Name of the Work: Fabrication Job (Major Jobs & General Jobs) | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Fabrication and Erection (Major): - Replacement of worn out M.S. vertical supporting channels & side plate of final molasses storage tank No. 2 with M.S Plate and channels. | 1 | 1 | Per Ton |
2 | 2 | Dismantling, loading of Shaft of B- vacuum crystallizer from closed sugar mill and unloading at CSM Nakodar. (rates with welding and cutting material) | 2 | 2 | Lump Sum |
3 | 3 | Dismantling, Erection and Commissioning of B-Vacuum Crystallizer Central shaft including Gear, worm wheel & motor fitting. | 3 | 3 | Lump Sum |
4 | 4 | Strengthening of pans shell with angle and channels in round shape with MS angle 75x75mm and Dia 4.34 mtr.( Two rounds) | 4 | 4 | Per running. Mtr |
5 | 5 | Strengthening of Evaporator shell with angle and channels in round shape with MS angle 75x75mm and Dia 2.80 mtr.( Two rounds) | 5 | 5 | Per running. Mtr |
6 | 6 | Dismantling, Fabrication, Erection of top cone below save all of evaporators | 6 | 6 | Per inch Dia |
7 | 7 | Dismantling, Fabrication, Erection of Complete Save all (existing design) of 2nd Body evaporators including top plate , inner and outer shell. | 7 | 7 | Lump Sum |
8 | 8 | Dismantling, Fabrication, Erection of Save all (existing design) Inner plate of 2nd Body evaporators | 8 | 8 | Lump Sum |
9 | 9 | Dismantling, Fabrication, Erection of umbrella of save all Evaporator 4th body as per existing design including all supporting. | 9 | 9 | Lump Sum |
10 | 10 | Dismantling, Fabrication and erection of Quad condensate tank including all connection. Size Dia 509mm x length 1800mm | 10 | 10 | Lump sum |
11 | 11 | Dismantling, Fabrication, Erection of Hot water receiving tank of water weighing scale. The Erection work for this job will also include all connections which are dismantled during dismantling. | 11 | 11 | Per Ton. |
12 | 12 | Dismantling, fabrication & Erection of juice feed boxes of juice heater double bead valve. The Erection work for this job will also include all connections which are dismantled during dismantling. | 12 | 12 | Lump Sum each |
13 | 13 | Dismantling, fabrication & Erection of absorption tower of Syrup Sulphiter. The Erection work for this job will also include all connections which are dismantled during dismantling | 13 | 13 | Lump Sum |
14 | 14 | Dismantling, Fabrication & Erection of worn out Stainer of juice Sulphiter Pump. | 14 | 14 | Lump Sum |
15 | 15 | Dismantling, Fabrication & Erection of worn out portion of Bottom Cone of juice Sulphiter | 15 | 15 | Lump Sum |
16 | 16 | Dismantling, fabrication and Erection of the sulphur furnace with existing design ( By 20 mm MS plate) This work include dismantling and Erection of all connections, man hole, flanges etc of sulphur Furnace. | 16 | 16 | Lump Sum |
17 | 17 | Dismantling, fabrication and Erection of Melter of Sulphur furnace as per Existing design. This work include dismantling and Erection of all connections, man hole, flanges etc. | 17 | 17 | Lump Sum |
18 | 18 | Dismantling, fabrication and Erection of Scrubber of Sulphur furnace as per Existing design . This work include dismantling and Erection of all connections, man hole, flanges etc . | 18 | 18 | Lump Sum |
19 | 19 | Dismantling, Fabrication & Erection of Dorr coils (Nipple/Flange/ reducer rates as per general fabrication, Erection Rates ) | 19 | 19 | Per meter |
20 | 20 | Dismantling, Fabrication & Erection of Dorr compartment shell with MS plate channel angles. The Erection work for this job will also include all connections which are dismantled during dismantling. | 20 | 20 | Per ton |
21 | 21 | Dismantling, Fabrication & Erection of Dorr compartment/Chamber Roof with MS plate channel angles supports. The Erection work for this job will also include all connections which are dismantled during dismantling. | 21 | 21 | Per ton |
22 | 22 | Dismantling fabrication and Erection of Base plate of mud boot of Dorr to make it leak proof. | 22 | 22 | Lump Sum |
23 | 23 | Replacement of Sealing Ring of Dorr Mud boot | 23 | 23 | Lump Sum each |
24 | 24 | Dismantling , fabrication and Erection of Mud tank below RVF including all connections. | 24 | 24 | Lump Sum |
25 | 25 | Dismantling, fabrication and Erection of clear juice feed box along its telescopic valve of Dorr. | 25 | 25 | Lump Sum |
26 | 26 | Dismantling , fabrication and Erection of worn out Heavy / Light Vacuum tank of RVF including all connections. | 26 | 26 | Lump Sum/Each |
27 | 27 | Dismantling, fabrication and Erection of base plate of Dorr compartment with their supporting angle/ channel etc | 27 | 27 | Per ton |
28 | 28 | Dismantling, fabrication & Erection of filter Juice Sealing Bottles of receiving pit for vacuum filter. The Erection work for this job will also include all connections which are dismantled during dismantling. | 28 | 28 | Lump Sum Each |
29 | 29 | Dismantling fabrication and Erection of filtrate juice receiving tanks for vacuum filter. The Erection work for this job will also include all connections which are dismantled during dismantling. | 29 | 29 | Lump Sum each |
30 | 30 | Dismantling Fabrication and Erection of MS barometric condenser of RVF. This job will include all connections which are dismantled during dismantling. | 30 | 30 | Lump Sum Each |
31 | 31 | Dismantling fabrication and Erection of Bagacillo pipeline | 31 | 31 | Per inch Dia per mtr |
32 | 32 | Dismantling, Fabrication & Erection of Bagacillo Cyclone. | 32 | 32 | Lump Sum |
33 | 33 | Dismantling, Fabrication & Erection of Bagacillo Chute. | 33 | 33 | Per ton. |
34 | 34 | Dismantling, Fabrication & Erection of Bottom trough of Mud Mixer for RVF | 34 | 34 | Per Running Meter |
35 | 35 | Dismantling, Fabrication & Erection of screw conveyor of Mud Mixer | 35 | 35 | Lump Sum |
36 | 36 | Dismantling, fabrication and Erection of vapour pipe of size Dia- 1050mm | 36 | 36 | Per Ton |
37 | 36.1 | Dismantling, fabrication and Erection of vapour pipe of size Dia- 900mm | 37 | 37 | Per Ton |
38 | 36.2 | Dismantling, fabrication and Erection of vapour pipe of size Dia- 720mm | 38 | 38 | Per Ton |
39 | 36.3 | Dismantling, fabrication and Erection of vapour pipe of size Dia- 620mm | 39 | 39 | Per Ton |
40 | 36.4 | Dismantling, fabrication and Erection of vapour pipe of size Dia- 520mm | 40 | 40 | Per Ton |
41 | 36.5 | Dismantling, fabrication and Erection of vapour pipe of size Dia- 420mm | 41 | 41 | Per Ton |
42 | 37 | Dismantling, Fabrication & Erection Vapour/Exhaust pipe bend Dia - 900mm | 42 | 42 | Per Pc. |
43 | 38 | Dismantling, fabrication and Erection of distance piece of vapour pipe length up to 1.5 mtr. Dia- 1050mm | 43 | 43 | Lump Sum |
44 | 38.1 | Dismantling, fabrication and Erection of distance piece of vapour pipe length up to 1.5 mtr. Dia- 900mm | 44 | 44 | Lump Sum |
45 | 38.2 | Dismantling, fabrication and Erection of distance piece of vapour pipe length up to 1.5 mtr. Dia- 720mm | 45 | 45 | Lump Sum |
46 | 38.3 | Dismantling, fabrication and Erection of distance piece of vapour pipe length up to 1.5 mtr. Dia- 620mm | 46 | 46 | Lump Sum |
47 | 38.4 | Dismantling, fabrication and Erection of distance piece of vapour pipe length up to 1.5 mtr. Dia- 520mm | 47 | 47 | Lump Sum |
48 | 38.5 | Dismantling, fabrication and Erection of distance piece of vapour pipe length up to 1.5 mtr. Dia- 420mm | 48 | 48 | Lump Sum |
49 | 39 | Dismantling of MS/CI condenser cone of Pans | 49 | 49 | Per Pc. |
50 | 40 | Fabrication of MS condenser cone of Pans | 50 | 50 | Per Pc. |
51 | 41 | Erection of MS/CI condenser cone of Pans | 51 | 51 | Per Pc. |
52 | 42 | Dismantling, Fabrication, Erection of umbrellas of pan save all as per existing design including all supporting. | 52 | 52 | Lump Sum |
53 | 43 | Replacement of worn out portion of bottom, side plate & supporting angle/channel of syrup and molasses tank at Pan station | 53 | 53 | Per Ton |
54 | 44 | Replacement of M.S Plate Gutter of Crystallizer station and other factory units. | 54 | 54 | Per meter |
55 | 45 | Replacement of worn out portion of pan soucer | 55 | 55 | Per ton |
56 | 46 | Dismantling, fabrication and Erection of downtake of Pan from 10/12mm plate | 56 | 56 | Lump Sum |
57 | 47 | Dismantling, fabrication and Erection Distributor of pans | 57 | 57 | Per Pc. |
58 | 48 | Dismantling, Fabrication & Erection of Worn out portion of molasses conditioner. This work includes dismantling and Erection of all connection pipes and their drive unit. | 58 | 58 | Per ton |
59 | 49 | Dismantling, fabrication and Erection of worn out bottom portion of crystallizer | 59 | 59 | Running meter |
60 | 50 | Fabrication and Erection of catcher for C-Vacuum Crystallizer. | 60 | 60 | Lump Sum |
61 | 51 | Replacement of crystallizer arms along with supports from 75x75mm M.S angle. a) Dismantling | 61 | 61 | Rate for per arm |
62 | 51.1 | Replacement of crystallizer arms along with supports from 75x75mm M.S angle. b) Fabrication | 62 | 62 | Rate for per arm |
63 | 51.2 | Replacement of crystallizer arms along with supports from 75x75mm M.S angle. c) Errection | 63 | 63 | Rate for per arm |
64 | 52 | Dismantling, fabrication & Erection of cooling coils of Crystallizer including all connections. | 64 | 64 | Per Pc. |
65 | 53 | Dismantling and Erection of branch pipes of spray pond. This work include all connections of clusters, | 65 | 65 | Per inch dia per meter |
66 | 54 | Dismantling of CI/MS main pipeline spray pond | 66 | 66 | Per inch dia per mtr. |
67 | 55 | Dismantling fabrication & Erection of suction pipes of injection pumps with stainer. | 67 | 67 | Per Pc. |
68 | 56 | Dismantling fabrication & Erection of suction pipes of Spray pumps with stainer. | 68 | 68 | Per pcs |
69 | 57 | Erection and Commissioning of magma mixture Complete ( pump , Reduction gear Pipeline). Fabrication of Beds and including all connections. | 69 | 69 | Lump Sum |
70 | 58 | Dismantling ,Fabrication Erection of worn out Bottom half portion of B magma mixture including all connections. | 70 | 70 | Per Running Meter |
71 | 59 | Dismantling, Fabrication and Erection of worn out Bottom half portion of A pug mill including all connections. | 71 | 71 | Per Running Meter |
72 | 60 | Dismantling, Fabrication and Erection of worn out portion of Sugar Hopper along with its alignment. Size 4’ wide x 2 mtr Length | 72 | 72 | Lump Sum |
73 | 61 | Dismantling, Fabrication and Erection of Sugar Melter Pump stainer Including all connections | 73 | 73 | Lump Sum |
74 | 62 | Fabrication and Erection of Bed for pump and motor of Magma mixture along with suction and delivery pipe line connections, alignment of motor with pump etc. | 74 | 74 | Lump Sum |
75 | 63 | Modification of Bagacillo screen for easy operation with fitting of ball bearings, wheels & Guides in all respects. | 75 | 75 | Lump Sum per pc |
76 | 64 | Dismantling, fabrication and Erection of bottom discharge chute of continuous centrifugal machine | 76 | 76 | Lump Sum |
77 | 65 | Fabrication and Erection of new syrup tank at pan station including all connections. | 77 | 77 | Per Ton |
78 | 66 | Dismantling, Fabrication and Erection of ammonia coils of pans from MS pipe Dia 3” including all connection | 78 | 78 | Lump Sum |
79 | 67 | Dismantling and Erection of Tube plate (Top and Bottom) 2nd evaporator body including Fabrication and erection of downtake including all connections. | 79 | 79 | Lump Sum |
80 | 68 | Dismantling and Erection of Tube plate(Top and Bottom) of Pan No. 1 including all connections along with Fabrication and erection of downtake and dismantling a& erection of distributor . | 80 | 80 | Lump Sum |
81 | 69 | Fabrication and erection of Beds for Pump and Motor etc. | 81 | 81 | Lump sum |
82 | 70 | Dismantling and Erection of Crystallizer shaft including arms and all connections, Fittings. | 82 | 82 | Lump Sum |
83 | 71 | Dismantling, Fabrication and Erection of internal plates of catcher for Semi kestner | 83 | 83 | Per ton |
84 | 72 | Dismantling and Erection of fabricated globe valve 30 “ in exhaust line of vapour cell. | 84 | 84 | Lump Sum |
85 | 73 | Dismantling, fabrication and erection of quad body shell Including all connections. | 85 | 85 | Per Ton |
86 | 74 | Cane cutter hoods from 8-10mm thick plate with MS Angles etc. Dismantling, Fabrication and Erection | 86 | 86 | Per Ton |
87 | 75 | Dismantling, fabrication and Erection of Expansion joint of power turbine exhaust line from MS plate. | 87 | 87 | Lump Sum |
88 | 76 | Replacement of side plates of cane carrier chain/ RBC and trough of RBC /Bagasse elevator. | 88 | 88 | Per Sq. feet |
89 | 77 | Replacement of channel and I-Beam of RBC/ Cane Carrier/ Bagasse Elevator/ Cross RBC Runner | 89 | 89 | Per meter |
90 | 78 | Dismantling, fabrication erection of juice tray of mill No. 3 from SS/MS plate | 90 | 90 | Lump Sum |
91 | 79 | Fabrication of screw conveyor of Mill House | 91 | 91 | Lump Sum |
92 | 80 | Dismantling, fabrication erection of ash hopper of boiler (pyjamas) cone with chute bottom portion. (cone tapper portion size 15” approximate) | 92 | 92 | Lumps Sum each |
93 | 81 | Dismantling, Fabrication of trough of screw conveyor, assembly of screw conveyor with trough & its erection. | 93 | 93 | Lump Sum |
94 | 82 | Repair of rotary bagasse feeders of boilers A) Body | 94 | 94 | Lump Sum |
95 | 82.1 | Repair of rotary bagasse feeders of boilers A) Rotor | 95 | 95 | Lump Sum |
96 | 83 | Replacement of side plate 3mm/old ms plate of boiler (with MS plate & supporting angle/ flat) | 96 | 96 | Per Ton |
97 | 83.1 | Dismantling, fabrication & erection of worn out ducting of boiler & APCD including angle, channel, Flats & flanges | 97 | 97 | Per ton |
98 | 84 | Dismantling, Fabrication & Erection damper of boiler ducting | 98 | 98 | Lump Sum /per pcs |
99 | 85 | Dismantling fabrication & erection of Expansion joint of boiler ducting (3.360 mtr x 1.260 mtr) | 99 | 99 | Lump Sum per item |
100 | 86 | Replacement of MS gutter of APCD plant from wet scrubber to Ash Pits | 100 | 100 | Per mtr |
101 | 87 | Dismantling fabrication & erection of Damper of rotary Bagasse Feeder | 101 | 101 | Lump Sum per item |
102 | 88 | Dismantling, fabrication & erection of worn out portion of ID and APCD fan casing | 102 | 102 | Per MT |
103 | 89 | Replacement of sieve plates of APCD scrubber. This job also includes 10/12mm holes (324 holes per square ft.) drilling in plates | 103 | 103 | Per Sq. Mtr. |
104 | 90 | Baffle plates (MS flat 65 x 6mm) of demister in Wet Scrubber | 104 | 104 | Per meter |
105 | 91 | Repair/ replacement of wornout portion of wet scrubber of Boiler No. 1 & 2 | 105 | 105 | Per ton |
106 | 92 | Dismantling fabrication and erection of receiving tank/ Sum Tank/ Sealing tank of Wet scrubber. | 106 | 106 | Lump Sum per piece |
107 | 93 | Replacement of G.I Sheet Gutter of factory building | 107 | 107 | Per meter |
108 | 94 | Fabrication and Erection (General): - Replacement of worn-out of M.S. Runner of inter carrier, elevator, RBC , cross carrier & cane carrier chains | 108 | 108 | Per Mtr. |
109 | 95 | Juice heater/V.L.J.H. tubes Dismantling | 109 | 109 | Per tube |
110 | 95.1 | Juice heater/V.L.J.H. tubes Fitting | 110 | 110 | Per tube |
111 | 96 | Semi kestner tubes Dismantling | 111 | 111 | Per tube |
112 | 96.1 | Semi kestner tubes Fitting | 112 | 112 | Per tube |
113 | 97 | Quad bodies SS tubes 1st to 4th Dismantling | 113 | 113 | Per tube |
114 | 97.1 | Quad bodies SS tubes 1st to 4th Fitting | 114 | 114 | Per tube |
115 | 98 | Pans tubes SS 1st to 5th Dismantling | 115 | 108 | Per tube |
116 | 98.1 | Pans tubes SS 1st to 5th Fitting | 116 | 109 | Per tube |
117 | 99 | Welding joints of water , juice , vapor and exhaust pipe line of Exhaust Pipe Lines of all Sizes. | 117 | 110 | Per Inch running length |
118 | 100 | MS Pipe line 1/2" to 12” dia a) Dismantling | 118 | 111 | Per inch dia per feet |
119 | 100.1 | MS Pipe line 1/2" to 12” dia b) Fabricaton | 119 | 112 | Per inch dia per feet |
120 | 100.2 | MS Pipe line 1/2" to 12” dia c) Erection | 120 | 113 | Per inch Dia per feet |
121 | 101 | SS Pipe line 1/2" to 12” dia a) Dismantling | 121 | 114 | Per inch Dia per feet |
122 | 101.1 | SS Pipe line 1/2" to 12” dia b) Fabrication | 122 | 108 | Per inch Dia per feet |
123 | 101.2 | SS Pipe line 1/2" to 12” dia c) Erection | 123 | 109 | Per inch Dia per feet |
124 | 102 | CI Pipe line 1/2" to 12” dia a) Dismantling | 124 | 110 | Per inch Dia per feet |
125 | 102.1 | CI Pipe line 1/2" to 12” dia b) Erection | 125 | 111 | Per inch Dia per feet |
126 | 103 | CI Pipe line above 12” dia a) Dismantling | 126 | 112 | Per inch Dia per feet |
127 | 103.1 | CI Pipe line above 12” dia b) Erection | 127 | 113 | Per inch Dia per feet |
128 | 104 | MS Pipe line above 12” dia from MS plate (other than vapour pipe of pan and quad) a) Dismantling | 128 | 114 | Per MT |
129 | 104.1 | MS Pipe line above 12” dia from MS plate (other than vapour pipe of pan and quad) b) Fabrication | 129 | 108 | -do- |
130 | 104.2 | MS Pipe line above 12” dia from MS plate (other than vapour pipe of pan and quad) c) Erection | 130 | 109 | -do- |
131 | 105 | A) MS Bend upto 12” dia i) Dismantling | 131 | 110 | Per inch dia |
132 | 105.1 | A) MS Bend upto 12” dia ii) Fabrication | 132 | 111 | -do- |
133 | 105.2 | A) MS Bend upto 12” dia iii) Erection | 133 | 112 | -do- |
134 | 105.3 | B) MS Bend above 12” dia from MS plate (other than V.P. pans & quad) i) Dismantling | 134 | 113 | Per M.T. |
135 | 105.4 | B) MS Bend above 12” dia from MS plate (other than V.P. pans & quad) ii) Fabrication | 135 | 114 | Per M.T. |
136 | 105.5 | B) MS Bend above 12” dia from MS plate (other than V.P. pans & quad) iii) Erection | 136 | 108 | Per M.T. |
137 | 106 | CI Bends sizes 1” to 6” a) Dismantling | 137 | 109 | Per inch dia |
138 | 106.1 | CI Bends sizes 1” to 6” b) Erection | 138 | 110 | Per inch dia |
139 | 107 | Dismantling, Fabrication& Erection of M.S (all sizes) a) Tee | 139 | 111 | Per inch Dia |
140 | 107.1 | Dismantling, Fabrication& Erection of M.S (all sizes) b) Nipples | 140 | 112 | Per inch Dia |
141 | 107.2 | Dismantling, Fabrication& Erection of M.S (all sizes) c) Crosses | 141 | 109 | Per inch Dia |
142 | 107.3 | Dismantling, Fabrication& Erection of M.S (all sizes) d) Reducers | 142 | 110 | Per inch Dia |
143 | 107.4 | Dismantling, Fabrication& Erection of M.S (all sizes) e) Elbow | 143 | 111 | Per inch Dia |
144 | 108 | Dismantling, Fabrication& Erection of S.S (all sizes) a) Tee | 144 | 112 | Per inch Dia |
145 | 108.1 | Dismantling, Fabrication& Erection of S.S (all sizes) b) Nipples | 145 | 113 | Per inch Dia |
146 | 108.2 | Dismantling, Fabrication& Erection of S.S (all sizes) c) Crosses | 146 | 114 | Per inch Dia |
147 | 108.3 | Dismantling, Fabrication& Erection of S.S (all sizes) d) Reducers | 147 | 108 | Per inch Dia |
148 | 108.4 | Dismantling, Fabrication& Erection of S.S (all sizes) e) Flange | 148 | 109 | Per inch Dia |
149 | 108.5 | Dismantling, Fabrication& Erection of S.S (all sizes) f) Elbow | 149 | 110 | Per inch Dia |
150 | 108.6 | Dismantling, Fabrication& Erection of S.S (all sizes) g) Bend | 150 | 111 | Per inch Dia |
151 | 109 | Replacement of wornout MS Cone (all sizes) | 151 | 112 | Per inch Dia |
152 | 110 | MS Flanges (all sizes) a) Dismantling | 152 | 113 | Per inch Dia |
153 | 110.1 | MS Flanges (all sizes) b) Fabrication | 153 | 114 | Per inch Dia |
154 | 110.2 | MS Flanges (all sizes) c) Erection | 154 | 108 | Per inch Dia |
155 | 111 | Man Holes (all sizes) a) Dismantling | 155 | 109 | Lump Sump |
156 | 111.1 | Man Holes (all sizes) b) Fabrication | 156 | 110 | Lump Sump |
157 | 111.2 | Man Holes (all sizes) c) Erection | 157 | 111 | Lump Sump |
158 | 112 | a) Dismantling of platform plate | 158 | 112 | P sq. Mtr. |
159 | 112.1 | b) Fabrication & Erection of platform plate | 159 | 113 | P sq. Mtr. |
160 | 113 | M.S. Tank having round & conical & rectangular bottoms a) Dismantling | 160 | 114 | Per MT |
161 | 113.1 | M.S. Tank having round & conical & rectangular bottoms b) Fabrication | 161 | 108 | Per MT |
162 | 113.2 | M.S. Tank having round & conical & rectangular bottoms c) Erection | 162 | 109 | Per MT |
163 | 114 | M.S Structure Trusses, Perlins, Columns & Beams (Factory Building) a) Dismantling | 163 | 110 | Per MT |
164 | 114.1 | M.S Structure Trusses, Perlins, Columns & Beams (Factory Building) b) Fabrication | 164 | 111 | Per MT |
165 | 114.2 | M.S Structure Trusses, Perlins, Columns & Beams (Factory Building) c) Erection | 165 | 112 | Per MT |
166 | 115 | Platform railing from old pipe & angle a) Dismantling | 166 | 113 | Per Mtr |
167 | 115.1 | Platform railing from old pipe & angle b) Erection | 167 | 114 | Per Mtr |
168 | 116 | Electric panel ,DB and other machinery shed GI/ACC/MS sheet a) Dismantling | 168 | 108 | Per Sq ft |
169 | 116.1 | Electric panel ,DB and other machinery shed GI/ACC/MS sheet b) Fabrication | 169 | 109 | Per Sq ft |
170 | 116.2 | Electric panel ,DB and other machinery shed GI/ACC/MS sheet c) Erection | 170 | 110 | Per Sq ft |
171 | 117 | Patch work of any part of any equipment with 3mm to 10mm thick plate max. upto 1 sq meter | 171 | 111 | Per Sq ft |
172 | 118 | Dismantling of sluice valve/ angle valve/ N.R.V. | 172 | 112 | Per inch Dia |
173 | 119 | Erection of sluice valve/ angle valve/ N.R.V. ,Butterfly Valve | 173 | 113 | Per inch Dia |
174 | 120 | Replacement of Rail line of cane unloader with 50mm square bar | 174 | 114 | Per Mtr. |
175 | 121 | Replacement of Feed box of Pans including all connections | 175 | 108 | Lump sump |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail