters | t7 | 1 | Per knife |
8 | 8 | Replacement of cane cutting knives of Mincer | t8 | 1 | Per knife |
9 | 9 | Replacement of hammers of Mincer | t9 | 1 | Per hammer |
10 | 10 | Replacement of domite tips of Mincer | t10 | 1 | Per tip |
11 | 11 | To build mill top rollers square end as per standard size | t11 | 1 | L S each |
12 | 12 | To build mill rollers crown pinion teeth as per standard template of teeth. | t12 | 1 | L S each |
13 | 13 | To build mill rollers coupling square section as per standard size | t13 | 1 | L S each |
14 | 14 | To build mill rollers journal as per standard size | t14 | 1 | L S each |
15 | 15 | To build mill under feeder rollers drive gear teeth as per standard template of teeth | t15 | 1 | L S each |
16 | 16 | Fabrication and erection of mill rollers crown pinion guard | t16 | 1 | L S each |
17 | 17 | Fabrication and erection of Donnelly chute of mills | t17 | 1 | L.S each |
18 | 18 | Dismantling, Fabrication and erection of worn-out Juice tray at mill house from 10/12 mm plate | t18 | 1 | L.S each |
19 | 19 | Dis. Feb. & erection of Mill house screw conveyor | t19 | 1 | L.S |
20 | 20 | Dis. Feb. & erection of mill house screw conveyor trough along with dismantling and fitting of conveyor and drive system. | t20 | 1 | L.S |
21 | 21 | Dismantling and erection of worn-out runners of cane carrier, RBC, Bagasse Elevator and inter carrier. | t21 | 1 | Per running meter |
22 | 22 | Dismantling, Fabrication and erection of worn-out side plates of cane carrier, RBC, Bagasse Elevator and inter carrier. | t22 | 1 | Per Sq. mtr |
23 | 23 | Dismantling, Fabrication and erection of worn-out trough of RBC, Bagasse Elevator & Rack carriers from a) MS plate 6/8 mm | t23 | 1 | P.M.T. |
24 | 24 | b) SS plate 4/5 mm | t24 | 1 | P.M.T. |
25 | 25 | Dismantling Fabrication and erection structure of cane carrier drive ,RBC chain drive, Rake carrier and elevator chain drive | t25 | 1 | P.M.T. |
26 | 26 | Replacement of worn out bottom boot of intercarrier chain / secondary chain | t26 | 1 | L.S |
27 | 27 | Replacement of angle and channel of cane carrier / RBC / Rack carrier & Elevator . | t27 | 1 | Per running mtr |
28 | 28 | Repair of secondary cane carrier chain and elevator chain rake | t28 | 1 | Per rack |
29 | 29 | Fabrication of secondary cane carrier chain and elevator chain rake | t29 | 1 | Per rack |
30 | 30 | Fabrication of RBC slates | t30 | 1 | Per slate |
31 | 31 | Repair of RBC slates | t31 | 1 | Per slate |
32 | 32 | Dis. And erection of bagassecillow blower | t32 | 1 | L.S |
33 | 33 | Fabrication of bagassecillow blower | t33 | 1 | L.S |
34 | 34 | Dismantling and Erection of boiler bagasse feeding CI furnace mouth piece of WIL make Boiler. | t34 | 1 | Per piece |
35 | 35 | Dismantling and Erection of boiler bagasse feeding CI furnace chute | t35 | 1 | Per piece |
36 | 36 | Replacement of furnace door frame of WIL make Boiler & Texmaco make boiler | t36 | 1 | Per piece |
37 | 37 | Replacement of furnace door of WIL make Boiler & Texmaco make boiler | t37 | 1 | Per piece |
38 | 38 | Repair and fitting of furnace door frame of WIL make boiler& Texmaco make boiler | t38 | 1 | Per piece |
39 | 39 | Repair and fitting of furnace door of WIL make boiler& Texmaco make boiler | t39 | 1 | Per piece |
40 | 40 | Replacement of furnace chamber door frame of WIL make Boiler & Texmaco make boiler | t40 | 1 | Per piece |
41 | 41 | Replacement of furnace chamber door of WIL make Boiler & Texmaco make boiler | t41 | 1 | Per piece |
42 | 42 | Repair and fitting of furnace chamber door of WIL make boiler& Texmaco make boiler | t42 | 1 | Per piece |
43 | 43 | Repair and fitting of furnace chamber door frame of WIL make boiler& Texmaco make boiler | t43 | 1 | Per piece |
44 | 44 | Dismatling of Boiler Dampers | t44 | 1 | L.S each |
45 | 45 | Dismatling of Boiler Dampers | t45 | 1 | L.S each |
46 | 46 | Dismatling of Boiler Dampers | t46 | 1 | L.S each |
47 | 47 | Dismatling of Boiler Dampers | t47 | 1 | L.S each |
48 | 48 | Repair of ID fan of WIL and Texmaco make boiler | t48 | 1 | L.S each |
49 | 49 | Repair of FD fan of WIL and Texmaco make boiler | t49 | 1 | L.S each |
50 | 50 | Dismantling, Fabrication and Erection of boiler bagasse feeding MS chute between boiler furnance and RBC chain | t50 | 1 | P.M.T. |
51 | 51 | Patch work | t51 | 1 | Per Sq ft. |
52 | 52 | Dis, feb, & errection of boiler flue gas ducting between FD fan, ID fan& chimney. | t52 | 1 | P.M.T. |
53 | 53 | Dismantling, Fabrication & Erection of bend of boiler flue gas ducting between ID FAN and chimney from 6/8mm thick plate. | t53 | 1 | P.M.T. |
54 | 54 | Dismantling, Fabrication & Erection of Side plate & Top plates(4mm) of boilers. | t54 | 1 | P. Sq mtr |
55 | 55 | Dismantling, Fabrication & Erection Economiser top & side plates | t55 | 1 | Per Sq mtr |
56 | 56 | Dismantling, Fabrication & Erection Air heater top & side plates | t56 | 1 | Per Sq mtr |
57 | 57 | Dismantling and fitting of GI/ACC sheet. a) Dismantling | t57 | 1 | Per sheet |
58 | 58 | b) Fitting | t58 | 1 | Per sheet |
59 | 59 | Dismantling of machinery structure. | t59 | 1 | P.M.T. |
60 | 60 | Fabrication and Erection of machinery structure. | t60 | 1 | P.M.T. |
61 | 61 | Dismantling & erection of FD Fan Casing | t61 | 1 | L.S |
62 | 62 | Fabrication of FD Fan Casing | t62 | 1 | L.S |
63 | 63 | Repair of FD Fan Casing | t63 | 1 | L.S |
64 | 64 | Dismantling & erection of ID Fan Casing | t64 | 1 | L.S |
65 | 65 | Fabrication of ID Fan Casing | t65 | 1 | L.S |
66 | 66 | Repair of ID Fan Casing | t66 | 1 | L.S |
67 | 67 | Dismantling, Fabrication & Erection (a) pump and motor bed | t67 | 1 | L.S |
68 | 68 | b) Motor and radicon | t68 | 1 | L.S |
69 | 69 | c) Cutter motor bed | t69 | 1 | L.S |
70 | 70 | Dismantling fabrication and erection of wet scrubber cone | t70 | 1 | L.S each |
71 | 71 | Dismantling fabrication and erection of wet scrubber side plates | t71 | 1 | P.M.T |
72 | 72 | Dismantling fabrication and erection of clarifier cone of Boiler | t72 | 1 | L.S each |
73 | 73 | Dismantling fabrication and erection of man hole | t73 | 1 | L.S each |
74 | 74 | Dismantling fabrication and erection of man hole blind | t74 | 1 | L.S each |
75 | 75 | Fabrications mill roller bearing cover | t75 | 1 | Per piece |
76 | 76 | Dismantling of Structure | t76 | 1 | PMT |
77 | 77 | Fabrication of Structure | t77 | 1 | PMT |
78 | 78 | Erection of Structure | t78 | 1 | PMT |
79 | 79 | Disnatling of Platforms plates | t79 | 1 | PMT |
80 | 80 | Fabrication Platforms plates | t80 | 1 | PMT |
81 | 81 | Erection of Platforms plates | t81 | 1 | PMT |
82 | 82 | Dismantling of Railing | t82 | 1 | R.F.T. |
83 | 83 | Fabrication & erection of railing | t83 | 1 | R.F.T. |
84 | 84 | A) Dismantling, loading & shifting of following material From Zira sugar mill 1.Mill Reversing Redicon with Motor - 01 set | t84 | 1 | L.S |
85 | 85 | 2.Mill Reversing Redicon with Motor - 01 set | t85 | 1 | L.S |
86 | 86 | 3. Gun metal Liner - 10 nos | t86 | 1 | L.S |
87 | 87 | 4.IBR valves ( Different sizes) - 20 nos. | t87 | 1 | L.S each |
88 | 88 | 5. Batch type centrifugal machine ( 1 ton ) with motor, structure and panel - 02 set | t88 | 1 | L.S each |
89 | 89 | 6. Head and tail shaft with Plummer block and sprocket a) Cane carrier - 01 set | t89 | 1 | L.S |
90 | 90 | b) Secondary carrier - 01 set | t90 | 1 | L.S |
91 | 91 | c) Bagasse elevator - 01 set | t91 | 1 | L.S |
92 | 92 | d) RBC - 01 set | t92 | 1 | L.S |
93 | 93 | 7. M.S Structure ( angle, Channel, beam) - 10 Tons | t93 | 1 | P.M.T |
94 | 94 | 8. Seamless pipe ( different sizes) - 150 mtrs | t94 | 1 | P.M.T |
95 | 95 | 9. Exhaust/ vapour pipe line ( different sizes) - 100 mtrs | t95 | 1 | P.M.T |
96 | 96 | 10. Cane carrier, RBC Runner with channel - 250 mtrs | t96 | 1 | P.M.T |
97 | 97 | 11. Chequered plate - 04 tons | t97 | 1 | P.M.T |
98 | 98 | 12. Bagacillo blower with motor - 01 no. | t98 | 1 | L.S |
99 | 99 | 13.Alternator ( 2.5 MW) radiator - 03 nos. | t99 | 1 | L.S each |
100 | 100 | 14.Turbine Cooler 1.5 MW - 02 nos. | t100 | 1 | L.S each |
101 | 101 | 15.Mill turbine cooler - 01 no. | t101 | 1 | L.S each |
102 | 102 | 16.Bagasse feeder with radicon and motor - 03 sets | t102 | 1 | L.S each |
103 | 103 | B) Loading & shifting of following material From Zira sugar mill a) Air circuit breaker 600A/800A - 03 nos. | t103 | 1 | L.S |
104 | 104 | b) Submersible pump with motor - 02 nos | t104 | 1 | L.S |
105 | 105 | c) Feed pump 65/6 - 01 no. | t105 | 1 | L.S |
106 | 106 | d) Welding set - 03 nos. | t106 | 1 | L.S |
107 | 107 | e) Vacuum pump - 01 no. | t107 | 1 | L.S |
108 | 108 | f) MCCB 60A/800 AMP - 02 nos. | t108 | 1 | L.S |
109 | 109 | g) HRC fuse of different sizes - 100 nos. | t109 | 1 | L.S |
110 | 110 | h) Motors a. 15 HP 1440 RPM - 02 nos. | t110 | 1 | L.S |
111 | 111 | b. 20 HP 960 RPM - 02 nos. | t111 | 1 | L.S |
112 | 112 | c. 20 HP 1440 RPM - 02 nos. | t112 | 1 | L.S |
113 | 113 | d. 50 HP 960 RPM - 01 no. | t113 | 1 | L.S |
114 | 114 | C) Dismantling, loading & shifting of following material From Bhougpur Sugar Mill 1. Centrifugal machine with motor structure & panel – 01 set | t114 | 1 | L.S |
115 | 115 | 2. Condenser - 03 nos. | t115 | 1 | L.S each |
116 | 116 | 3. Megma pump & vacumm pump – 02 nos | t116 | 1 | L.S each |
117 | 117 | 4. Continuous machine with motor, panel and structure -02 nos. | t117 | 1 | L.s each |
118 | 118 | POWER HOUSE 1.Fabrication & erection of cable tray | t118 | 1 | R mtr |
119 | 119 | 2.Replacement of Thimble (Any Size) | t119 | 1 | L.S each |
120 | 120 | 3.Checking of cable connections, cleaning of thimbles and reconnection | t120 | 1 | L.S each connection |
121 | 121 | 4.Replacement of switches/MCCB 630 AMP/400AMP/250 AMP | t121 | 1 | L.S each |
122 | 122 | 5.Replacement/erection of changeover switch 630AMP/400AMP/250 AMP | t122 | 1 | L.S each |
123 | 123 | 6) Overhauling of Spare Electrical motors a) 0-50 HP | t123 | 1 | Per motor |
124 | 124 | b) Above 50 Hp | t124 | 1 | Per motor |
125 | 125 | c) Three speed motors | t125 | 1 | Per motor |
126 | 126 | d) 150 HP motor - 01 no. | t126 | 1 | L S each |
127 | 127 | e) unloader motor 15 HP - 02 nos. | t127 | 1 | L S each |
128 | 128 | f) Four speed motor - 04 nos. | t128 | 1 | L.S each |
129 | 129 | 7. Laying & connection of power & control cables from main panels to remote box and motor - 03 no. jobs | t129 | 1 | L.S each |
130 | 130 | 8.Dismantling of existing three speed electrical panel | t130 | 1 | L.s Each |
131 | 131 | 9.Erection of New four speed panel | t131 | 1 | L.s Each |
132 | 132 | a. Extension juice tray of mill no. 1 | t132 | 1 | L.S each |
133 | 133 | b. Extension juice tray of mill no. 2 | t133 | 1 | L.S each |
134 | 134 | Fabrication and erection of MS stairs with railing | t134 | 1 | Per Sq mtr |
135 | 135 | Fabrication & Fitting of stationary knives structure with knives | t135 | 1 | One job |
136 | 136 | Mill pinion guard (bottom ) | t136 | 1 | L.S Each |
137 | 137 | Open gear guard (bottom) of all chain | t137 | 1 | L.S Each |
138 | 138 | Fabrication of motor protection cover | t138 | 1 | Per piece |
139 | 139 | Fabrication of shed (any size) with structure | t139 | 1 | Per sq mtr |
140 | 140 | Repair of DSM screen | t140 | 1 | Lump sum each |
141 | 141 | Dismantling and refitting of mill no. 1 head stock after repair of foundation and supporting of base plate ( civil work done by mill | t141 | 1 | One job |
142 | 142 | RCC drilling between mill no - 1 & 2 | t142 | 1 | Each drill hole |
143 | 143 | Fabrication and erection of MS box additional supporting between mill no – 1 head stock with mill no -2 head stock | t143 | 1 | One job |
144 | 144 | Repair of FMG oil tank leakage | t144 | 1 | L.S |
145 | 145 | Dismantling of M.S. Round/Square Tanks | t145 | 1 | P.M.T. |
146 | 146 | Fabrication of M.S. Round Square Tanks | t146 | 1 | P.M.T. |
147 | 147 | Erection of M S Round /square Tanks | t147 | 1 | P.M.T. |
148 | 148 | Dismantling of M.S./G.I./ C.I./ SS / RMP pipe from 1” to 12” dia | t148 | 1 | Per Mtr per inch dia |
149 | 149 | Erect ion of MS/GI/CI/SS/ RMP pipe 1” to 12” dia | t149 | 1 | Per Mtr per inch dia |
150 | 150 | Fabrication of M S / SS pipe line above 12” dia from M.S. / SS plate | t150 | 1 | P.M.T. |
151 | 151 | Dismantling of M.S. / SS/C.I. pipe line above 12” dia | t151 | 1 | P.M.T. |
152 | 152 | Erection of M.S./ C.I pipe line above 12” dia | t152 | 1 | P.M.T. |
153 | 153 | a) Dismantling of Nipple 1” to 12” dia up to 24” length | t153 | 1 | Per inch dia |
154 | 154 | b) Fabrication of Nipple 1” to 12” Ø & up to 24” length | t154 | 1 | Per inch dia |
155 | 155 | c) Erection of Nipple 1” to 12”dia & up to 24” length | t155 | 1 | Per inch dia |
156 | 156 | a) Dismantling of Nipple above 12” dia up to 1 mtr. length | t156 | 1 | Per inch dia |
157 | 157 | b) Fabrication of Nipple above 12” dia up to 1 mtr. length | t157 | 1 | Per inch dia |
158 | 158 | c) Erection of Nipple above 12” dia up to 1 mtr. length | t158 | 1 | Per inch dia |
159 | 159 | a) Dismantling of bend 1” to 12” dia | t159 | 1 | Per inch dia |
160 | 160 | b) Fabrication of Bend 1” to 12” dia | t160 | 1 | Per inch dia |
161 | 161 | c) Erection of bend 1” to 12” dia | t161 | 1 | Per inch dia |
162 | 162 | Dismantling ,fabrication & erection of Bend above 12” below 36” dia | t162 | 1 | Per inch dia |
163 | 163 | Dismantling of Reducer/Tee 1” to 12” dia & up to 24” length | t163 | 1 | Per inch dia |
164 | 164 | a) Dismantling of Blind 1” to 12” dia | t164 | 1 | Per inch dia |
165 | 165 | b) Fabrication of blind 1” to 12” dia | t165 | 1 | Per inch dia |
166 | 166 | c) Erection of blind 1” to 12” dia | t166 | 1 | Per inch dia |
167 | 167 | a) Dismantling of above12” dia | t167 | 1 | Per inch dia |
168 | 168 | b) Fabrication of blind above 12”dia | t168 | 1 | Per inch dia |
169 | 169 | c) Erection of blind above 12” dia | t169 | 1 | Per inch dia |
170 | 170 | a) Dismantling of valve 1” to 12” dia | t170 | 1 | Per inch dia |
171 | 171 | b) Erection of valves 1” to 12” dia | t171 | 1 | Per inch dia |
172 | 172 | c) Dismantling of valve above 12” dia | t172 | 1 | Per inch dia |
173 | 173 | d) Erection of valves above 12” dia | t173 | 1 | Per inch dia |
174 | 174 | a)Dismantling of flange 1” to 12” dia | t174 | 1 | Per inch dia |
175 | 175 | b) Fabrication of flange 1” to 12” dia | t175 | 1 | Per inch dia |
176 | 176 | c) erection of valve above 12” dia | t176 | 1 | Per inch dia |
177 | 177 | Dismantling, Fabrication & fitting of Jet Box in M.S. Material | t177 | 1 | Lump sum |
178 | 178 | Dismantling, Fabrication, fitting of Jet Box in S S Material | t178 | 1 | Lump sum |
179 | 179 | Dismantling, Fabrication & fitting of Nipples 8” to 10” dia for Jet Box of Condenser | t179 | 1 | Lump sum |
180 | 180 | a) Fabrication of Vapour pipe bend 36” to 40” dia | t180 | 1 | Lump sum |
181 | 181 | b) Dismantling & erection of vapour pipe bend 36” to 40” dia | t181 | 1 | Lump sum |
182 | 182 | Erection of M S Round /square Tanks | t182 | 1 | P.M.T. |
183 | 183 | Dismantling and erection of existing syrup/ molasses/ magma pipe lines for their internal/external cleaning. | t183 | 1 | Per Mtr per inch dia |
184 | 184 | a) Dismantling of Vapour pipe 900 mm/ 1000 mm dia | t184 | 1 | P.M.T. |
185 | 185 | b) Fabrication of vapour pipe 900/1000 mm dia | t185 | 1 | P.M.T. |
186 | 186 | c) Erection of Vapour pipe 900/1000 mm dia | t186 | 1 | P.M.T. |
187 | 187 | Dismantling, Fabrication & erection of Save all from 10 mm to 12mm plate a) Pan | t187 | 1 | Lump sum each |
188 | 188 | b) Quad & Vapour cell | t188 | 1 | Lump sum each |
189 | 189 | Dismantling, fabrication & erection of save all from 8mm to 10mm MS plate excluding outer shell | t189 | 1 | Lump sum each |
190 | 190 | Replacement of J-pipe in vapour cell/ quad body/ pan | t190 | 1 | Lump sum each |
191 | 191 | Dismantling, Fabrication & erection of Umbrella a) Pan | t191 | 1 | Lump sum each |
192 | 192 | b) Quad & Vapour cell | t192 | 1 | Lump sum each |
193 | 193 | Dismantling, fabrication & erection of bottom and top cone a) Pan | t193 | 1 | Lump sum each |
194 | 194 | b) Quad & Vapour cell | t194 | 1 | Lump sum each |
195 | 195 | c) Juice sulphiter / syrup sulphiter and cone of any other units above 12” dia | t195 | 1 | Per inch dia |
196 | 196 | Dismantling of inter connecting square box for juice heater Double beat valve and Fabrication, Erection with pipe(modify) | t196 | 1 | Lump sum each |
197 | 197 | a) Replacement of cooling jacket for the sulphur burning chamber. | t197 | 1 | Lump sum each |
198 | 198 | b) Replacement of sulphur furnace cooling scrubber complete with internal 8” cooling jacket, 6” gas pipe and 4” cooling pipe | t198 | 1 | Lump sum each |
199 | 199 | c) dismantling, fabrication & erection of cooler made from 8” dia pipe for sulphur furnace | t199 | 1 | Lump sum each |
200 | 200 | Dismantling, Fabrication & erection of Sulphur burning chamber of Sulphur Furnace | t200 | 1 | Lump sum |
201 | 201 | Dismantling, fabrication & erection of Sulphur melt Tank | t201 | 1 | Lump sum |
202 | 202 | Dismantling, fabrication & erection of coil for Sulphur melter | t202 | 1 | Lump sum |
203 | 203 | 1. Lime hopper: Fabrication & Erection along with connecting valves &pipes with its drive system etc. | t203 | 1 | Lump sum |
204 | 204 | 2. Lifting of Lime Slacker along with connecting parts up to 2 ft. Height suitable for fitting Lime Hopper. | t204 | 1 | Lump sum each |
205 | 205 | Dismantling, Fabrication & erection of condenser of vacuum filter | t205 | 1 | Lump sum each |
206 | 206 | Dismantling, Fabrication & erection of Vacuum filter a) Mud Trough | t206 | 1 | Lump sum each |
207 | 207 | b) Abgitator | t207 | 1 | Lump sum each |
208 | 208 | Replacement of vacuum filter drum complete including connected accessories a) Dismantling of existing RVF Drum and to be shifted at scrap yard. | t208 | 1 | Lump sum |
209 | 209 | b) New RVF drum to be erected at position including connected accessories etc. | t209 | 1 | Lump sum |
210 | 210 | 1) Dismantling, Fabrication & erection of Mud Scroll / screw conveyor | t210 | 1 | Lump sum each |
211 | 211 | 2) Dismantling, Fabrication & erection of Mud Mixture | t211 | 1 | Lump sum each |
212 | 212 | Dismantling, Fabrication & erection of Bagacillo cyclone | t212 | 1 | Lump sum each |
213 | 213 | Dismantling of Angle valves /Straight valve a) Size 450 mm to 700 mm | t213 | 1 | Lump sum each |
214 | 214 | Size 700 mm to 1000 mm | t214 | 1 | Lump sum each |
215 | 215 | Erection of Angle valves /Straight valve a) Size 450 mm to 700 mm | t215 | 1 | Lump sum each |
216 | 216 | Size 700 mm to 1000 mm | t216 | 1 | Lump sum each |
217 | 217 | Patch work at Boiling House and C/F House etc. | t217 | 1 | Per Sq. Ft. |
218 | 218 | Fabrication & erection of Mud Boots for Dorr | t218 | 1 | Per Mud Boot |
219 | 219 | a. Replacement of clarifier center tube | t219 | 1 | Lump sum |
220 | 220 | b. Replacement of MS Scrapper arms of clarifier center tubes. | t220 | 1 | Lump sum per arm |
221 | 221 | c. Replacement of clarifier juice distribution plates | t221 | 1 | Lump each |
222 | 222 | a) Replacement of Clarifier Bottom plate(compartment) | t222 | 1 | Lump sum |
223 | 223 | b) Dismantling, Fabrication & erection of Clarifier | t223 | 1 | PMT |
224 | 224 | Coils in Dorr/Melter/Centrifugal machines/Steam coils etc: a) Dismantling | t224 | 1 | PID/mtr |
225 | 225 | b) Fabrication | t225 | 1 | PID/mtr |
226 | 226 | c) Erection | t226 | 1 | PID/mtr |
227 | 227 | Dismantling, Fabrication and erection of semi Kestner bottom nipple 24” dia | t227 | 1 | Lump Sum |
228 | 228 | Replacement of Quad / Vapour Cell down take | t228 | 1 | Lump Sum |
229 | 229 | Replacement of Pan down take | t229 | 1 | Lump sum |
230 | 230 | Patch work of worn our portion of pan / evaporator body shell | t230 | 1 | Per sq.ft |
231 | 231 | Patch work of Save all of pan / evaporator bodies | t231 | 1 | Per sq. ft |
232 | 232 | Patch work of Umbrella of pan/ evaporator bodies | t232 | 1 | Per sq. ft |
233 | 233 | a) Strengthing of shell with coil type channel with cross by pipe/ channel at two places of pan | t233 | 1 | Lump. Sum/pan |
234 | 234 | b) Strengthing of Umbrella of pan / evaporator bodies | t234 | 1 | Lump. Sum |
235 | 235 | Dismantling, Fabrication & Erection of body shell a) Juice Sulphitor | t235 | 1 | P.M.T |
236 | 236 | b) Evaporator bodies | t236 | 1 | PMT |
237 | 237 | c) Pans | t237 | 1 | PMT |
238 | 238 | Dismantling, Fabrication & Erection of Bottom/Top Taper portion of a) Pans | t238 | 1 | PMT |
239 | 239 | b) Evaporator bodies | t239 | 1 | PMT |
240 | 240 | Dismantling of SS tubes of a) Pans | t240 | 1 | Per tube |
241 | 241 | b) Evaporator bodies | t241 | 1 | Per tube |
242 | 242 | c) Juice heater | t242 | 1 | Per tube |
243 | 243 | Fitting of SS Tubes and to be tested at 80 PSI Hyd. Pressure a) Pans | t243 | 1 | Per tube |
244 | 244 | b) Evaporator bodies | t244 | 1 | Per tube |
245 | 245 | c) Juice heater | t245 | 1 | Per tube |
246 | 246 | a) Dismantling of S.S tube of semi kestner | t246 | 1 | Per tube |
247 | 247 | b) Fitting of S.S Tubes of semi kestner and to be tested 80 PSI Hyd. Pressure | t247 | 1 | Per tube |
248 | 248 | Dismantling, fabrication and erection of shaft with arms of Dry seed crystallizer / vacuum crystallizer. | t248 | 1 | Lump sum |
249 | 249 | Dismantling, fabrication and erection of agitator arms of juice sulphitor/dry seed crystallizer / vacuum crystallizer. | t249 | 1 | Lump sum |
250 | 250 | Replacement of ribbon type stirrer of air cooled crystallizer. | t250 | 1 | Lump sum each/PRM |
251 | 251 | Crystallizer central shaft with Ribbon: a) Dismantling | t251 | 1 | Per Pcs |
252 | 252 | b) Fabrication | t252 | 1 | Per Pcs |
253 | 253 | c) Erection | t253 | 1 | Per Pcs |
254 | 254 | Dismantling, fabrication and erection of condensate bottle big size(from 1.5mtr to 2.0mtr) | t254 | 1 | L.S/Bottle |
255 | 255 | Dismantling, fabrication and erection of condensate bottle big size(from 1.0mtr to 1.5mtr) | t255 | 1 | L.S/Bottle |
256 | 256 | Dismantling, fabrication and erection of segment of pan shell | t256 | 1 | PMT |
257 | 257 | Dismantling, Fabrication and erection of complete pan shell including sight glass, Man hole, provision of key sample, vacuum gauge, ammonia pipes ,glass washing pipe, cold water line connections and other accessories connected to body shell, Umbrella including welding of M.S. angles for supports etc., top taper cone including connections of washing steam pipes etc., save all including J-pipes etc, vapour pipe outlet nipple of save all, Feed pipe connections etc. | t257 | 1 | Lump sum |
258 | 258 | Vacuum crystallizer / Dry seed crystallizer (i) Dismantling, fabrication & erection of complete shell ( including side plates ) along with dismantling, erection & alignment of complete drive system | t258 | 1 | Lump sum |
259 | 259 | Dismantling, fabrication & erection of complete shell ( excluding vertical side plates ) | t259 | 1 | PMT |
260 | 260 | Worm and worm wheel, Gland housing of Crystallizers: a)Dismantling and erection of existing worm and worm wheel, gear box, motor and alignment work of worm and worm wheel, gear box and motor for satisfactory trial. | t260 | 1 | Lump sum |
261 | 261 | b) Dismantling and erection of gland housing of crystallizer shaft. | t261 | 1 | Lump sum |
262 | 262 | S.S Bend/TEE/reducer/Nipple/cross a) Dismantling | t262 | 1 | PID/pcs |
263 | 263 | b) Fabrication | t263 | 1 | PID/pcs |
264 | 264 | c) Erection | t264 | 1 | PID/pcs |
265 | 265 | Dismantling, Fabrication & erection of Manhole with neck flange cover 16” to 24” dia | t265 | 1 | Per inch dia |
266 | 266 | Cutting & strengthening of old material | t266 | 1 | P.M.T |
267 | 267 | Dismantling, Fabrication & erection of worn out feeding Header of pans | t267 | 1 | Lump sum each |
268 | 268 | Dismantling, fabrication & erection of central tube with cooling coil (shaft) for water cooled crystallizer-40 tons | t268 | 1 | L/S / cryst. |
269 | 269 | a) Dismantling, Fabrication & erection of cooling pipe coil in the crystallizer made from 4” dia pipe | t269 | 1 | Lump sum each piece |
270 | 270 | b) Patch work of crystallizer cooling shaft | t270 | 1 | Per Sq. ft. |
271 | 271 | Coils Fabrication of coil | t271 | 1 | Per Inch dia/Rft. |
272 | 272 | Dismantling & erection of coils | t272 | 1 | Per inch dia/ Rft |
273 | 273 | Dismantling of existing condenser including their venture, tail pipe, bend etc. and thereafter installation of efficient single entry new condensers including fabrication / erection of venture, tail pipe & bends etc. Fabrication and erection of base frame and other associated fabrication & erection jobs. | t273 | 1 | Lump sum for each condenser |
274 | 274 | Dismantling, Fabrication & erection of M.S. Gutters. | t274 | 1 | P.M.T. |
275 | 275 | Replacement of C.I. Cone (venture)of Multijet condenser | t275 | 1 | Lump sum each |
276 | 276 | Dismantling C/F Machine including water, steam connection and discharge chute | t276 | 1 | Lump. Sum |
277 | 277 | Dismantling of continuous C/F Machine | t277 | 1 | Lump. Sum each |
278 | 278 | Erection of continuous C/F Machine with structure complete in all respect | t278 | 1 | Lump. Sum each |
279 | 279 | Dismantling of Batch type C/F Machine | t279 | 1 | Lump. Sum each |
280 | 280 | 2. Erection of batch type C/F Machine (750 kg/01 ton) along with its accessories and structure complete in all respect. | t280 | 1 | Lump. Sum each |
281 | 281 | 3. Overhauling / repair of Batch type centrifugal machine (1Ton)-02 nos. ( Spares will be provided by mill ) | t281 | 1 | L.S each |
282 | 282 | 4. Shifting and adjustment of pug mill with structure,gearbox and motor. | t282 | 1 | L.S each |
283 | 283 | 5.Fabrication,installation of Masc.chut with two 10’’/12’’ butterfly valves -03 nos. | t283 | 1 | L.S each |
284 | 284 | 6. Fabrication,installation of A heavy/A light molasses separator with 2 nos. butterfly valves 6’’ | t284 | 1 | L.S each |
285 | 285 | 7.Fabrication and erection of bottom chute | t285 | 1 | L.S each |
286 | 286 | Dismantling of old Transient Heater & erection of new Transient Heater along with its accessories. | t286 | 1 | Lump sum for each heater |
287 | 287 | Erection C/F Machine including water, steam connection and discharge chute including modification of staging / structure | t287 | 1 | Lump Sum |
288 | 288 | Dismantling and erection of sugar grader of side plate including modification of structure. | t288 | 1 | Lump. Sum |
289 | 289 | Dismantling, fabrication and erection of circular bottom portion of magma mixer. | t289 | 1 | Lump sum per mtr. |
290 | 290 | Fabrication and erection of complete casing having outer dia for circular portion 32” approx as existing exhaust blower of batch type centrifugal machines. | t290 | 1 | Lump sum each |
291 | 291 | Hoppers a) Dismantling, fabrication & erection of Deck piece & alignments of Hopper | t291 | 1 | Lump sum each |
292 | 292 | a) Dismantling, fabrication & erection of Hopper piece from Deck piece to end of Hopper | t292 | 1 | Lump sum per Mtr. |
293 | 293 | b) Dismantling, Fabrication & erection of Hopper piece from Deck piece to start of Hopper including Multi trays. | t293 | 1 | Lump sum per Mtr |
294 | 294 | Dismantling, Fabrication & erection of Hopper complete with deck piece and multi tray for hot/cold air blower. | t294 | 1 | Lump sum |
295 | 295 | Magma Mixer a) Dismantling of magma mixer including shaft / arms / drive etc. | t295 | 1 | Lump sum |
296 | 296 | b) Fabrication of magma mixer including shaft / arms / drive etc. | t296 | 1 | Lump sum |
297 | 297 | c) Erection of magma mixer including shaft / arms / drive etc. | t297 | 1 | Lump sum |
298 | 298 | Dismantling’ fabrication & erection of molasses gutter for centrifugal machines | t298 | 1 | Lump sum per running feet |
299 | 299 | Dismantling and erection of existing syrup/ molasses/ magma pipe lines for their internal/external cleaning. | t299 | 1 | Per Mtr per inch dia |
300 | 300 | Fabrication of bucket for Sugar Elevator / Dry Seed Elevator | t300 | 1 | Lump sum per bucket |
301 | 301 | For spray Pond a) Fabrication of SS pipe line up to 12” dia from 4 mm thick Ss plate | t301 | 1 | Per mtr per inch dia |
302 | 302 | a) Fabrication of SS cluster for fitting 2” sized pipes with nozzles ( as fitted in existing clusters) . | t302 | 1 | Per piece |
303 | 303 | Threading in 2” dia SS pipe line for fitting nozzles | t303 | 1 | Per piece |
304 | 304 | Formation of purlin and structure at the height of 20 mtrs approx. With angle size 75x75x6mm and channel size 100x50x5 mm and 200x76x7.5 mm for the fitting of Rooftop sheets | t304 | 1 | Per tons |
305 | 305 | Aluminum panel for electrical cabin | t305 | 1 | Per sq. ft |
306 | 306 | Part-B Cutting and welding of Boiler tubes for cleaning | t306 | 1 | per tube |
307 | 307 | Cutting and welding of header caps for cleaning of boiler tubes | t307 | 1 | Per cap |
308 | 308 | Seamless pipe ½’’to 8’’OD & above(various lengths) a) Dismantling | t308 | 1 | Per inch dia per meter |
309 | 309 | b) Fabrication | t309 | 1 | Per inch dia per meter |
310 | 310 | c) Erection | t310 | 1 | Per inch dia per meter |
311 | 311 | Seamless pipe nipple up to 8’’OD & above a) Dismantling | t311 | 1 | Per inch dia per piece |
312 | 312 | b) Fabrication | t312 | 1 | Per inch dia per piece |
313 | 313 | c) Erection | t313 | 1 | Per inch dia per piece |
314 | 314 | Seamless pipe bends up to 8’’OD & above a) Dismantling | t314 | 1 | Per inch dia per piece |
315 | 315 | b) Fabrication | t315 | 1 | Per inch dia per piece |
316 | 316 | c) Erection | t316 | 1 | Per inch dia per piece |
317 | 317 | Dismantling, and erection of air heater tubes 63.5 mm OD x 18 feet length | t317 | 1 | Per tube. |
318 | 318 | Cutting,welding and fitting of air heater old tubes | t318 | 1 | Per tube |
319 | 319 | Dismantling ,fabrication and erection of Air heater centre tube plate | t319 | 1 | Per tube plate |
320 | 320 | IBR valve up to 36’’OD a) Dismantling | t320 | 1 | Per inch dia per piece |
321 | 321 | b) Erection | t321 | 1 | Per inch dia per piece |
322 | 322 | IBR flange a) Dismantling | t322 | 1 | Per inch dia per piece |
323 | 323 | b) Fabrication | t323 | 1 | Per inch dia per piece |
324 | 324 | c) Erection | t324 | 1 | Per inch dia per piece |
325 | 325 | IBR Tee a) Dismantling | t325 | 1 | Per inch dia per piece |
326 | 326 | b) Fabrication | t326 | 1 | Per inch dia per piece |
327 | 327 | c) Erection | t327 | 1 | Per inch dia per piece |
328 | 328 | Reducer a) Dismantling | t328 | 1 | Per inch dia per piece |
329 | 329 | b) Fabrication | t329 | 1 | Per inch dia per piece |
330 | 330 | c) Erection | t330 | 1 | Per inch dia per piece |
331 | 331 | Boiler drum partition plates a) Dismantling | t331 | 1 | Per piece |
332 | 332 | b) Fabrication | t332 | 1 | Per piece |
333 | 333 | c) Erection | t333 | 1 | Per piece |
334 | 334 | d) repair | t334 | 1 | Per piece |
335 | 335 | Boiler drum water seprator a) Dismantling | t335 | 1 | Per piece |
336 | 336 | b) Fabrication | t336 | 1 | Per piece |
337 | 337 | c) Erection | t337 | 1 | Per piece |
338 | 338 | d) repair | t338 | 1 | Per piece |
339 | 339 | Boiler wet scrubber seive plate as per drawing a) Dismantling | t339 | 1 | L.S Each |
340 | 340 | b) Fabrication | t340 | 1 | L.S Each |
341 | 341 | c) Drilliing | t341 | 1 | L.S Each |
342 | 342 | d) Erection | t342 | 1 | L.S Each |
343 | 343 | IBR welding joint | t343 | 1 | Per inch dia |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail