}

Fabrication Jobs Major And General Jobs, NAKODAR-Punjab

Department of Cooperation has published Fabrication Jobs Major And General Jobs. Submission Date for this Tender is 27-05-2021. Fabrication Work Tenders in NAKODAR Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

27908773
Fabrication Jobs Major And General Jobs
Open Tender
Indian
Punjab
NAKODAR
27-05-2021

Tender Details

Fabrication Jobs Major And General Jobs

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of the Work: Fabrication Job (Major Jobs & General Jobs)
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Fabrication and Erection (Major): - Replacement of worn out M.S. vertical supporting channels & side plate of final molasses storage tank No. 2 with M.S Plate and channels. 1 1 Per Ton
2 2 Dismantling, loading of Shaft of B- vacuum crystallizer from closed sugar mill and unloading at CSM Nakodar. (rates with welding and cutting material) 2 2 Lump Sum
3 3 Dismantling, Erection and Commissioning of B-Vacuum Crystallizer Central shaft including Gear, worm wheel & motor fitting. 3 3 Lump Sum
4 4 Strengthening of pans shell with angle and channels in round shape with MS angle 75x75mm and Dia 4.34 mtr.( Two rounds) 4 4 Per running. Mtr
5 5 Strengthening of Evaporator shell with angle and channels in round shape with MS angle 75x75mm and Dia 2.80 mtr.( Two rounds) 5 5 Per running. Mtr
6 6 Dismantling, Fabrication, Erection of top cone below save all of evaporators 6 6 Per inch Dia
7 7 Dismantling, Fabrication, Erection of Complete Save all (existing design) of 2nd Body evaporators including top plate , inner and outer shell. 7 7 Lump Sum
8 8 Dismantling, Fabrication, Erection of Save all (existing design) Inner plate of 2nd Body evaporators 8 8 Lump Sum
9 9 Dismantling, Fabrication, Erection of umbrella of save all Evaporator 4th body as per existing design including all supporting. 9 9 Lump Sum
10 10 Dismantling, Fabrication and erection of Quad condensate tank including all connection. Size Dia 509mm x length 1800mm 10 10 Lump sum
11 11 Dismantling, Fabrication, Erection of Hot water receiving tank of water weighing scale. The Erection work for this job will also include all connections which are dismantled during dismantling. 11 11 Per Ton.
12 12 Dismantling, fabrication & Erection of juice feed boxes of juice heater double bead valve. The Erection work for this job will also include all connections which are dismantled during dismantling. 12 12 Lump Sum each
13 13 Dismantling, fabrication & Erection of absorption tower of Syrup Sulphiter. The Erection work for this job will also include all connections which are dismantled during dismantling 13 13 Lump Sum
14 14 Dismantling, Fabrication & Erection of worn out Stainer of juice Sulphiter Pump. 14 14 Lump Sum
15 15 Dismantling, Fabrication & Erection of worn out portion of Bottom Cone of juice Sulphiter 15 15 Lump Sum
16 16 Dismantling, fabrication and Erection of the sulphur furnace with existing design ( By 20 mm MS plate) This work include dismantling and Erection of all connections, man hole, flanges etc of sulphur Furnace. 16 16 Lump Sum
17 17 Dismantling, fabrication and Erection of Melter of Sulphur furnace as per Existing design. This work include dismantling and Erection of all connections, man hole, flanges etc. 17 17 Lump Sum
18 18 Dismantling, fabrication and Erection of Scrubber of Sulphur furnace as per Existing design . This work include dismantling and Erection of all connections, man hole, flanges etc . 18 18 Lump Sum
19 19 Dismantling, Fabrication & Erection of Dorr coils (Nipple/Flange/ reducer rates as per general fabrication, Erection Rates ) 19 19 Per meter
20 20 Dismantling, Fabrication & Erection of Dorr compartment shell with MS plate channel angles. The Erection work for this job will also include all connections which are dismantled during dismantling. 20 20 Per ton
21 21 Dismantling, Fabrication & Erection of Dorr compartment/Chamber Roof with MS plate channel angles supports. The Erection work for this job will also include all connections which are dismantled during dismantling. 21 21 Per ton
22 22 Dismantling fabrication and Erection of Base plate of mud boot of Dorr to make it leak proof. 22 22 Lump Sum
23 23 Replacement of Sealing Ring of Dorr Mud boot 23 23 Lump Sum each
24 24 Dismantling , fabrication and Erection of Mud tank below RVF including all connections. 24 24 Lump Sum
25 25 Dismantling, fabrication and Erection of clear juice feed box along its telescopic valve of Dorr. 25 25 Lump Sum
26 26 Dismantling , fabrication and Erection of worn out Heavy / Light Vacuum tank of RVF including all connections. 26 26 Lump Sum/Each
27 27 Dismantling, fabrication and Erection of base plate of Dorr compartment with their supporting angle/ channel etc 27 27 Per ton
28 28 Dismantling, fabrication & Erection of filter Juice Sealing Bottles of receiving pit for vacuum filter. The Erection work for this job will also include all connections which are dismantled during dismantling. 28 28 Lump Sum Each
29 29 Dismantling fabrication and Erection of filtrate juice receiving tanks for vacuum filter. The Erection work for this job will also include all connections which are dismantled during dismantling. 29 29 Lump Sum each
30 30 Dismantling Fabrication and Erection of MS barometric condenser of RVF. This job will include all connections which are dismantled during dismantling. 30 30 Lump Sum Each
31 31 Dismantling fabrication and Erection of Bagacillo pipeline 31 31 Per inch Dia per mtr
32 32 Dismantling, Fabrication & Erection of Bagacillo Cyclone. 32 32 Lump Sum
33 33 Dismantling, Fabrication & Erection of Bagacillo Chute. 33 33 Per ton.
34 34 Dismantling, Fabrication & Erection of Bottom trough of Mud Mixer for RVF 34 34 Per Running Meter
35 35 Dismantling, Fabrication & Erection of screw conveyor of Mud Mixer 35 35 Lump Sum
36 36 Dismantling, fabrication and Erection of vapour pipe of size Dia- 1050mm 36 36 Per Ton
37 36.1 Dismantling, fabrication and Erection of vapour pipe of size Dia- 900mm 37 37 Per Ton
38 36.2 Dismantling, fabrication and Erection of vapour pipe of size Dia- 720mm 38 38 Per Ton
39 36.3 Dismantling, fabrication and Erection of vapour pipe of size Dia- 620mm 39 39 Per Ton
40 36.4 Dismantling, fabrication and Erection of vapour pipe of size Dia- 520mm 40 40 Per Ton
41 36.5 Dismantling, fabrication and Erection of vapour pipe of size Dia- 420mm 41 41 Per Ton
42 37 Dismantling, Fabrication & Erection Vapour/Exhaust pipe bend Dia - 900mm 42 42 Per Pc.
43 38 Dismantling, fabrication and Erection of distance piece of vapour pipe length up to 1.5 mtr. Dia- 1050mm 43 43 Lump Sum
44 38.1 Dismantling, fabrication and Erection of distance piece of vapour pipe length up to 1.5 mtr. Dia- 900mm 44 44 Lump Sum
45 38.2 Dismantling, fabrication and Erection of distance piece of vapour pipe length up to 1.5 mtr. Dia- 720mm 45 45 Lump Sum
46 38.3 Dismantling, fabrication and Erection of distance piece of vapour pipe length up to 1.5 mtr. Dia- 620mm 46 46 Lump Sum
47 38.4 Dismantling, fabrication and Erection of distance piece of vapour pipe length up to 1.5 mtr. Dia- 520mm 47 47 Lump Sum
48 38.5 Dismantling, fabrication and Erection of distance piece of vapour pipe length up to 1.5 mtr. Dia- 420mm 48 48 Lump Sum
49 39 Dismantling of MS/CI condenser cone of Pans 49 49 Per Pc.
50 40 Fabrication of MS condenser cone of Pans 50 50 Per Pc.
51 41 Erection of MS/CI condenser cone of Pans 51 51 Per Pc.
52 42 Dismantling, Fabrication, Erection of umbrellas of pan save all as per existing design including all supporting. 52 52 Lump Sum
53 43 Replacement of worn out portion of bottom, side plate & supporting angle/channel of syrup and molasses tank at Pan station 53 53 Per Ton
54 44 Replacement of M.S Plate Gutter of Crystallizer station and other factory units. 54 54 Per meter
55 45 Replacement of worn out portion of pan soucer 55 55 Per ton
56 46 Dismantling, fabrication and Erection of downtake of Pan from 10/12mm plate 56 56 Lump Sum
57 47 Dismantling, fabrication and Erection Distributor of pans 57 57 Per Pc.
58 48 Dismantling, Fabrication & Erection of Worn out portion of molasses conditioner. This work includes dismantling and Erection of all connection pipes and their drive unit. 58 58 Per ton
59 49 Dismantling, fabrication and Erection of worn out bottom portion of crystallizer 59 59 Running meter
60 50 Fabrication and Erection of catcher for C-Vacuum Crystallizer. 60 60 Lump Sum
61 51 Replacement of crystallizer arms along with supports from 75x75mm M.S angle. a) Dismantling 61 61 Rate for per arm
62 51.1 Replacement of crystallizer arms along with supports from 75x75mm M.S angle. b) Fabrication 62 62 Rate for per arm
63 51.2 Replacement of crystallizer arms along with supports from 75x75mm M.S angle. c) Errection 63 63 Rate for per arm
64 52 Dismantling, fabrication & Erection of cooling coils of Crystallizer including all connections. 64 64 Per Pc.
65 53 Dismantling and Erection of branch pipes of spray pond. This work include all connections of clusters, 65 65 Per inch dia per meter
66 54 Dismantling of CI/MS main pipeline spray pond 66 66 Per inch dia per mtr.
67 55 Dismantling fabrication & Erection of suction pipes of injection pumps with stainer. 67 67 Per Pc.
68 56 Dismantling fabrication & Erection of suction pipes of Spray pumps with stainer. 68 68 Per pcs
69 57 Erection and Commissioning of magma mixture Complete ( pump , Reduction gear Pipeline). Fabrication of Beds and including all connections. 69 69 Lump Sum
70 58 Dismantling ,Fabrication Erection of worn out Bottom half portion of B magma mixture including all connections. 70 70 Per Running Meter
71 59 Dismantling, Fabrication and Erection of worn out Bottom half portion of A pug mill including all connections. 71 71 Per Running Meter
72 60 Dismantling, Fabrication and Erection of worn out portion of Sugar Hopper along with its alignment. Size 4’ wide x 2 mtr Length 72 72 Lump Sum
73 61 Dismantling, Fabrication and Erection of Sugar Melter Pump stainer Including all connections 73 73 Lump Sum
74 62 Fabrication and Erection of Bed for pump and motor of Magma mixture along with suction and delivery pipe line connections, alignment of motor with pump etc. 74 74 Lump Sum
75 63 Modification of Bagacillo screen for easy operation with fitting of ball bearings, wheels & Guides in all respects. 75 75 Lump Sum per pc
76 64 Dismantling, fabrication and Erection of bottom discharge chute of continuous centrifugal machine 76 76 Lump Sum
77 65 Fabrication and Erection of new syrup tank at pan station including all connections. 77 77 Per Ton
78 66 Dismantling, Fabrication and Erection of ammonia coils of pans from MS pipe Dia 3” including all connection 78 78 Lump Sum
79 67 Dismantling and Erection of Tube plate (Top and Bottom) 2nd evaporator body including Fabrication and erection of downtake including all connections. 79 79 Lump Sum
80 68 Dismantling and Erection of Tube plate(Top and Bottom) of Pan No. 1 including all connections along with Fabrication and erection of downtake and dismantling a& erection of distributor . 80 80 Lump Sum
81 69 Fabrication and erection of Beds for Pump and Motor etc. 81 81 Lump sum
82 70 Dismantling and Erection of Crystallizer shaft including arms and all connections, Fittings. 82 82 Lump Sum
83 71 Dismantling, Fabrication and Erection of internal plates of catcher for Semi kestner 83 83 Per ton
84 72 Dismantling and Erection of fabricated globe valve 30 “ in exhaust line of vapour cell. 84 84 Lump Sum
85 73 Dismantling, fabrication and erection of quad body shell Including all connections. 85 85 Per Ton
86 74 Cane cutter hoods from 8-10mm thick plate with MS Angles etc. Dismantling, Fabrication and Erection 86 86 Per Ton
87 75 Dismantling, fabrication and Erection of Expansion joint of power turbine exhaust line from MS plate. 87 87 Lump Sum
88 76 Replacement of side plates of cane carrier chain/ RBC and trough of RBC /Bagasse elevator. 88 88 Per Sq. feet
89 77 Replacement of channel and I-Beam of RBC/ Cane Carrier/ Bagasse Elevator/ Cross RBC Runner 89 89 Per meter
90 78 Dismantling, fabrication erection of juice tray of mill No. 3 from SS/MS plate 90 90 Lump Sum
91 79 Fabrication of screw conveyor of Mill House 91 91 Lump Sum
92 80 Dismantling, fabrication erection of ash hopper of boiler (pyjamas) cone with chute bottom portion. (cone tapper portion size 15” approximate) 92 92 Lumps Sum each
93 81 Dismantling, Fabrication of trough of screw conveyor, assembly of screw conveyor with trough & its erection. 93 93 Lump Sum
94 82 Repair of rotary bagasse feeders of boilers A) Body 94 94 Lump Sum
95 82.1 Repair of rotary bagasse feeders of boilers A) Rotor 95 95 Lump Sum
96 83 Replacement of side plate 3mm/old ms plate of boiler (with MS plate & supporting angle/ flat) 96 96 Per Ton
97 83.1 Dismantling, fabrication & erection of worn out ducting of boiler & APCD including angle, channel, Flats & flanges 97 97 Per ton
98 84 Dismantling, Fabrication & Erection damper of boiler ducting 98 98 Lump Sum /per pcs
99 85 Dismantling fabrication & erection of Expansion joint of boiler ducting (3.360 mtr x 1.260 mtr) 99 99 Lump Sum per item
100 86 Replacement of MS gutter of APCD plant from wet scrubber to Ash Pits 100 100 Per mtr
101 87 Dismantling fabrication & erection of Damper of rotary Bagasse Feeder 101 101 Lump Sum per item
102 88 Dismantling, fabrication & erection of worn out portion of ID and APCD fan casing 102 102 Per MT
103 89 Replacement of sieve plates of APCD scrubber. This job also includes 10/12mm holes (324 holes per square ft.) drilling in plates 103 103 Per Sq. Mtr.
104 90 Baffle plates (MS flat 65 x 6mm) of demister in Wet Scrubber 104 104 Per meter
105 91 Repair/ replacement of wornout portion of wet scrubber of Boiler No. 1 & 2 105 105 Per ton
106 92 Dismantling fabrication and erection of receiving tank/ Sum Tank/ Sealing tank of Wet scrubber. 106 106 Lump Sum per piece
107 93 Replacement of G.I Sheet Gutter of factory building 107 107 Per meter
108 94 Fabrication and Erection (General): - Replacement of worn-out of M.S. Runner of inter carrier, elevator, RBC , cross carrier & cane carrier chains 108 108 Per Mtr.
109 95 Juice heater/V.L.J.H. tubes Dismantling 109 109 Per tube
110 95.1 Juice heater/V.L.J.H. tubes Fitting 110 110 Per tube
111 96 Semi kestner tubes Dismantling 111 111 Per tube
112 96.1 Semi kestner tubes Fitting 112 112 Per tube
113 97 Quad bodies SS tubes 1st to 4th Dismantling 113 113 Per tube
114 97.1 Quad bodies SS tubes 1st to 4th Fitting 114 114 Per tube
115 98 Pans tubes SS 1st to 5th Dismantling 115 108 Per tube
116 98.1 Pans tubes SS 1st to 5th Fitting 116 109 Per tube
117 99 Welding joints of water , juice , vapor and exhaust pipe line of Exhaust Pipe Lines of all Sizes. 117 110 Per Inch running length
118 100 MS Pipe line 1/2" to 12” dia a) Dismantling 118 111 Per inch dia per feet
119 100.1 MS Pipe line 1/2" to 12” dia b) Fabricaton 119 112 Per inch dia per feet
120 100.2 MS Pipe line 1/2" to 12” dia c) Erection 120 113 Per inch Dia per feet
121 101 SS Pipe line 1/2" to 12” dia a) Dismantling 121 114 Per inch Dia per feet
122 101.1 SS Pipe line 1/2" to 12” dia b) Fabrication 122 108 Per inch Dia per feet
123 101.2 SS Pipe line 1/2" to 12” dia c) Erection 123 109 Per inch Dia per feet
124 102 CI Pipe line 1/2" to 12” dia a) Dismantling 124 110 Per inch Dia per feet
125 102.1 CI Pipe line 1/2" to 12” dia b) Erection 125 111 Per inch Dia per feet
126 103 CI Pipe line above 12” dia a) Dismantling 126 112 Per inch Dia per feet
127 103.1 CI Pipe line above 12” dia b) Erection 127 113 Per inch Dia per feet
128 104 MS Pipe line above 12” dia from MS plate (other than vapour pipe of pan and quad) a) Dismantling 128 114 Per MT
129 104.1 MS Pipe line above 12” dia from MS plate (other than vapour pipe of pan and quad) b) Fabrication 129 108 -do-
130 104.2 MS Pipe line above 12” dia from MS plate (other than vapour pipe of pan and quad) c) Erection 130 109 -do-
131 105 A) MS Bend upto 12” dia i) Dismantling 131 110 Per inch dia
132 105.1 A) MS Bend upto 12” dia ii) Fabrication 132 111 -do-
133 105.2 A) MS Bend upto 12” dia iii) Erection 133 112 -do-
134 105.3 B) MS Bend above 12” dia from MS plate (other than V.P. pans & quad) i) Dismantling 134 113 Per M.T.
135 105.4 B) MS Bend above 12” dia from MS plate (other than V.P. pans & quad) ii) Fabrication 135 114 Per M.T.
136 105.5 B) MS Bend above 12” dia from MS plate (other than V.P. pans & quad) iii) Erection 136 108 Per M.T.
137 106 CI Bends sizes 1” to 6” a) Dismantling 137 109 Per inch dia
138 106.1 CI Bends sizes 1” to 6” b) Erection 138 110 Per inch dia
139 107 Dismantling, Fabrication& Erection of M.S (all sizes) a) Tee 139 111 Per inch Dia
140 107.1 Dismantling, Fabrication& Erection of M.S (all sizes) b) Nipples 140 112 Per inch Dia
141 107.2 Dismantling, Fabrication& Erection of M.S (all sizes) c) Crosses 141 109 Per inch Dia
142 107.3 Dismantling, Fabrication& Erection of M.S (all sizes) d) Reducers 142 110 Per inch Dia
143 107.4 Dismantling, Fabrication& Erection of M.S (all sizes) e) Elbow 143 111 Per inch Dia
144 108 Dismantling, Fabrication& Erection of S.S (all sizes) a) Tee 144 112 Per inch Dia
145 108.1 Dismantling, Fabrication& Erection of S.S (all sizes) b) Nipples 145 113 Per inch Dia
146 108.2 Dismantling, Fabrication& Erection of S.S (all sizes) c) Crosses 146 114 Per inch Dia
147 108.3 Dismantling, Fabrication& Erection of S.S (all sizes) d) Reducers 147 108 Per inch Dia
148 108.4 Dismantling, Fabrication& Erection of S.S (all sizes) e) Flange 148 109 Per inch Dia
149 108.5 Dismantling, Fabrication& Erection of S.S (all sizes) f) Elbow 149 110 Per inch Dia
150 108.6 Dismantling, Fabrication& Erection of S.S (all sizes) g) Bend 150 111 Per inch Dia
151 109 Replacement of wornout MS Cone (all sizes) 151 112 Per inch Dia
152 110 MS Flanges (all sizes) a) Dismantling 152 113 Per inch Dia
153 110.1 MS Flanges (all sizes) b) Fabrication 153 114 Per inch Dia
154 110.2 MS Flanges (all sizes) c) Erection 154 108 Per inch Dia
155 111 Man Holes (all sizes) a) Dismantling 155 109 Lump Sump
156 111.1 Man Holes (all sizes) b) Fabrication 156 110 Lump Sump
157 111.2 Man Holes (all sizes) c) Erection 157 111 Lump Sump
158 112 a) Dismantling of platform plate 158 112 P sq. Mtr.
159 112.1 b) Fabrication & Erection of platform plate 159 113 P sq. Mtr.
160 113 M.S. Tank having round & conical & rectangular bottoms a) Dismantling 160 114 Per MT
161 113.1 M.S. Tank having round & conical & rectangular bottoms b) Fabrication 161 108 Per MT
162 113.2 M.S. Tank having round & conical & rectangular bottoms c) Erection 162 109 Per MT
163 114 M.S Structure Trusses, Perlins, Columns & Beams (Factory Building) a) Dismantling 163 110 Per MT
164 114.1 M.S Structure Trusses, Perlins, Columns & Beams (Factory Building) b) Fabrication 164 111 Per MT
165 114.2 M.S Structure Trusses, Perlins, Columns & Beams (Factory Building) c) Erection 165 112 Per MT
166 115 Platform railing from old pipe & angle a) Dismantling 166 113 Per Mtr
167 115.1 Platform railing from old pipe & angle b) Erection 167 114 Per Mtr
168 116 Electric panel ,DB and other machinery shed GI/ACC/MS sheet a) Dismantling 168 108 Per Sq ft
169 116.1 Electric panel ,DB and other machinery shed GI/ACC/MS sheet b) Fabrication 169 109 Per Sq ft
170 116.2 Electric panel ,DB and other machinery shed GI/ACC/MS sheet c) Erection 170 110 Per Sq ft
171 117 Patch work of any part of any equipment with 3mm to 10mm thick plate max. upto 1 sq meter 171 111 Per Sq ft
172 118 Dismantling of sluice valve/ angle valve/ N.R.V. 172 112 Per inch Dia
173 119 Erection of sluice valve/ angle valve/ N.R.V. ,Butterfly Valve 173 113 Per inch Dia
174 120 Replacement of Rail line of cane unloader with 50mm square bar 174 114 Per Mtr.
175 121 Replacement of Feed box of Pans including all connections 175 108 Lump sump
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail